Casper Mork-Ulnes
- Listed as
- architect, authorized agent-others, designer, lessee
- Firm
- Mork Ulnes Architects
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Sep 2026
56 permits since 2000 (architect on 53 permits, designer on 2 permits, authorized agent-others on 1 permit, lessee on 1 permit): 31 completed, 6 in progress, 9 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 559 Pacific Av | 2nd fl - construction of small commercial kitchen, includes millwork, mep and equipmentDetails
2nd fl - construction of small commercial kitchen, includes millwork, mep and equipment | $400,000 | |
| Jul 15, 2026 | In progress issued Aug 2026 | 559 Pacific Av | Plant Construction Co, Lp | all work in 559 pacifc ave: new interior partitions, new interior finishes, new electrical, minor structural work.Details
all work in 559 pacifc ave: new interior partitions, new interior finishes, new electrical, minor structural work. | $1,996,842 |
| Jun 26, 2026 | In progress issued Jul 2026 | 557 Pacific Av | Plant Construction Co, Lp | interior soft demo for unit 559 pacific ave. to include core and shell upgrades to restroom fixtures replaced in kind.Details
interior soft demo for unit 559 pacific ave. to include core and shell upgrades to restroom fixtures replaced in kind. | $82,071 |
| Apr 29, 2026 | In progress issued Jun 2026 | 739 10th Av | K & R Builders Inc | remodel of (e) primary bedroom to include new primary bathroom. remodel of (e) hallway, bedroom #1 and bedroom #2 to include new full-height closets. remodel of (e) 1/f storage to include new full-height closets. removal of (e) interior walls, partitions and doors at 1/f, 3/f. new interior finishes.Details
remodel of (e) primary bedroom to include new primary bathroom. remodel of (e) hallway, bedroom #1 and bedroom #2 to include new full-height closets. remodel of (e) 1/f storage to include new full-height closets. removal of (e) interior walls, partitions and doors at 1/f, 3/f. new interior finishes. | $30,000 |
| Nov 26, 2025 | In progress issued Nov 2025 | 2018 23rd St | Frederic Grasset Design-Build | removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door,Details
removal of non-structural partitions @ stororage @ , repair of exterior stair, remodel of existing bathroom, removal of finishes on non-structural interior partitions per plan, new washer and dryer, new countertop in kitchen, new dish washer, kitchen window to be replaced in kind, new exterior door, | $50,000 |
| Oct 2, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | 7 Hills Construction | revision to pa # 2025-0917-5490 clarify framing around kitchen skylightDetails
revision to pa # 2025-0917-5490 clarify framing around kitchen skylight | |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 550 09th Av | 7 Hills Construction | remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paintDetails
remodel of (e) powder room in kind. (n) kitchen countertops. removal of non structural interior partitions at kitchen. removal of non structural entry closets, removal of door at dining. (n) full height closet at hall. (n) interior paint | $10,000 |
| Aug 1, 2025 | In progress issued Sep 2025 | 42 Clipper St | Devlin/Mcnally Construction | revision to 201912190060 and 2022-1025-5153- omit roof deck , stair to roof exterior balconies at level 3. revised enegery calculations. layout and glazing changes throughout.Details
revision to 201912190060 and 2022-1025-5153- omit roof deck , stair to roof exterior balconies at level 3. revised enegery calculations. layout and glazing changes throughout. | |
| Apr 3, 2024 | Expired or cancelled expired Apr 2026 | 1819 20th St | Nima Construction | exterior renovation of rear structure (1819 20th st) removal/ replace of exterior stucco in kind. new roof parapet of 18". replace entry door in kind. patch & repair exterior (e) stair treadsDetails
exterior renovation of rear structure (1819 20th st) removal/ replace of exterior stucco in kind. new roof parapet of 18". replace entry door in kind. patch & repair exterior (e) stair treads | $20,000 |
| Oct 26, 2023 | Completed final sign-off Sep 2025 | 473 Day St | Eco Logic Construction & Design Inc. | foundation replacement and interior remodel. no expansion of bldg envelop or work in prow. remodel 1/f include media room, new bathroom, storage space, conversion of tradesman hallway to 1-hr fire rated corridor. remodel 2/f kitchen. new electrical throughout. exterior scope include new windowsDetails
foundation replacement and interior remodel. no expansion of bldg envelop or work in prow. remodel 1/f include media room, new bathroom, storage space, conversion of tradesman hallway to 1-hr fire rated corridor. remodel 2/f kitchen. new electrical throughout. exterior scope include new windows | $400,000 |
| Jul 6, 2023 | Completed final sign-off Aug 2025 | 673 04th Av | conversion of (e) attic to habitable space, addition of 2 8x8ft dormers at roof, to include hallway, living room, closet, bedroom, bathroom, new stair and guareails for attic access. 1 new eero at new rear facing bedroom,(n) skylights at attices, (n) f/s at rear of attic additional only- defferedDetails
conversion of (e) attic to habitable space, addition of 2 8x8ft dormers at roof, to include hallway, living room, closet, bedroom, bathroom, new stair and guareails for attic access. 1 new eero at new rear facing bedroom,(n) skylights at attices, (n) f/s at rear of attic additional only- deffered | $200,000 | |
| May 3, 2023 | Completed final sign-off Feb 2024 | 1045 Sansome St | Nima Construction | construction of 2 non load bearing partitions. demolition of e light fixtures, new light fixtures, installation of kitchenette with sink and dishwasherDetails
construction of 2 non load bearing partitions. demolition of e light fixtures, new light fixtures, installation of kitchenette with sink and dishwasher | $15,000 |
| Nov 18, 2022 | Completed final sign-off Jun 2024 | 671 04th Av | structural revision to pa 2021-0208-4212 updates to sheets s2.0, s2.1 and s3.0. no other changesDetails
structural revision to pa 2021-0208-4212 updates to sheets s2.0, s2.1 and s3.0. no other changes | ||
| Oct 25, 2022 | Never finaled issued May 2023, no final | 42 Clipper St | Devlin/Mcnally Construction | alter site permit pa201912190060 for rev desc:"renovation and add'n to (e) 2-unit building w/in (e) footprint.convert (e) garage to habitable space,add (n) garage underneath 1/l.(n) 690sf horizontal add'n on 3/l.renovated bldg to contain entry foyer, kitchen, lr, dr, study, 2beds, 2baths, 1wc...Details
alter site permit pa201912190060 for rev desc:"renovation and add'n to (e) 2-unit building w/in (e) footprint.convert (e) garage to habitable space,add (n) garage underneath 1/l.(n) 690sf horizontal add'n on 3/l.renovated bldg to contain entry foyer, kitchen, lr, dr, study, 2beds, 2baths, 1wc... | |
| Sep 7, 2022 | Expired or cancelled expired Sep 2026 | 600 Wisconsin St | Nima Construction | rev to pa202111192835: structural updates to foundation design, architectural updates to interior plan, no change to scope. no change to demo calculations, interior work only.Details
rev to pa202111192835: structural updates to foundation design, architectural updates to interior plan, no change to scope. no change to demo calculations, interior work only. | |
| Aug 4, 2022 | Completed final sign-off Oct 2023 | 4122 26th St | Eco Logic Construction & Design Inc. | rev to 202203018915: to clarify fire sprinlers and egress scope as required by sfdbi & sffd.Details
rev to 202203018915: to clarify fire sprinlers and egress scope as required by sfdbi & sffd. | |
| Jun 24, 2022 | Completed final sign-off Sep 2024 | 600 Wisconsin St | Concretum Operis Inc., Nima Construction | shoring engineering permit to approved building permit 202111192835.Details
shoring engineering permit to approved building permit 202111192835. | |
| Mar 1, 2022 | Completed final sign-off Oct 2023 | 4122 26th St | Eco Logic Construction & Design Inc. | revision to pa# 201906133363-s1. structural updates to post locations (per plan) were made to avoid adjacent tree roots.Details
revision to pa# 201906133363-s1. structural updates to post locations (per plan) were made to avoid adjacent tree roots. | |
| Dec 8, 2021 | Completed final sign-off Sep 2026 | 600 Wisconsin St | Nima Construction | renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f additionDetails
renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f addition | $500,000 |
| Nov 19, 2021 | Expired or cancelled expired Sep 2026 | 600 Wisconsin St | Nima Construction | revision to 202103196927: replace and reconfigure 1st and 2nd fl interior to include: (n) elevator shaft (n)interior stais, replace & reconfigure kitchen and replace (e) bathrooms and laundry. no exterior workDetails
revision to 202103196927: replace and reconfigure 1st and 2nd fl interior to include: (n) elevator shaft (n)interior stais, replace & reconfigure kitchen and replace (e) bathrooms and laundry. no exterior work | $300,000 |
| Sep 21, 2021 | Completed final sign-off Dec 2023 | 4422 17th St | Cal Am Construction Inc. | revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear.Details
revision to pa 202012080497 to add powder room, bathroom remodel, reconfigure kitchen, new slider at rear. | $30,000 |
| Mar 19, 2021 | Expired or cancelled cancelled Feb 2022 | 600 Wisconsin St | Nima Construction | interior renovation of an extg single family dwelling. replace and reconfigure kitchen and master suite. replace and reconfigure main interior stair.Details
interior renovation of an extg single family dwelling. replace and reconfigure kitchen and master suite. replace and reconfigure main interior stair. | $100,000 |
| Feb 8, 2021 | Completed final sign-off Jun 2024 | 671 04th Av | add a 191 sq.ft. horizontal one-story rear addition on grd flr & convert portion of non-habitable space on grg flr. (n) grd flr habitable space to contain (1) bedroom,(1) bathroom, & studio work space, roof of the addition to be used as rear yard access & deck.Details
add a 191 sq.ft. horizontal one-story rear addition on grd flr & convert portion of non-habitable space on grg flr. (n) grd flr habitable space to contain (1) bedroom,(1) bathroom, & studio work space, roof of the addition to be used as rear yard access & deck. | $400,000 | |
| Dec 8, 2020 | Completed final sign-off Dec 2023 | 4422 17th St | Cal Am Construction Inc. | interior renovation of existing single family dwelling. replace and reconfigure kitchen. replace and relocate exterior doors and window in rear. reconfigure downstairs family room to have family room stair foyer and officeDetails
interior renovation of existing single family dwelling. replace and reconfigure kitchen. replace and relocate exterior doors and window in rear. reconfigure downstairs family room to have family room stair foyer and office | $150,000 |
| Sep 24, 2020 | Expired or cancelled withdrawn Jan 2022 | 42 Clipper St | this is a udu legalization permit to be associated with pa201912190060/2020-000205prj (ashley.lindsay@sfgov.org); legalize (e) unauthorized dwelling unit through the unit legalization ordinance 43-14. reconfigure (e) udu for compliance.Details
this is a udu legalization permit to be associated with pa201912190060/2020-000205prj (ashley.lindsay@sfgov.org); legalize (e) unauthorized dwelling unit through the unit legalization ordinance 43-14. reconfigure (e) udu for compliance. | $272,600 | |
| Dec 19, 2019 | Never finaled issued Apr 2022, no final | 42 Clipper St | Devlin/Mcnally Construction | renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc.Details
renovation & addition to single house, all work remain w/i existing bldg footprint, convert garage to habilitable space, 690 gsf horizontal addition to 3rd fl, add roodeck w/shade structure, add solar panel, balcony at front facade, interior stair, exterior landscapestair to meet cbc. | $750,000 |
| Jun 13, 2019 | Completed final sign-off Oct 2023 | 4122 26th St | Eco Logic Construction & Design Inc. | reconfigure & rebuild (e) rear deck & stairs.Details
reconfigure & rebuild (e) rear deck & stairs. | $20,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2020 | 18 Romain St | Nicholas Burnham Construction | interior renovation at 1st story of (e) single family residence. reconfigure exiting storage space to contain 1 (n) bathroom, 1 (n) media room and 1 (n) office.Details
interior renovation at 1st story of (e) single family residence. reconfigure exiting storage space to contain 1 (n) bathroom, 1 (n) media room and 1 (n) office. | $30,000 |
| Apr 13, 2018 | Never finaled issued May 2018, no final | 787 Castro St | Jeff King And Company Inc | revision to pa #201608084474. (e) non-conforming garage stairs to be rebuilt in kind to create tread uniformity.Details
revision to pa #201608084474. (e) non-conforming garage stairs to be rebuilt in kind to create tread uniformity. | $1,000 |
| Apr 20, 2017 | Completed final sign-off Jan 2021 | 248 Prospect Av | Rico's General Construction | excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required.Details
excavate for basement level remodel, 1st floor remodel, 2nd story (n) 700 ft vertical addition with (n) kitchen, (n) bath & (n) great room. reepair rear deck & stairs not to exceed 50% in kind as required. | $200,000 |
| Nov 9, 2016 | Never finaled issued Dec 2016, no final | 950 Noe St | William Pattengill | tenant improvement for professional services/arch office. to include reconfigured ada compliant bath, new partition wall, new sink, relocate e elec panel. building to remain b occupancy per zad7717zad. use to remain as determined in cod record 8241zadDetails
tenant improvement for professional services/arch office. to include reconfigured ada compliant bath, new partition wall, new sink, relocate e elec panel. building to remain b occupancy per zad7717zad. use to remain as determined in cod record 8241zad | $3,000 |
| Sep 23, 2016 | Completed final sign-off Sep 2017 | 1985 15th St | Lee & Company Contractors Inc | revision to 201509106603r2: reconfigure bathroom on 3rd. revise window operation on 3rd. new fireplace at 3rd flr.Details
revision to 201509106603r2: reconfigure bathroom on 3rd. revise window operation on 3rd. new fireplace at 3rd flr. | $5,000 |
| Aug 8, 2016 | Never finaled issued Apr 2017, no final | 787 Castro St | Jeff King And Company Inc | reconfigure (e) kitchen, panty and water closet @ first floor. reconfigure (e) bathrooms and closets @ second floor. rebuild & reconfigure (e) stairs throughout. (n) attic access stair.Details
reconfigure (e) kitchen, panty and water closet @ first floor. reconfigure (e) bathrooms and closets @ second floor. rebuild & reconfigure (e) stairs throughout. (n) attic access stair. | $100,000 |
| Aug 5, 2016 | Never finaled filed Aug 2016, never issued | 787 Castro St | revision to ref pa 200604068409: changes to stairs, and finishesDetails
revision to ref pa 200604068409: changes to stairs, and finishes | ||
| May 9, 2016 | Completed final sign-off Dec 2022 | 4122 26th St | (n) 8' x 8' dormer and dormer window over (e) bathroom.reconfigure (e) bathroom.Details
(n) 8' x 8' dormer and dormer window over (e) bathroom.reconfigure (e) bathroom. | $10,000 | |
| Apr 5, 2016 | Expired or cancelled expired Mar 2018 | 18 Romain St | Templeman Builders | revision to pa 2014-0224-9201, delete all habitable rooms at 1st floor and turn to storage. add door from storage to exit at stairs.Details
revision to pa 2014-0224-9201, delete all habitable rooms at 1st floor and turn to storage. add door from storage to exit at stairs. | |
| Mar 17, 2016 | Completed final sign-off Mar 2018 | 230 Acadia St | Brendan Waters Construction Inc | horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom.Details
horizontal addition to (e) 3rd flr to include: new bathroom, dormer, roofdeck, closet, office and enlarge existing bedroom. | $50,000 |
| Jan 28, 2016 | Completed final sign-off Feb 2017 | 2628 15th Av | reconfigure (e) kitchen and bathroom at 1st flr: reconfigure (e) bathroom, w.c., and closets at 2nd flr; (n)exterior windows, doors and skylights throughout (n) roof.Details
reconfigure (e) kitchen and bathroom at 1st flr: reconfigure (e) bathroom, w.c., and closets at 2nd flr; (n)exterior windows, doors and skylights throughout (n) roof. | $200,000 | |
| Dec 15, 2015 | Completed final sign-off Jul 2020 | 4378 Cesar Chavez St | Saturn Construction Co | remodel (e) res'd, replace (e) windows, convert portion of (e) basement to habitable area (660 sf). (n) habitable area @ lowel level to contain great room, bathrm, wetbar & storage. renconfigure (e) 2nd level to contain (2) bathrm,(2) bedrms, (3)closet, laundry & family rm. reconfigure (e) stair &Details
remodel (e) res'd, replace (e) windows, convert portion of (e) basement to habitable area (660 sf). (n) habitable area @ lowel level to contain great room, bathrm, wetbar & storage. renconfigure (e) 2nd level to contain (2) bathrm,(2) bedrms, (3)closet, laundry & family rm. reconfigure (e) stair & | $150,000 |
| Sep 10, 2015 | Completed final sign-off Sep 2017 | 1985 15th St | Lee & Company Contractors Inc | convert (e) attic to habitable space. (n)habitable space to contain two bedrooms and one bathroom. (n) code compliant stair to attic. (n) dormer over stair and (n) dormer in master bedroomDetails
convert (e) attic to habitable space. (n)habitable space to contain two bedrooms and one bathroom. (n) code compliant stair to attic. (n) dormer over stair and (n) dormer in master bedroom | $100,000 |
| Jul 22, 2015 | Completed final sign-off Sep 2017 | 1985 15th St | Lee & Company Contractors Inc | repair/replace damaged structural + architectural framing + finishes on 3rd floor, attic & roof levels of (e) residence. (n) skylights. install (n) code compliant sprinkler system throughout each level of the bldg.Details
repair/replace damaged structural + architectural framing + finishes on 3rd floor, attic & roof levels of (e) residence. (n) skylights. install (n) code compliant sprinkler system throughout each level of the bldg. | $150,000 |
| Jul 17, 2015 | Completed final sign-off May 2016 | 567 Texas St | new 100 sq ft garden utility structure on vacant lot. shed to contain water closet, storage and work surface.Details
new 100 sq ft garden utility structure on vacant lot. shed to contain water closet, storage and work surface. | $10,000 | |
| Mar 27, 2015 | Completed final sign-off Aug 2015 | 230 Acadia St | convert (e) garage into habitable space with new wet bar, laundry room and media room. replace (e) window in the habitable space.door w/(n) non-operable garage door.Details
convert (e) garage into habitable space with new wet bar, laundry room and media room. replace (e) window in the habitable space.door w/(n) non-operable garage door. | $6,000 | |
| Feb 23, 2015 | Completed final sign-off Dec 2015 | 912 Wisconsin St | Rua Woods Construction Inc | remodel extg kitchen and bathroom. (replace 12 extg windows)Details
remodel extg kitchen and bathroom. (replace 12 extg windows) | $40,000 |
| Jan 30, 2015 | Expired or cancelled expired Jun 2017 | 261 10th Av | S Hall Builders Inc, Vk Construction | details for new concrete slab foundation reference 201307161993 s1. one-story detached garage.Details
details for new concrete slab foundation reference 201307161993 s1. one-story detached garage. | |
| Sep 11, 2014 | Expired or cancelled cancelled Jan 2026 | 248 Prospect Av | lightwell infill, 12 ft fremodel e kitchen, remodel e bathDetails
lightwell infill, 12 ft fremodel e kitchen, remodel e bath | $27,000 | |
| Aug 21, 2014 | Expired or cancelled cancelled Jan 2026 | 150 Mississippi St | @003k%ua85daDetails
@003k%ua85da | $40,000 | |
| Jul 3, 2014 | Never finaled filed Jul 2014, never issued | 259 Frederick St | renovation & 2-story addition to (e) 1-story masonry structure. (e) masonry structure to contain 1 car garage, entry foyer, walk in closet, den, 1-bedroom & 1-bathroom. 2-story addition to contain 3 bedrooms, great room, kitchen, & 2 bathrooms. stair penthouse at roof.Details
renovation & 2-story addition to (e) 1-story masonry structure. (e) masonry structure to contain 1 car garage, entry foyer, walk in closet, den, 1-bedroom & 1-bathroom. 2-story addition to contain 3 bedrooms, great room, kitchen, & 2 bathrooms. stair penthouse at roof. | $300,000 | |
| May 12, 2014 | Completed final sign-off Jan 2017 | 261 10th Av | relocate 2 deck columns at e deck. reinforce deck framing as necessary. reference pa#2013-0716-1993.Details
relocate 2 deck columns at e deck. reinforce deck framing as necessary. reference pa#2013-0716-1993. | $3,000 | |
| Feb 24, 2014 | Expired or cancelled expired Mar 2018 | 18 Romain St | Templeman Builders | vertical addition. remodel 2nd fl & 1st fl. remodel 1st social rm & bathrm, remove/relocate kitchen, remodel 2nd fl bedrm, bathrm, kitchen, living rm. exterior deck, (n) 675 sf vertical addition to contain master bedroom and bathrm.Details
vertical addition. remodel 2nd fl & 1st fl. remodel 1st social rm & bathrm, remove/relocate kitchen, remodel 2nd fl bedrm, bathrm, kitchen, living rm. exterior deck, (n) 675 sf vertical addition to contain master bedroom and bathrm. | $200,000 |
| Jan 17, 2014 | Never finaled issued Nov 2014, no final | 413 Shrader St | J5 Real Estate Development Co | remodel interior of (e) blding as indicated on plans. replace (e) windows with new windows to match (e) in appearance patch & repair (e) siding as req'd. add new roof dormer to accommodate new interior code compliant stairway. replace (e) gutters & downspouts throughout. rebuild & reconfigure (e)Details
remodel interior of (e) blding as indicated on plans. replace (e) windows with new windows to match (e) in appearance patch & repair (e) siding as req'd. add new roof dormer to accommodate new interior code compliant stairway. replace (e) gutters & downspouts throughout. rebuild & reconfigure (e) | $90,000 |
| Oct 10, 2013 | Completed final sign-off Jan 2021 | 248 Prospect Av | convert portion of (e) basement into garage. remove (e) front porch, replace (e) porch with conc. deck. extend portion of front wall (31 sf. addition) @main levelDetails
convert portion of (e) basement into garage. remove (e) front porch, replace (e) porch with conc. deck. extend portion of front wall (31 sf. addition) @main level | $30,000 | |
| Aug 20, 2013 | Completed final sign-off Dec 2022 | 4122 26th St | convert portion of (e) attic to habitable space (n) one bedroom, 2 new dormers. rebuild (e) stair to attic. remove (e) attic deck stair. new sprinkler system on attic level. (nfpa 13r)Details
convert portion of (e) attic to habitable space (n) one bedroom, 2 new dormers. rebuild (e) stair to attic. remove (e) attic deck stair. new sprinkler system on attic level. (nfpa 13r) | $30,000 | |
| Jul 16, 2013 | Completed final sign-off Jan 2017 | 261 10th Av | convert (e) garage to single family dwelling. add (n) kitchen, (n) bathroom in (e) building envelope. replace (e) windows & doors. (n) french door.Details
convert (e) garage to single family dwelling. add (n) kitchen, (n) bathroom in (e) building envelope. replace (e) windows & doors. (n) french door. | $10,000 | |
| Jun 21, 2012 | Never finaled filed Jun 2012, never issued | 2 Hill Point Av | Sassoon Construction | comply with complaint #201237024 - convert (e) counter in basement family room to wet bar.Details
comply with complaint #201237024 - convert (e) counter in basement family room to wet bar. | $500 |
| May 2, 2007 | Completed final sign-off May 2009 | 1683 Hayes St | convert existing attic into habitable space. demolish rear portion of roof to accomodate a new roof deck over existing kitchen sunroom.Details
convert existing attic into habitable space. demolish rear portion of roof to accomodate a new roof deck over existing kitchen sunroom. | $45,000 |