Phil Tapia
- License
- 28551
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Randall Lamb
- On San Francisco permits
- Dec 2004 to Sep 2006
7 permits since 2000 (engineer on 6 permits, architect on 1 permit): 7 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (3)
- Architects
- Peter Shutts (2), Michelle Eaton, Randall Dowler
- Engineers
- Robert Boyd
- Lessees
- Doug Zucher/Steven Suzuki
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 7
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2006 | Completed final sign-off May 2007 | 1 Market St | Hathaway Dinwiddie Co. | oti-2, 39th floor, el, me.Details
oti-2, 39th floor, el, me. | $100,000 |
| May 30, 2006 | Completed final sign-off Feb 2007 | 55 04th St | remodel of 1,300 sq. ft. of (e) street level office space for retail use - a starbucks coffee shop, accessed from the hotel lobby. (e) ceilings, doors and partitions will be removed, & new ceilings, doors and partitonms added. neew casework & equipment will be installed.Details
remodel of 1,300 sq. ft. of (e) street level office space for retail use - a starbucks coffee shop, accessed from the hotel lobby. (e) ceilings, doors and partitions will be removed, & new ceilings, doors and partitonms added. neew casework & equipment will be installed. | $200,000 | |
| May 19, 2006 | Completed final sign-off Aug 2006 | 160 Sutter St | Hathaway Dinwiddie Co. | oti-1 g/f el, me, ls, sp construct partial height walls for t.i.Details
oti-1 g/f el, me, ls, sp construct partial height walls for t.i. | $65,000 |
| May 19, 2006 | Completed final sign-off Aug 2006 | 160 Sutter St | Hathaway Dinwiddie Co. | oti-2 ground floor, el, me.Details
oti-2 ground floor, el, me. | $30,000 |
| Sep 30, 2005 | Completed final sign-off Jan 2006 | 101 California St | oti-2 8th floor le, me, lsDetails
oti-2 8th floor le, me, ls | $50,200 | |
| Jan 18, 2005 | Completed final sign-off May 2005 | 185 Berry St | provide tenant improvemnt to suite #240/new partitions/doors,wndw,flr finishes for pharmacyDetails
provide tenant improvemnt to suite #240/new partitions/doors,wndw,flr finishes for pharmacy | $400,000 | |
| Dec 23, 2004 | Completed final sign-off Apr 2005 | 101 California St | oti-2, 17th floor, me, el.Details
oti-2, 17th floor, me, el. | $60,000 |