Randall De Voto
- Listed as
- architect
- Firm
- Csda Design Group
- Based in
- San Francisco
- On San Francisco permits
- Jan 2005 to Feb 2017
13 permits since 2000 (architect on 13 permits): 2 completed, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 2, 2017 | Expired or cancelled withdrawn Oct 2017 | 401 Church St | Southern Hemisphere Shades Inc | erection of fabric tensioned shade structural.Details
erection of fabric tensioned shade structural. | $24,575 |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 401 Church St | Ps2 Inc | revision to remove items from the scope of permitted work ref. permit 201603232869r1,201605238113: ceiling mounted projectors in classrooms, new lighting @ bulletin bd, and corridors, fire alarms.Details
revision to remove items from the scope of permitted work ref. permit 201603232869r1,201605238113: ceiling mounted projectors in classrooms, new lighting @ bulletin bd, and corridors, fire alarms. | |
| Aug 25, 2016 | Never finaled issued Aug 2016, no final | 401 Church St | Ps2 Inc | revision to toilet (staff) remodel due to actual dimension discrepancy. ref. permit 201605318715.Details
revision to toilet (staff) remodel due to actual dimension discrepancy. ref. permit 201605318715. | |
| May 31, 2016 | Never finaled issued Jun 2016, no final | 401 Church St | Ps2 Inc | existing academic building rooms 102a,102b,102c,103 & 208a: 102a accessible sink & casework; 102b & 1046 toilet accessibility upgrade;103 accessible copy rm door; 208a accessible sink & casework,roll up window shade; vinyl flooring,repl light fixtures,repaint interior walls & ceilings;accessblityDetails
existing academic building rooms 102a,102b,102c,103 & 208a: 102a accessible sink & casework; 102b & 1046 toilet accessibility upgrade;103 accessible copy rm door; 208a accessible sink & casework,roll up window shade; vinyl flooring,repl light fixtures,repaint interior walls & ceilings;accessblity | $150,000 |
| Jan 15, 2016 | Expired or cancelled cancelled Mar 2017 | 2177 Jerrold Av | Charles Pankow Builders Ltd | to erect 1 story, no basement, warehouse building. ** maher: n/a **Details
to erect 1 story, no basement, warehouse building. ** maher: n/a ** | $1,000,000 |
| Sep 24, 2014 | Never finaled issued Jul 2015, no final | 680 Filbert St | Nibbi Bros Assoc Inc. | revision to pa# 2013/04/15/4538. mep design for 1st, 2nd & mezzanine remodel along with 3rd floor mep design. architectural modifications to accommodate the mep design. aka 1836 powell street block 0089 lot 048-049.Details
revision to pa# 2013/04/15/4538. mep design for 1st, 2nd & mezzanine remodel along with 3rd floor mep design. architectural modifications to accommodate the mep design. aka 1836 powell street block 0089 lot 048-049. | |
| Jun 11, 2014 | Never finaled issued Jun 2014, no final | 680 Filbert St | Nibbi Bros Assoc Inc. | soft demolition and abatement of gym interior. construction permit 2013.0415.4538Details
soft demolition and abatement of gym interior. construction permit 2013.0415.4538 | $5,000 |
| Apr 15, 2013 | Never finaled issued Aug 2014, no final | 680 Filbert St | Nibbi Bros Assoc Inc. | remodel of 1st fl, mezz fl & 2nd fl; addition of 3rd fl, new elevator and structural. the mechanical, electrical & plumbing upgrades, (n) pg&e service & transformer, (n) fire sprinkler & fire water connection. (permit for fire sprinkler & fire water connection are to be submitted on separate permitsDetails
remodel of 1st fl, mezz fl & 2nd fl; addition of 3rd fl, new elevator and structural. the mechanical, electrical & plumbing upgrades, (n) pg&e service & transformer, (n) fire sprinkler & fire water connection. (permit for fire sprinkler & fire water connection are to be submitted on separate permits | $5,500,000 |
| Mar 2, 2007 | Expired or cancelled expired Mar 2009 | 2001 37th Av | Devcon Construction | new toilet and sink at (e) storage. change use from storage to team room. provide accessible shower in (e) shower. above changes to pa# 2005/11/23/8870, occupant load established. sprinkler & life safety under separate permit.Details
new toilet and sink at (e) storage. change use from storage to team room. provide accessible shower in (e) shower. above changes to pa# 2005/11/23/8870, occupant load established. sprinkler & life safety under separate permit. | $50,000 |
| Oct 26, 2006 | Never finaled issued Dec 2006, no final | 2001 37th Av | Devcon Construction | structural & civil changes to issued pa# 2005/11/23/8870. addendum 1 - structural & addendum 2 - architectural & civil due to (e) site conditions.Details
structural & civil changes to issued pa# 2005/11/23/8870. addendum 1 - structural & addendum 2 - architectural & civil due to (e) site conditions. | |
| Nov 23, 2005 | Completed final sign-off Sep 2007 | 2001 37th Av | horizontal addition to construct a new three level structure. the bldg will be located in northeast corner of athletic field area. replacing (e) outdoor batting cages. the bldg will include cheral room, classroom, batting cages, storage, weight room, snack bar, patio deck.Details
horizontal addition to construct a new three level structure. the bldg will be located in northeast corner of athletic field area. replacing (e) outdoor batting cages. the bldg will include cheral room, classroom, batting cages, storage, weight room, snack bar, patio deck. | $1,000,000 | |
| Aug 24, 2005 | Expired or cancelled cancelled Sep 2006 | 120 Montgomery St | Wcp Svcs, Dba: Venture Builders | commercial t.i. non structural t.i. giving back a portion of floor. re-do ceiling work.Details
commercial t.i. non structural t.i. giving back a portion of floor. re-do ceiling work. | $355,000 |
| Jan 27, 2005 | Completed final sign-off May 2008 | 2 Thomas More Wy | Nibbi Brothers Construction | (rear bldg) - erect a 2 stories of 1 school with gymnasium & classroom.Details
(rear bldg) - erect a 2 stories of 1 school with gymnasium & classroom. | $4,000,000 |