Nick Mironov
- License
- 19414
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Gayner Engineers
- On San Francisco permits
- Apr 2005 to Sep 2011
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill Const Service Inc, Gonsalves & Stronck Construction Co.
- Architects
- Fong & Chan Architects, Kit Ratcriff
- Engineers
- Kristina Martin
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2011 | Completed final sign-off Oct 2013 | 1400 Geary Bl | Gonsalves & Stronck Construction Co. | renovation and refurbishing of bedrooms,toilets, shared program spaces, staff areas and corridors on the mezzanine and third floors of existing 26 story steel and concrete bldg. project also includes the renovation of existing construction in and around a large mechanical shaft on the mezz. & 3rd flDetails
renovation and refurbishing of bedrooms,toilets, shared program spaces, staff areas and corridors on the mezzanine and third floors of existing 26 story steel and concrete bldg. project also includes the renovation of existing construction in and around a large mechanical shaft on the mezz. & 3rd fl | $3,800,000 |
| Apr 21, 2005 | Completed final sign-off Aug 2005 | 536 Mission St | Cahill Const Service Inc | remodel of basement level at law school library includes adding new compact shelving & upgradingDetails
remodel of basement level at law school library includes adding new compact shelving & upgrading | $974,000 |