18 permits since 2000 (contractor on 18 permits, authorized agent-others on 2 permits): 16 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2026 | Completed final sign-off Sep 2026 | 265 Winston Dr | Frans Construction Inc. | construct 2 non load bearing walls with glass door and metal frame top portition, total approx. 22 ln ft. install 1 electrical switch to control 2 xsiting ceiling lightsDetails
construct 2 non load bearing walls with glass door and metal frame top portition, total approx. 22 ln ft. install 1 electrical switch to control 2 xsiting ceiling lights | $10,000 |
| Dec 22, 2022 | Completed final sign-off Sep 2023 | 2500 Mission St | Frans Construction Inc. | to comply with abe ordinance 51-16. reconstructing sloped sidewalk to correct cross slope issues, replacing door hardware and installing new door operator actuator bar. the entire slope of work is solely to remove barriers. ref abe 202207082138Details
to comply with abe ordinance 51-16. reconstructing sloped sidewalk to correct cross slope issues, replacing door hardware and installing new door operator actuator bar. the entire slope of work is solely to remove barriers. ref abe 202207082138 | $40,000 |
| Nov 21, 2022 | Completed final sign-off Apr 2023 | 299 Valencia St | Frans Construction Inc. | to comply with abe program. reconstruction of door landing and adjustment of door hardware. ref abe 202206151446Details
to comply with abe program. reconstruction of door landing and adjustment of door hardware. ref abe 202206151446 | $15,000 |
| Oct 25, 2022 | Completed final sign-off Sep 2023 | 2323 Irving St | Frans Construction Inc. | to comply with abe, abe 202206281817. replace storefront with new to accommodate ada compliant entrance door and installing new automatic power door operator buttons on bar.Details
to comply with abe, abe 202206281817. replace storefront with new to accommodate ada compliant entrance door and installing new automatic power door operator buttons on bar. | $35,000 |
| Oct 24, 2022 | Completed final sign-off Mar 2023 | 2166 Chestnut St | Frans Construction Inc. | to comply with accessible business entrance program per ordinance 51-16 reconstruction of door hardware replacement for barrier removal abe# 202207071489Details
to comply with accessible business entrance program per ordinance 51-16 reconstruction of door hardware replacement for barrier removal abe# 202207071489 | $30,000 |
| Nov 4, 2021 | Completed final sign-off Dec 2021 | 2500 Mission St | Frans Construction Inc. | revision to pa 2021-1020-0840 change wall anchorage detailsDetails
revision to pa 2021-1020-0840 change wall anchorage details | |
| Oct 20, 2021 | Never finaled issued Oct 2021, no final | 2500 Mission St | Frans Construction Inc. | frame free standing wall move restroom toilet over 1/2 to meet adaDetails
frame free standing wall move restroom toilet over 1/2 to meet ada | $6,500 |
| Oct 1, 2021 | Never finaled issued Oct 2021, no final | 1201 Market St | Frans Construction Inc. | frame free standing wall to display. upgrade entry door opening force to 51lbs max.Details
frame free standing wall to display. upgrade entry door opening force to 51lbs max. | $6,500 |
| Apr 29, 2021 | Completed final sign-off Nov 2024 | 4669 Mission St | Frans Construction Inc. | to comply w/abe202010022970 to provide an accessible entrance to the existing chase bank branch. work to include replacement of sidewalk and installation of automatic door openers.Details
to comply w/abe202010022970 to provide an accessible entrance to the existing chase bank branch. work to include replacement of sidewalk and installation of automatic door openers. | $75,000 |
| Mar 1, 2019 | Completed final sign-off May 2019 | 1375 03rd St | Frans Construction Inc. | 1st fl: non-structural remodel of bank including furniture & cubical wall, low voltage electricl (monitors).Details
1st fl: non-structural remodel of bank including furniture & cubical wall, low voltage electricl (monitors). | $60,000 |
| Mar 1, 2019 | Completed final sign-off May 2019 | 401 Divisadero St | Frans Construction Inc. | 1st fl: interior remodel (ti) non-structural remove & replace furniture & cubical partitions, low voltage electrical (monitors).Details
1st fl: interior remodel (ti) non-structural remove & replace furniture & cubical partitions, low voltage electrical (monitors). | $91,000 |
| Aug 30, 2018 | Completed final sign-off Sep 2018 | 926 Taraval St | Frans Construction Inc. | revision to app#201802080811. eliminating ada counter work from previously aproved permitDetails
revision to app#201802080811. eliminating ada counter work from previously aproved permit | |
| Feb 8, 2018 | Completed final sign-off Sep 2018 | 926 Taraval St | Frans Construction Inc. | new inclined walkway with handrails, new door closers, new isa sign new isa sign at accessible counter, relocating pass thru and new br glass at accessible counterDetails
new inclined walkway with handrails, new door closers, new isa sign new isa sign at accessible counter, relocating pass thru and new br glass at accessible counter | $12,000 |
| Jan 4, 2016 | Completed final sign-off May 2016 | 2500 Mission St | Frans Construction Inc. | install new furniture, finishes, & equipment, install 2 new e-atm's in lobby, providing structural fastening of e-atm's, ceiling work, removing 3 pendent lights, replacing accoustical tiles, relocating one wall washer, relocate power and data for new equipment, extg hvac to remain as is.Details
install new furniture, finishes, & equipment, install 2 new e-atm's in lobby, providing structural fastening of e-atm's, ceiling work, removing 3 pendent lights, replacing accoustical tiles, relocating one wall washer, relocate power and data for new equipment, extg hvac to remain as is. | $45,222 |
| Sep 24, 2013 | Completed final sign-off Oct 2013 | 1600 Van Ness Av | Frans Construction Inc. | revise framing due to load bearing wall. original pa#201307121715-r1Details
revise framing due to load bearing wall. original pa#201307121715-r1 | $1,500 |
| Jul 12, 2013 | Completed final sign-off Oct 2013 | 1600 Van Ness Av | Frans Construction Inc. | ceiling:replace tiles and patch repair paint grid for like new. apperance lighting:replace bulbs,ballast and lenses for consistant . appearance:hvac clean disfusers, replace as needed verify system is working. finishes. all nw finishes within tnt spce per finish plan toilet, full restroom upgrade.Details
ceiling:replace tiles and patch repair paint grid for like new. apperance lighting:replace bulbs,ballast and lenses for consistant . appearance:hvac clean disfusers, replace as needed verify system is working. finishes. all nw finishes within tnt spce per finish plan toilet, full restroom upgrade. | $152,000 |
| Nov 20, 2012 | Completed final sign-off Mar 2013 | 1318 Stockton St | Frans Construction Inc. | new private office, patch & repair ceiling, new finishes & bank equipment.Details
new private office, patch & repair ceiling, new finishes & bank equipment. | $64,513 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 401 California St | Frans Construction Inc. | minor interior remodel of existing chase bank, new offices, ceiling & finishes.Details
minor interior remodel of existing chase bank, new offices, ceiling & finishes. | $135,239 |