Tom Guan
- Listed as
- authorized agent-others, contractor
- Firm
- Shao Fat Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Oct 2026
72 permits since 2000 (contractor on 72 permits, authorized agent-others on 2 permits): 56 completed, 10 in progress, 5 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress issued Oct 2026 | 91 Inverness Dr | Shao Fat Construction Inc | open wall and replace the existing water supply pipes inside the wall and new circuit for washer and dryer at existing laundry room.Details
open wall and replace the existing water supply pipes inside the wall and new circuit for washer and dryer at existing laundry room. | $3,000 |
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 3405 Anza St | Shao Fat Construction Inc | rev 202602176043. full stair replacement, as-built, per bid request.Details
rev 202602176043. full stair replacement, as-built, per bid request. | $500 |
| Sep 17, 2026 | In progress issued Sep 2026 | 91 Inverness Dr | Shao Fat Construction Inc | to obtain final inspection for work approved under pa# 202508042197. all work is complete.Details
to obtain final inspection for work approved under pa# 202508042197. all work is complete. | |
| Aug 19, 2026 | In progress issued Aug 2026 | 2758 38th Av | Shao Fat Construction Inc | to comply w/nov#: 202659648 and 202659341. remodel 2nd flr bathroom. add partition at (e) living room to create (n) media room. replace plumbing, replace shower pan, replace tile around shower panDetails
to comply w/nov#: 202659648 and 202659341. remodel 2nd flr bathroom. add partition at (e) living room to create (n) media room. replace plumbing, replace shower pan, replace tile around shower pan | $10,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 2579 18th Av | Shao Fat Construction Inc | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment.Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). alteration of service equipment. | $12,000 |
| May 19, 2026 | In progress issued May 2026 | 672 47th Av | Shao Fat Construction Inc | top floor: remodel 2 bathrooms and kitchen in kind. upgrade electrical wires of the unit, and upgrade sub-panel.Details
top floor: remodel 2 bathrooms and kitchen in kind. upgrade electrical wires of the unit, and upgrade sub-panel. | $38,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 2111 Market St | Shao Fat Construction Inc | tenant improvement remodel (e) office to massage office w/ new therapy tooms, break room, restroom. mep under separate permit.Details
tenant improvement remodel (e) office to massage office w/ new therapy tooms, break room, restroom. mep under separate permit. | $50,000 |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 600 Missouri St | Shao Fat Construction Inc | unit a: remodel two existing bathrooms in-kind, replace vanities, bath tub, shower, toilets and gfci outlets in kindDetails
unit a: remodel two existing bathrooms in-kind, replace vanities, bath tub, shower, toilets and gfci outlets in kind | $20,000 |
| Nov 14, 2025 | Completed final sign-off Jan 2026 | 2064 Union St | Shao Fat Construction Inc | 2/f: change of use from (e) office to massage therapy office with new therapy rooms, fixtures, and finishes. mep deferred.Details
2/f: change of use from (e) office to massage therapy office with new therapy rooms, fixtures, and finishes. mep deferred. | $15,000 |
| Nov 4, 2025 | Completed final sign-off Jul 2026 | 3893 24th St | Shao Fat Construction Inc | ti remodel (e) retail space to (n) massage therapy rooms, reception, all gender restroom, fixtures, and finishes.Details
ti remodel (e) retail space to (n) massage therapy rooms, reception, all gender restroom, fixtures, and finishes. | $50,000 |
| Aug 5, 2025 | In progress issued Nov 2025 | 318 Divisadero St | Shao Fat Construction Inc | remodel e vacant tenant space to a spa. change from laundrymat to massage service space.Details
remodel e vacant tenant space to a spa. change from laundrymat to massage service space. | $180,000 |
| Aug 4, 2025 | In progress issued Aug 2025 | 91 Inverness Dr | Shao Fat Construction Inc | remodel two bathrooms and kitchen of (e) in-kind. install new hardie sidding at the back of the house. replace front window at the front insame size upgrade electrical panel to 200 amp.Details
remodel two bathrooms and kitchen of (e) in-kind. install new hardie sidding at the back of the house. replace front window at the front insame size upgrade electrical panel to 200 amp. | $40,000 |
| Jun 3, 2025 | In progress issued Jun 2025 | 231 Excelsior Av | Shao Fat Construction Inc | replace (3) windows at rear of building.Details
replace (3) windows at rear of building. | $1,500 |
| May 27, 2025 | Completed final sign-off Aug 2026 | 217 Virginia Av | Shao Fat Construction Inc | units 1-6 and adu - patch holes made in walls and ceiling made due to rewiring building.Details
units 1-6 and adu - patch holes made in walls and ceiling made due to rewiring building. | $1,500 |
| Apr 28, 2025 | Completed final sign-off May 2025 | 605 15th Av | Shao Fat Construction Inc | repair the exterior over hang wall stucco at 3rd floor inkind visible from the street.Details
repair the exterior over hang wall stucco at 3rd floor inkind visible from the street. | $2,000 |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 4141 18th St | Shao Fat Construction Inc | tenant improvement. remodel (e) retail to massage office w/ (n) therapy rooms, reception, fixtures and finishes.Details
tenant improvement. remodel (e) retail to massage office w/ (n) therapy rooms, reception, fixtures and finishes. | $50,000 |
| Apr 10, 2025 | Completed final sign-off Nov 2025 | 2414 42nd Av | Shao Fat Construction Inc | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment. | $18,000 |
| Mar 14, 2025 | Completed final sign-off Sep 2025 | 1955 Sutter St | Shao Fat Construction Inc | tenant improvement: remodel (e) office to massage w/ (n) therapy rooms, fixture & finishes.Details
tenant improvement: remodel (e) office to massage w/ (n) therapy rooms, fixture & finishes. | $50,000 |
| Feb 27, 2025 | Completed final sign-off May 2025 | 231 Oxford St | Shao Fat Construction Inc | to comply w/nov 202298456 to remove front window on ground/f. to remove range & hood on ground/f.Details
to comply w/nov 202298456 to remove front window on ground/f. to remove range & hood on ground/f. | $1,500 |
| Jan 31, 2025 | Expired or cancelled cancelled Jun 2025 | 2414 42nd Av | Shao Fat Construction Inc | in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl alteration of service equipment. need a "green tag" for electrical service equipment. | $11,000 |
| Aug 15, 2024 | Completed final sign-off Feb 2026 | 85 Beachmont Dr | Shao Fat Construction Inc | 1. relocate the stair to the rear 2. use the stair well to become bath room for master bed room at 2nd fl. at ground fl. becomes a foyer. 3.sub-divided one bedroom to two w/ closet to make total of 3 bedroom on 2nd floor. 4.voluntary seismic strengthening on ground fl. 5. 2nd fl horizontal expandDetails
1. relocate the stair to the rear 2. use the stair well to become bath room for master bed room at 2nd fl. at ground fl. becomes a foyer. 3.sub-divided one bedroom to two w/ closet to make total of 3 bedroom on 2nd floor. 4.voluntary seismic strengthening on ground fl. 5. 2nd fl horizontal expand | $60,000 |
| Apr 19, 2024 | Completed final sign-off Jul 2024 | 946 Stockton St | Shao Fat Construction Inc | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $5,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2024 | 1264 Valencia St | Shao Fat Construction Inc | to comply with accessible business entrance ord 51-16. new door with automatic operator and reslope interior ramp. ref abe 202209094083Details
to comply with accessible business entrance ord 51-16. new door with automatic operator and reslope interior ramp. ref abe 202209094083 | $8,000 |
| Mar 3, 2023 | Never finaled issued Aug 2023, no final | 6304 Geary Bl | Shao Fat Construction Inc | to comply with nov # 202297048, interior remodel including new partition for massage rooms entry upgrade to be ascssible, new plumbing and electricalDetails
to comply with nov # 202297048, interior remodel including new partition for massage rooms entry upgrade to be ascssible, new plumbing and electrical | $80,000 |
| Feb 28, 2023 | Completed final sign-off Jun 2023 | 77 Dorado Tr | Shao Fat Construction Inc | one: remodel kitchen and 2 baths in kindDetails
one: remodel kitchen and 2 baths in kind | $20,000 |
| Feb 21, 2023 | Completed final sign-off Oct 2023 | 500 41st Av | Shao Fat Construction Inc | revision to pa#202205194616: replace partial extg 1st floor concrete slab in kind.Details
revision to pa#202205194616: replace partial extg 1st floor concrete slab in kind. | $5,000 |
| Jan 10, 2023 | Never finaled issued Apr 2023, no final | 422 Geary St | Shao Fat Construction Inc | merge (e) basement restaurant (422a geary st0 with street restaurant (422 geary st), both floors provided same kind of servicesDetails
merge (e) basement restaurant (422a geary st0 with street restaurant (422 geary st), both floors provided same kind of services | $5,000 |
| Sep 27, 2022 | Completed final sign-off Oct 2022 | 2343 Market St | Shao Fat Construction Inc | exterior vinyl sign over (e) awning "wela thai massage and spa"Details
exterior vinyl sign over (e) awning "wela thai massage and spa" | $1,500 |
| Jul 20, 2022 | Completed final sign-off Aug 2022 | 1268 12th Av | Shao Fat Construction Inc | remodel existing kitchen in same layout to comply with #202292815Details
remodel existing kitchen in same layout to comply with #202292815 | $6,000 |
| May 19, 2022 | Completed final sign-off Oct 2023 | 500 41st Av | Shao Fat Construction Inc | 1/f: convert (e) rooms space to one new dwelling unit (500a) within (e) bldg footprint. new unit include bedroom, bathroom, home office and kitchen.Details
1/f: convert (e) rooms space to one new dwelling unit (500a) within (e) bldg footprint. new unit include bedroom, bathroom, home office and kitchen. | $60,000 |
| Apr 8, 2022 | Completed final sign-off Oct 2022 | 2343 Market St | Shao Fat Construction Inc | revision to approved permit 202110120303. remodel (e) tenant space from beauty salon to massage therapy office.Details
revision to approved permit 202110120303. remodel (e) tenant space from beauty salon to massage therapy office. | $1,000 |
| Mar 23, 2022 | Completed final sign-off Aug 2022 | 2401 Mission St | Shao Fat Construction Inc | add accessible single accomodation toilet to laundry mat. laundry mat and cafe were built in 2016 under one permit 201608054351. laundry mat relinquested the cafe space. laundry mat will no longer have access to existing toilets located in cafe spaceDetails
add accessible single accomodation toilet to laundry mat. laundry mat and cafe were built in 2016 under one permit 201608054351. laundry mat relinquested the cafe space. laundry mat will no longer have access to existing toilets located in cafe space | $30,000 |
| Feb 17, 2022 | Completed final sign-off Feb 2024 | 939 Dartmouth St | Shao Fat Construction Inc | at 1st floor, new home office with wet bar, new deck and remodel existing bedroom and bathroom. at 2nd floor remodel existing bathroom and kitchen, remove wall between kitchen and dining roomDetails
at 1st floor, new home office with wet bar, new deck and remodel existing bedroom and bathroom. at 2nd floor remodel existing bathroom and kitchen, remove wall between kitchen and dining room | $95,000 |
| Feb 17, 2022 | Completed final sign-off Feb 2022 | 371 Moscow St | Shao Fat Construction Inc | replace the water damaged wall panels and cap off 3 unwanted outlets and cap off the water pipes and drain pipe of extg launddry room.Details
replace the water damaged wall panels and cap off 3 unwanted outlets and cap off the water pipes and drain pipe of extg launddry room. | $1,500 |
| Feb 1, 2022 | Completed final sign-off Mar 2022 | 2460 Mission St | Shao Fat Construction Inc | suite 2462: change of use from 2 sole pratitioners to general massage pratitioners. no tenant improvement.Details
suite 2462: change of use from 2 sole pratitioners to general massage pratitioners. no tenant improvement. | $3,000 |
| Dec 27, 2021 | Completed final sign-off Dec 2022 | 1328 25th Av | Shao Fat Construction Inc | remodel kitchen with new cabinets & update electrical panel. no structural work,no walls will be removed.Details
remodel kitchen with new cabinets & update electrical panel. no structural work,no walls will be removed. | $5,000 |
| Dec 23, 2021 | Completed final sign-off Sep 2023 | 1374 26th Av | Shao Fat Construction Inc | 2nd fl: removel (e) bathroom & kitchen. replace rear & side windows. 1st fl: remodel (e) space for new bathroom, 2 (n) bedrooms, media rm, wetbar & laundry. front exterior work under separate permit.Details
2nd fl: removel (e) bathroom & kitchen. replace rear & side windows. 1st fl: remodel (e) space for new bathroom, 2 (n) bedrooms, media rm, wetbar & laundry. front exterior work under separate permit. | $85,000 |
| Dec 17, 2021 | Completed final sign-off Mar 2022 | 41 Tioga Av | Shao Fat Construction Inc | 2nd floor remodel and enlarge (e) bathroom; remove door between living to hall; remove stone veneez wall finish @ (e) exterior front facade w/ stucco finish .Details
2nd floor remodel and enlarge (e) bathroom; remove door between living to hall; remove stone veneez wall finish @ (e) exterior front facade w/ stucco finish . | $18,000 |
| Oct 12, 2021 | Completed final sign-off Oct 2022 | 2343 Market St | Shao Fat Construction Inc | remodel (e) tenant space from beauty salon to beauty salon. no change of use, work included new reception, new beauty treatment room, ada restroom & shower and break rooms.Details
remodel (e) tenant space from beauty salon to beauty salon. no change of use, work included new reception, new beauty treatment room, ada restroom & shower and break rooms. | $50,000 |
| Sep 24, 2021 | Completed final sign-off Nov 2021 | 275 Talbert St | Shao Fat Construction Inc | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $12,000 |
| Aug 12, 2021 | Completed final sign-off Aug 2022 | 840 Holloway Av | Shao Fat Construction Inc | remodel extg tenant space from hair salon to facial beauty skin care spa, work inlcludes facial rooms, laundry room, remodel & upgrade extg all gender restroom, shower room and install new equipments and fixtures.Details
remodel extg tenant space from hair salon to facial beauty skin care spa, work inlcludes facial rooms, laundry room, remodel & upgrade extg all gender restroom, shower room and install new equipments and fixtures. | $65,000 |
| Jul 23, 2021 | Completed final sign-off Nov 2021 | 101 Holloway Av | Shao Fat Construction Inc | unit 101: remodel bathroom at upstairs and downstairs. unit 103: bathroom in kind. total of two bathroom. non structural.Details
unit 101: remodel bathroom at upstairs and downstairs. unit 103: bathroom in kind. total of two bathroom. non structural. | $10,000 |
| Apr 21, 2021 | Completed final sign-off Dec 2021 | 20 Del Monte St | Shao Fat Construction Inc | no fire damange report. to comply with 202175036: reair the roof about 100sf and replace 4 windows not street facing in-kind. patch walls and ceilings.Details
no fire damange report. to comply with 202175036: reair the roof about 100sf and replace 4 windows not street facing in-kind. patch walls and ceilings. | $5,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 1266 12th Av | Shao Fat Construction Inc | remodel kitchen in-kind: new cbinets, sink, counter top, faucet, flooring, new lights.Details
remodel kitchen in-kind: new cbinets, sink, counter top, faucet, flooring, new lights. | $8,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2021 | 1452 15th Av | Shao Fat Construction Inc | revision to app#202010166660. remove/replace walls and doors that damaged by car accident in kind. comply to nov#202056211Details
revision to app#202010166660. remove/replace walls and doors that damaged by car accident in kind. comply to nov#202056211 | $1,000 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 12 Madrone Av | Shao Fat Construction Inc | 1st fl construct new bathroom, new home office & new media room. new light fixtures and outlets.Details
1st fl construct new bathroom, new home office & new media room. new light fixtures and outlets. | $55,000 |
| Jan 15, 2021 | Never finaled filed Jan 2021, never issued | 642 Girard St | Shao Fat Construction Inc | turn existing space into living space. (n) game room, remodel (e) bathroom, (n) bedroom and (n) enclosure around (e) water heater & furnaceDetails
turn existing space into living space. (n) game room, remodel (e) bathroom, (n) bedroom and (n) enclosure around (e) water heater & furnace | $30,000 |
| Dec 15, 2020 | Completed final sign-off May 2021 | 2501 46th Av | Shao Fat Construction Inc | 1st fl: construct new family, a new bathroom, a new family room wih a new furnace, a water heater and a new laundry.Details
1st fl: construct new family, a new bathroom, a new family room wih a new furnace, a water heater and a new laundry. | $50,000 |
| Nov 6, 2020 | Completed final sign-off Jan 2021 | 714 Vienna St | Shao Fat Construction Inc | at 2nd floor, add new toilet room and expand existing closet.Details
at 2nd floor, add new toilet room and expand existing closet. | $7,000 |
| Nov 5, 2020 | Completed final sign-off Nov 2020 | 170 Topeka Av | Shao Fat Construction Inc | remodel (e) kitchen in-kind about 100 sqft.Details
remodel (e) kitchen in-kind about 100 sqft. | $8,000 |
| Aug 27, 2020 | Completed final sign-off Dec 2020 | 851 Baker St | Shao Fat Construction Inc | remodel kitchen and bathroom in-kindDetails
remodel kitchen and bathroom in-kind | $7,000 |
| Jul 30, 2020 | Completed final sign-off Sep 2020 | 2501 46th Av | Shao Fat Construction Inc | remodel kitchen 8x10 and 1 bathroom 5x6, in-kindDetails
remodel kitchen 8x10 and 1 bathroom 5x6, in-kind | $15,000 |
| Jul 16, 2020 | Completed final sign-off Aug 2020 | 1415 Eucalyptus Dr | Shao Fat Construction Inc | redo the existing exterior stucco walls in kind of 3300 sqfts in kind. on all 4 exterior walls.Details
redo the existing exterior stucco walls in kind of 3300 sqfts in kind. on all 4 exterior walls. | $20,000 |
| Jul 15, 2020 | Completed final sign-off Sep 2020 | 1769 Folsom St | Shao Fat Construction Inc | to comply with compliant #202042721. repair frontage of the store damaged by the crash. replace security door, glass door, 10' x 8' flooring, damaged store front siding and interior drywall. siding 2' x 8' vertical , 2' x 10' horizontal. all work in kind.Details
to comply with compliant #202042721. repair frontage of the store damaged by the crash. replace security door, glass door, 10' x 8' flooring, damaged store front siding and interior drywall. siding 2' x 8' vertical , 2' x 10' horizontal. all work in kind. | $6,450 |
| Jun 4, 2020 | Completed final sign-off Oct 2020 | 12 Victoria St | Shao Fat Construction Inc | first floor: construct 2 new bedrooms, 1 new bathroom, 1 media room.Details
first floor: construct 2 new bedrooms, 1 new bathroom, 1 media room. | $50,000 |
| Mar 12, 2020 | Completed final sign-off Feb 2021 | 1640 Cayuga Av | Almavana Construction, Shao Fat Construction Inc | 1st floor: remodel extg laundry area, add new bedroom, new home office and 2 new bathrooms.Details
1st floor: remodel extg laundry area, add new bedroom, new home office and 2 new bathrooms. | $70,000 |
| Mar 10, 2020 | Completed final sign-off Jun 2020 | 1983 21st Av | Shao Fat Construction Inc | comply with nov 201908451 202012652, 1st fl entry, construct exterior partition wall w entry doorDetails
comply with nov 201908451 202012652, 1st fl entry, construct exterior partition wall w entry door | $2,000 |
| Feb 27, 2020 | Completed final sign-off Mar 2020 | 38 Teddy Av | Shao Fat Construction Inc | replace water heater at same location and replace platform with plywood and replace extg gfciDetails
replace water heater at same location and replace platform with plywood and replace extg gfci | $600 |
| Feb 18, 2020 | Completed final sign-off May 2020 | 2414 42nd Av | Shao Fat Construction Inc | replace about 200 sq ft cracked stucco at front of house in-kind (above garage).Details
replace about 200 sq ft cracked stucco at front of house in-kind (above garage). | $5,000 |
| Dec 30, 2019 | Completed final sign-off Aug 2020 | 2619 44th Av | Shao Fat Construction Inc | at second floor, modify existing bathroom and closet into two full bathroomsDetails
at second floor, modify existing bathroom and closet into two full bathrooms | $32,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2021 | 2275 Market St | Shao Fat Construction Inc | change of use from tattoo shop to massage parlor.Details
change of use from tattoo shop to massage parlor. | |
| Nov 1, 2019 | Completed final sign-off Aug 2020 | 1640 Cayuga Av | Shao Fat Construction Inc | revision to pa 2019-0611-3132 convert bedroom to bathroomDetails
revision to pa 2019-0611-3132 convert bedroom to bathroom | $8,000 |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 38 Teddy Av | Shao Fat Construction Inc, Galaxy Building Construction | revise pa# 2019-0927-2990: to comply with nbov# 201979741, 201991611, add smoke detector, fix space heater within unit.Details
revise pa# 2019-0927-2990: to comply with nbov# 201979741, 201991611, add smoke detector, fix space heater within unit. | $2,000 |
| Sep 6, 2019 | Completed final sign-off Nov 2019 | 1907 28th Av | Shao Fat Construction Inc | remodel kitchen & upper bathroom in-kind, lower bathroom replace shower only.Details
remodel kitchen & upper bathroom in-kind, lower bathroom replace shower only. | $18,000 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 1117 Stockton St | Shao Fat Construction Inc | repair electrical upgrades with title 24. reference pa #201906203936Details
repair electrical upgrades with title 24. reference pa #201906203936 | $8,000 |
| Jul 25, 2019 | Completed final sign-off Oct 2019 | 908 Junipero Serra Bl | Shao Fat Construction Inc | remodel kitchen in kind and upgrade the main electrical panel to 100 amps. 230 sqfts for kitchen remodel.Details
remodel kitchen in kind and upgrade the main electrical panel to 100 amps. 230 sqfts for kitchen remodel. | $8,000 |
| Jun 4, 2019 | Completed final sign-off Aug 2020 | 422 Geary St | Shao Fat Construction Inc | revision to app#201801098145 and 201804136297. remove extg fixture at exit corridor, and restore egress corridor for tenants.Details
revision to app#201801098145 and 201804136297. remove extg fixture at exit corridor, and restore egress corridor for tenants. | $100 |
| May 28, 2019 | Completed final sign-off Feb 2020 | 1674 35th Av | Shao Fat Construction Inc | to address nov 201843791. remodel basement bathroom. replace tile shower pan, vanity, toilet, tiles in-kind.Details
to address nov 201843791. remodel basement bathroom. replace tile shower pan, vanity, toilet, tiles in-kind. | $5,000 |
| May 16, 2019 | Completed final sign-off Feb 2020 | 1674 35th Av | Shao Fat Construction Inc | comply w/ n.o.v 201843791. remodel basement & bathroom at basement w/ same layout. demo wall at playroom hallway. demo counter sink at playroom. demo door at storage, construct (n) wall at storage.Details
comply w/ n.o.v 201843791. remodel basement & bathroom at basement w/ same layout. demo wall at playroom hallway. demo counter sink at playroom. demo door at storage, construct (n) wall at storage. | $7,000 |
| Feb 25, 2019 | Never finaled issued Mar 2019, no final | 1300 Fillmore St | Shao Fat Construction Inc | to build a fence, 6ft vacant lotDetails
to build a fence, 6ft vacant lot | $2,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2015 | 1350 16th Av | Shao Fat Construction Inc | comply with nov 201564511, repair (5) deteriorated wood egress stair in kindDetails
comply with nov 201564511, repair (5) deteriorated wood egress stair in kind | $3,800 |
| Jun 18, 2015 | Completed final sign-off Jun 2015 | 432 Geary St | Shao Fat Construction Inc | revision to previous pa# 201505156420. change in bedroom door location in manager's suit.Details
revision to previous pa# 201505156420. change in bedroom door location in manager's suit. |