Block 6738, lot 006
84 Lippard Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,845 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 20, 2025 | Completed final sign-off Dec 2025 | 84 Lippard Av | Rua Woods Construction Inc | 3-ply stucco application to front, side, and rear of building (3 sides).Details
3-ply stucco application to front, side, and rear of building (3 sides). | $12,000 |
| Jul 26, 2024 | Completed final sign-off Aug 2024 | 84 Lippard Av | Tom Lee Roofing Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 84 Lippard Av | street spaceDetails
street space | ||
| Apr 24, 2019 | Never finaled issued Apr 2019, no final | 84 Lippard Av | street spaceDetails
street space | ||
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 84 Lippard Av | Nash's Construction | upgrade (e) interior stair less than 50% replace in kind ref. approved building permit app# 201307031089, finish with pre engineered wood flooring.Details
upgrade (e) interior stair less than 50% replace in kind ref. approved building permit app# 201307031089, finish with pre engineered wood flooring. | $1,000 |
| Jul 3, 2013 | Completed final sign-off Dec 2013 | 84 Lippard Av | Nash's Construction | phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slabDetails
phase 1: install hydronic heat, remodel bedroom, study, and master bath, new patio door in e ground floor location. insulate. phase 2: remodel kitchen and guest bath at 2nd floor. voluntary shoring. pour new slab | $72,000 |
| Feb 10, 2009 | Never finaled issued Feb 2009, no final | 84 Lippard Av | sidewalk repair.Details
sidewalk repair. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nash's Construction (2), Rua Woods Construction Inc, Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.