Back to bathroom remodel contractors
Baytown Construction
- Based in
- Daly City
- On San Francisco permits
- May 2015 to Jun 2026
- Last 24 months
- 8 permits filed
38 permits since 2000: 32 completed, 2 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 14 completed, 1 in progress, 2 never finaled. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2026 | In progress issued Jun 2026 | 2139 Green St | unit c: remodeling of kitchen an master bathroom. no structure work.Details
unit c: remodeling of kitchen an master bathroom. no structure work. | $30,000 |
| Sep 3, 2025 | Completed final sign-off Dec 2025 | 1553 Sacramento St | tub and shower surround tiles and faucet. tile floor, new vanilty and lights and gfi outlets in bathroom. no structural work or total demo.Details
tub and shower surround tiles and faucet. tile floor, new vanilty and lights and gfi outlets in bathroom. no structural work or total demo. | $8,500 |
| Jun 23, 2025 | Completed final sign-off Sep 2025 | 1865 Sacramento St | unit 1: remodel kitchen - only to be done to replace bathroom vanity, wall lights, gfci & floor. no structural; in-kind work. unit 5: remodel kitchen - only to be done to bathroom is replace vanity, wall light & gfci - new panel for unit 5. no structural; in-kind work.Details
unit 1: remodel kitchen - only to be done to replace bathroom vanity, wall lights, gfci & floor. no structural; in-kind work. unit 5: remodel kitchen - only to be done to bathroom is replace vanity, wall light & gfci - new panel for unit 5. no structural; in-kind work. | $24,000 |
| Nov 4, 2024 | Completed final sign-off May 2025 | 1715 33rd Av | partial remodel to 2 bathroom. second floor and top master bathroom. exchange tub to shower pan master bathroom. no structural.Details
partial remodel to 2 bathroom. second floor and top master bathroom. exchange tub to shower pan master bathroom. no structural. | $16,000 |
| Dec 13, 2023 | Completed final sign-off Apr 2025 | 64 Fairfield Wy | remodel upstair 1 bathroom. no structuralDetails
remodel upstair 1 bathroom. no structural | $10,000 |
| Oct 3, 2022 | Completed final sign-off Jul 2023 | 436 Velasco Av | in kind downstairs bathroom remodel electrical and plumbing. no structural.Details
in kind downstairs bathroom remodel electrical and plumbing. no structural. | $10,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 98 Lakewood Av | remodel bathroom in-kind, prefabricated shower pan, new faucets and tiles. no structural.Details
remodel bathroom in-kind, prefabricated shower pan, new faucets and tiles. no structural. | $10,000 |
| Sep 29, 2020 | Never finaled issued Sep 2020, no final | 2551 22nd Av | bathroom remodelDetails
bathroom remodel | $15,000 |
| Aug 12, 2020 | Completed final sign-off Mar 2021 | 2154 30th Av | remodel 1 bath & 1 kitchen in kind. new counter top, sink, faucet, tile floor, and new outlets.Details
remodel 1 bath & 1 kitchen in kind. new counter top, sink, faucet, tile floor, and new outlets. | $20,000 |
| Dec 19, 2019 | Completed final sign-off May 2020 | 55 Red Rock Wy | retiling shower stall in bathroom. new faucet & toilet replace fan. no structural. all work in kindDetails
retiling shower stall in bathroom. new faucet & toilet replace fan. no structural. all work in kind | $6,500 |
| Apr 9, 2019 | Completed final sign-off Dec 2019 | 1463 Hudson Av | remodel to one master bathroom, new shower, toilet, faucet, tiles, vanity fix some dryrot on wall & ceiling. no structuralDetails
remodel to one master bathroom, new shower, toilet, faucet, tiles, vanity fix some dryrot on wall & ceiling. no structural | $13,000 |
| Jun 27, 2018 | Completed final sign-off Apr 2019 | 524 15th Av | remodel kitchen & two bathrooms, upgrade some lights outlets - 12x12 kitchen first 8 x 7 bathroom, second bathroom 9x 11. replace in kind. no structural work.Details
remodel kitchen & two bathrooms, upgrade some lights outlets - 12x12 kitchen first 8 x 7 bathroom, second bathroom 9x 11. replace in kind. no structural work. | $35,000 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 316 Juanita Wy | remodel of kitchen, two bathroom & one half bath. new cabinets, sinks, faucet, appliance, tub/shower toilets. no structural.Details
remodel of kitchen, two bathroom & one half bath. new cabinets, sinks, faucet, appliance, tub/shower toilets. no structural. | $29,500 |
| Mar 20, 2017 | Completed final sign-off Aug 2017 | 600 Wawona St | remodel master bathroom and half bathDetails
remodel master bathroom and half bath | $15,000 |
| May 18, 2016 | Completed final sign-off Jul 2017 | 1328 Mission St | revision to app#201603232851. no more shower and bathroom work to be performed. fire under separate permit if required by inspectorDetails
revision to app#201603232851. no more shower and bathroom work to be performed. fire under separate permit if required by inspector | |
| Mar 23, 2016 | Completed final sign-off Jul 2017 | 1328 Mission St | unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet.Details
unit #4: the (e)bldg is 6 residential units on 2nd &3rd flr, office spaces on 4th & 5th flr. unit 4 work includes remodel of the (e)kitchen, remodel the (e)bath to add a shower, add closets @ the 2nd flr & loft level, upgrade lighting @ dining/kitchen & new walk-in closet. | $35,000 |
| May 5, 2015 | Completed final sign-off Dec 2015 | 111 Morningside Dr | total remodel to two upstairs bathrooms - bath, shower pan, plumbing, fixtures, tiles work, subpanel. no structural.Details
total remodel to two upstairs bathrooms - bath, shower pan, plumbing, fixtures, tiles work, subpanel. no structural. | $20,000 |