Baytown Construction
- Based in
- Daly City
- On San Francisco permits
- May 2015 to Jun 2026
- Last 24 months
- 8 permits filed
38 permits since 2000: 32 completed, 2 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jun 2026 | 2139 Green St | unit c: remodeling of kitchen an master bathroom. no structure work.Details
unit c: remodeling of kitchen an master bathroom. no structure work. | $30,000 |
| Apr 6, 2026 | Completed final sign-off Aug 2026 | 2958 Pine St | remove and replace front house handrails, rear deck, 125amp main electical panel and water heater. all work is in kind and damaged is due to dry rot.Details
remove and replace front house handrails, rear deck, 125amp main electical panel and water heater. all work is in kind and damaged is due to dry rot. | $38,000 |
| Sep 3, 2025 | Completed final sign-off Dec 2025 | 1553 Sacramento St | tub and shower surround tiles and faucet. tile floor, new vanilty and lights and gfi outlets in bathroom. no structural work or total demo.Details
tub and shower surround tiles and faucet. tile floor, new vanilty and lights and gfi outlets in bathroom. no structural work or total demo. | $8,500 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 1865 Sacramento St | unit 1: remodel kitchen - only to be done to replace bathroom vanity, wall lights, gfci & floor. no structural; in-kind work. unit 5: remodel kitchen - only to be done to bathroom is replace vanity, wall light & gfci - new panel for unit 5. no structural; in-kind work.Details
unit 1: remodel kitchen - only to be done to replace bathroom vanity, wall lights, gfci & floor. no structural; in-kind work. unit 5: remodel kitchen - only to be done to bathroom is replace vanity, wall light & gfci - new panel for unit 5. no structural; in-kind work. | $24,000 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 151 Moffitt St | remodel kitchen. new cabinets & counter tops; upgrade outlets to code. new panel. all work in-kind. no structural.Details
remodel kitchen. new cabinets & counter tops; upgrade outlets to code. new panel. all work in-kind. no structural. | $12,000 |
| Apr 22, 2025 | Completed final sign-off Jul 2025 | 1551 Sacramento St | kitchen remodel: counter tops, all cabinets, sink, faucet, floor tiles in kind. no structural.Details
kitchen remodel: counter tops, all cabinets, sink, faucet, floor tiles in kind. no structural. | $36,123 |
| Feb 11, 2025 | Completed final sign-off May 2025 | 1715 33rd Av | filing for permits for kitchen done w/out permits. new owner purchased house and old owner remodeled kitchen w/ no permits. also new furnace inspector request.Details
filing for permits for kitchen done w/out permits. new owner purchased house and old owner remodeled kitchen w/ no permits. also new furnace inspector request. | $10,000 |
| Nov 4, 2024 | Completed final sign-off May 2025 | 1715 33rd Av | partial remodel to 2 bathroom. second floor and top master bathroom. exchange tub to shower pan master bathroom. no structural.Details
partial remodel to 2 bathroom. second floor and top master bathroom. exchange tub to shower pan master bathroom. no structural. | $16,000 |
| May 20, 2024 | Completed final sign-off Jul 2024 | 1688 Wallace Av | #302: convert tub / shower to shower, plumbing and new shower pan & tiles. no structural.Details
#302: convert tub / shower to shower, plumbing and new shower pan & tiles. no structural. | $5,000 |
| Mar 5, 2024 | In progress filed Mar 2024, not yet issued | 166 Bradford St | construction of new deck at rear 9'x20', remove (e) 8' wide windows install new sliding doors on (e) window openingsDetails
construction of new deck at rear 9'x20', remove (e) 8' wide windows install new sliding doors on (e) window openings | $18,000 |
| Dec 13, 2023 | Completed final sign-off Apr 2025 | 64 Fairfield Wy | remodel upstair 1 bathroom. no structuralDetails
remodel upstair 1 bathroom. no structural | $10,000 |
| Jul 18, 2023 | Completed final sign-off Dec 2024 | 1515 34th Av | partial kitchen remodel. upgrade cabinet and countertops in kind. no structural. no outside work, no moving walls.Details
partial kitchen remodel. upgrade cabinet and countertops in kind. no structural. no outside work, no moving walls. | $9,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 2488 San Bruno Av | filing for building permit requested by inspector for filing records of new installation of front door, mandatory disability access improvement program child care center, abe# 201807231711. no structural.Details
filing for building permit requested by inspector for filing records of new installation of front door, mandatory disability access improvement program child care center, abe# 201807231711. no structural. | |
| Nov 2, 2022 | Completed final sign-off Jun 2023 | 1633 Lyon St | remodel kitchen in kind. no structural.Details
remodel kitchen in kind. no structural. | $20,000 |
| Oct 3, 2022 | Completed final sign-off Jul 2023 | 436 Velasco Av | in kind downstairs bathroom remodel electrical and plumbing. no structural.Details
in kind downstairs bathroom remodel electrical and plumbing. no structural. | $10,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 98 Lakewood Av | remodel bathroom in-kind, prefabricated shower pan, new faucets and tiles. no structural.Details
remodel bathroom in-kind, prefabricated shower pan, new faucets and tiles. no structural. | $10,000 |
| Jan 5, 2021 | Completed final sign-off Jul 2021 | 416 Athens St | kitchen cabinets & sink. remodel r/r faucet floor tiles, wall tiles & countertop. upgrade outlet. new recess light. no structuralDetails
kitchen cabinets & sink. remodel r/r faucet floor tiles, wall tiles & countertop. upgrade outlet. new recess light. no structural | $15,000 |
| Nov 5, 2020 | Completed final sign-off Feb 2021 | 2488 San Bruno Av | remodel shower stall only, no structual.Details
remodel shower stall only, no structual. | $5,000 |
| Nov 5, 2020 | Never finaled issued Nov 2020, no final | 819 Cayuga Av | remove and replace 13 windows in same openings.jeld wen. no structual, like for like. 2 windows facing street.Details
remove and replace 13 windows in same openings.jeld wen. no structual, like for like. 2 windows facing street. | $5,000 |
| Sep 29, 2020 | Never finaled issued Sep 2020, no final | 2551 22nd Av | bathroom remodelDetails
bathroom remodel | $15,000 |
| Aug 12, 2020 | Completed final sign-off Mar 2021 | 2154 30th Av | remodel 1 bath & 1 kitchen in kind. new counter top, sink, faucet, tile floor, and new outlets.Details
remodel 1 bath & 1 kitchen in kind. new counter top, sink, faucet, tile floor, and new outlets. | $20,000 |
| Mar 5, 2020 | Completed final sign-off Aug 2020 | 2325 Ulloa St | investigate pest control report finding dryrot/termites repairs needed stucco removal 400 sq ft. not visible from street.Details
investigate pest control report finding dryrot/termites repairs needed stucco removal 400 sq ft. not visible from street. | $4,000 |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 2325 Ulloa St | remodel kitchen in kind. no structural work under this permit.Details
remodel kitchen in kind. no structural work under this permit. | $20,000 |
| Dec 19, 2019 | Completed final sign-off May 2020 | 55 Red Rock Wy | retiling shower stall in bathroom. new faucet & toilet replace fan. no structural. all work in kindDetails
retiling shower stall in bathroom. new faucet & toilet replace fan. no structural. all work in kind | $6,500 |
| Apr 9, 2019 | Completed final sign-off Dec 2019 | 1463 Hudson Av | remodel to one master bathroom, new shower, toilet, faucet, tiles, vanity fix some dryrot on wall & ceiling. no structuralDetails
remodel to one master bathroom, new shower, toilet, faucet, tiles, vanity fix some dryrot on wall & ceiling. no structural | $13,000 |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 542 Duncan St | to obtain final inspection for work approved under pa 2015-0316-0907. all work is completeDetails
to obtain final inspection for work approved under pa 2015-0316-0907. all work is complete | |
| Jun 27, 2018 | Completed final sign-off Apr 2019 | 524 15th Av | remodel kitchen & two bathrooms, upgrade some lights outlets - 12x12 kitchen first 8 x 7 bathroom, second bathroom 9x 11. replace in kind. no structural work.Details
remodel kitchen & two bathrooms, upgrade some lights outlets - 12x12 kitchen first 8 x 7 bathroom, second bathroom 9x 11. replace in kind. no structural work. | $35,000 |
| Apr 27, 2018 | Completed final sign-off Apr 2020 | 316 Juanita Wy | to comply with nov #201842114 & 201841841, alteration to (e) home, including removing walls, finishes, doors, replacing windows, in - kind, new plumbing, remodel the three floors and update the layout of the house, structural reinforcement, demolish stairs in basement & reframing,Details
to comply with nov #201842114 & 201841841, alteration to (e) home, including removing walls, finishes, doors, replacing windows, in - kind, new plumbing, remodel the three floors and update the layout of the house, structural reinforcement, demolish stairs in basement & reframing, | $150,000 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 316 Juanita Wy | remodel of kitchen, two bathroom & one half bath. new cabinets, sinks, faucet, appliance, tub/shower toilets. no structural.Details
remodel of kitchen, two bathroom & one half bath. new cabinets, sinks, faucet, appliance, tub/shower toilets. no structural. | $29,500 |
| Mar 20, 2017 | Completed final sign-off Aug 2017 | 600 Wawona St | remodel master bathroom and half bathDetails
remodel master bathroom and half bath | $15,000 |
| Sep 16, 2016 | Completed final sign-off Nov 2016 | 2710 Baker St | unit #4: revisioin to app#201609076905 to installing straps to joist & bolt to wall; repair in kind.Details
unit #4: revisioin to app#201609076905 to installing straps to joist & bolt to wall; repair in kind. | $2,500 |
| Sep 7, 2016 | Completed final sign-off Nov 2016 | 2710 Baker St | work in unit #4: to open several wals of parapet wall and balcony floor to investigate the reason the wall shakes. plans to be submitted once it has determine how is wall fasten and built on balconuy area 200 sq. ft. not visible from street.Details
work in unit #4: to open several wals of parapet wall and balcony floor to investigate the reason the wall shakes. plans to be submitted once it has determine how is wall fasten and built on balconuy area 200 sq. ft. not visible from street. | $500 |
| May 18, 2016 | Completed final sign-off Jul 2017 | 1328 Mission St | revision to app#201603232851. no more shower and bathroom work to be performed. fire under separate permit if required by inspectorDetails
revision to app#201603232851. no more shower and bathroom work to be performed. fire under separate permit if required by inspector | |
| Mar 23, 2016 | Completed final sign-off Jul 2017 | 1328 Mission St | unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet.Details
unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet. | $35,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2016 | 1328 Mission St | unit #6: the (e) building is 6 residential units on 2nd & 3rd flr & office space on 4th & 5th flrs. unit 6 remodel work includes adding closets @2nd flr,& loft lvl,upgrade lighting @ (e)dining/kitchen & new walk-in closet.Details
unit #6: the (e) building is 6 residential units on 2nd & 3rd flr & office space on 4th & 5th flrs. unit 6 remodel work includes adding closets @2nd flr,& loft lvl,upgrade lighting @ (e)dining/kitchen & new walk-in closet. | $8,000 |
| Mar 15, 2016 | Completed final sign-off Jul 2017 | 1908 09th Av | limited to bldg exterior alteration at west front elevation to repair siding and stair guard and hand rail. replace extg door with window. roofing at portch. replace extg light fixtures.Details
limited to bldg exterior alteration at west front elevation to repair siding and stair guard and hand rail. replace extg door with window. roofing at portch. replace extg light fixtures. | $25,000 |
| Feb 18, 2016 | Completed final sign-off Mar 2016 | 108 Palm Av | partial kitchen remodel. r/r counter tops & cabinets, new sink & faucets with appliances. relocated sub panel. no structural work.Details
partial kitchen remodel. r/r counter tops & cabinets, new sink & faucets with appliances. relocated sub panel. no structural work. | $8,500 |
| May 5, 2015 | Completed final sign-off Dec 2015 | 111 Morningside Dr | total remodel to two upstairs bathrooms - bath, shower pan, plumbing, fixtures, tiles work, subpanel. no structural.Details
total remodel to two upstairs bathrooms - bath, shower pan, plumbing, fixtures, tiles work, subpanel. no structural. | $20,000 |