Paul Nash
- Listed as
- contractor, subcontractor
- Firm
- Nash's Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Aug 2025
18 permits since 2000 (contractor on 17 permits, subcontractor on 1 permit): 17 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 13, 2025 | In progress issued May 2026 | 1516 Shrader St | Andrew Gallagher Construction | renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom.Details
renovation to (e) ground floor & increase in habitable space which includes an art studio, bedroom & bathroom. demo (e) 95 sf wood deck. rebuild new 68 sf deck. remodel of primary bathroom & addition of bay window at primary bedroom. | $135,000 |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 280 Circular Av | Nash's Construction | repair dry rot, 240 sq ft. no change of walls. not visable from street.Details
repair dry rot, 240 sq ft. no change of walls. not visable from street. | $49,750 |
| Jun 22, 2015 | Completed final sign-off Jan 2016 | 118 Bache St | Nash's Construction | replacement of 50 lineal feet of foundation on the west and south sides of the extg 2 story singel family residence.Details
replacement of 50 lineal feet of foundation on the west and south sides of the extg 2 story singel family residence. | $18,200 |
| Mar 20, 2014 | Completed final sign-off Apr 2014 | 1680 Fulton St | Nash's Construction | to comply with report of physical inspection, app cc #7491Details
to comply with report of physical inspection, app cc #7491 | $1,000 |
| Mar 14, 2014 | Completed final sign-off May 2014 | 1259 Guerrero St | Nash's Construction | to comply withphysical inspector report #cc-7447. 3-r report.Details
to comply withphysical inspector report #cc-7447. 3-r report. | |
| Mar 14, 2014 | Completed final sign-off May 2014 | 1263 Guerrero St | Nash's Construction | to comply withphysical inspector report #cc-7674. 3-r report.Details
to comply withphysical inspector report #cc-7674. 3-r report. | |
| Dec 19, 2013 | Completed final sign-off Apr 2014 | 1620 Fulton St | Nash's Construction | interior residential remodel. move kitchen create storage.Details
interior residential remodel. move kitchen create storage. | $25,000 |
| Dec 10, 2013 | Completed final sign-off Dec 2013 | 1530 Hayes St | Nash's Construction | demo existing metal and tile exterior staircase. replace with wood framed victorian type stairs. same width & length.Details
demo existing metal and tile exterior staircase. replace with wood framed victorian type stairs. same width & length. | $2,500 |
| Dec 6, 2013 | Completed final sign-off Dec 2013 | 1620 Fulton St | Nash's Construction | to comply with physical inspection report #cc-7404 dated 11/4/13Details
to comply with physical inspection report #cc-7404 dated 11/4/13 | $1,000 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 84 Lippard Av | Nash's Construction | upgrade (e) interior stair less than 50% replace in kind ref. approved building permit app# 201307031089, finish with pre engineered wood flooring.Details
upgrade (e) interior stair less than 50% replace in kind ref. approved building permit app# 201307031089, finish with pre engineered wood flooring. | $1,000 |
| Sep 18, 2013 | Completed final sign-off Oct 2013 | 1620 Fulton St | Nash's Construction | replace wood windows inserts with wood inserts, u factor .40 maxDetails
replace wood windows inserts with wood inserts, u factor .40 max | $1,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 84 Lippard Av | Nash's Construction | phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slabDetails
phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slab | $72,000 |
| Mar 14, 2013 | Completed final sign-off Apr 2013 | 562 Columbus Av | Nash's Construction | address correction from 556 columbus to 562 columbus, ref. to pa#201301258821Details
address correction from 556 columbus to 562 columbus, ref. to pa#201301258821 | |
| Jan 25, 2013 | Completed final sign-off Apr 2013 | 556 Columbus Av | Nash's Construction | upgrade fixtures in existing bathroom wihtout moving location, install new tile, kitchen work - hang cabinets, sheetrock & tile.Details
upgrade fixtures in existing bathroom wihtout moving location, install new tile, kitchen work - hang cabinets, sheetrock & tile. | $2,000 |
| May 22, 2012 | Completed final sign-off Jul 2012 | 301 Coleridge St | Nash's Construction | bthroom and kitchen remodel: replacing fixtures and cabinetry in kind, new floors, updated to code wiring, repair walls & tiles in bathroom, new vanity, shower, toilet, new bathroom light/vent. no structural work. no change on walls and openings.Details
bthroom and kitchen remodel: replacing fixtures and cabinetry in kind, new floors, updated to code wiring, repair walls & tiles in bathroom, new vanity, shower, toilet, new bathroom light/vent. no structural work. no change on walls and openings. | $15,900 |
| Mar 8, 2012 | Completed final sign-off Apr 2012 | 615 Randolph St | Nash's Construction | refinish bathroom @ 2nd floor - replace tub w/shower , one new lighting, waterproof light in shower, no structural work.Details
refinish bathroom @ 2nd floor - replace tub w/shower , one new lighting, waterproof light in shower, no structural work. | $6,500 |
| Oct 20, 2011 | Completed final sign-off Dec 2011 | 1012 Shrader St | Nash's Construction | revision to pa# 201109194930 to correct substandard roof/ceiling and floor framing conditions discovered during renovation project.Details
revision to pa# 201109194930 to correct substandard roof/ceiling and floor framing conditions discovered during renovation project. | $1,500 |
| Sep 19, 2011 | Completed final sign-off Dec 2011 | 1012 Shrader St | Nash's Construction | remodel extg 2nd floor kitchen, powder room and family room. remodel extg 3rd floor rear bedroom area into master suite with bedroom, bathroom, closet and study. replace exg windows and doors at rear with new.Details
remodel extg 2nd floor kitchen, powder room and family room. remodel extg 3rd floor rear bedroom area into master suite with bedroom, bathroom, closet and study. replace exg windows and doors at rear with new. | $45,000 |