Narsumha Tanikella
- Listed as
- architect, engineer
- Firm
- Mp Structural Engineers
- Based in
- San Ramon
- On San Francisco permits
- Jul 2023 to Sep 2026
21 permits since 2000 (engineer on 19 permits, architect on 2 permits): 12 completed, 8 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 441 Baker St | Elemento Builders Inc. | back yard retaining wall per building inspector.Details
back yard retaining wall per building inspector. | $10,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 540 Shotwell St | Mrm Ventures Llc. | new concrete slab, wood framed structure over retaining wall of garage, like for like design. (technically detached from house so no title 24 requirements)Details
new concrete slab, wood framed structure over retaining wall of garage, like for like design. (technically detached from house so no title 24 requirements) | $60,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 1515 Sunnydale Av | John Sutti & Associates, Inc. | 1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep.Details
1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep. | $1,200,000 |
| Dec 31, 2025 | In progress filed Dec 2025, not yet issued | 363 Monterey Bl | rear yard remodel for new decks at rear of 1/f and 2/f. new sliding glass doors. new window at 1/f. new spiral stairs for decks. firewall and stairs from storage level deck to lower level deck, (n) storage door, and outdoor lighting.Details
rear yard remodel for new decks at rear of 1/f and 2/f. new sliding glass doors. new window at 1/f. new spiral stairs for decks. firewall and stairs from storage level deck to lower level deck, (n) storage door, and outdoor lighting. | $15,000 | |
| Nov 5, 2025 | Completed final sign-off Dec 2025 | 32 Harris Pl | adding a wall between master bedroom and office to make 2 separte bedrooms. no structural modifications plannedDetails
adding a wall between master bedroom and office to make 2 separte bedrooms. no structural modifications planned | $20,000 | |
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 3516 Divisadero St | G A G Construction Co | to correct construction of a stair penthouse as per planning approval 2024007495prj.Details
to correct construction of a stair penthouse as per planning approval 2024007495prj. | $5,000 |
| Jun 6, 2025 | In progress issued Jul 2025 | 333 Baker St | Carbon Zero Buildings Inc | remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical workDetails
remove 2 water boilers, reconfigure solar and boiler storage, provide new hot water heat pump on roof within associated electrical, plumbing and mechanical work | $175,000 |
| May 30, 2025 | In progress issued Jun 2025 | 1180 04th St | Carbon Zero Buildings Inc | remove old water boilers, install new heat pump, new hot water heating system, install new heat pump and perfrom associated electrical work, disconnect and cap gas pipes.Details
remove old water boilers, install new heat pump, new hot water heating system, install new heat pump and perfrom associated electrical work, disconnect and cap gas pipes. | $200,000 |
| Mar 7, 2025 | Completed final sign-off Feb 2026 | 871 Turk St | Carbon Zero Buildings Inc | revision to 202410183281, revision to upgrade electrical support and associated structural attachments to approved mechanical upgrades.Details
revision to 202410183281, revision to upgrade electrical support and associated structural attachments to approved mechanical upgrades. | $5,000 |
| Feb 14, 2025 | Completed final sign-off Jul 2026 | 50 Marvel Ct | Fifth Arch Llp | remodel of (e) 2 story single family residence. interior work involves renovation of (e) conditioned space and partial conversion of garage to conditioned space, no change to footprint or envelope.Details
remodel of (e) 2 story single family residence. interior work involves renovation of (e) conditioned space and partial conversion of garage to conditioned space, no change to footprint or envelope. | $325,000 |
| Oct 18, 2024 | Completed final sign-off Feb 2026 | 871 Turk St | Carbon Zero Buildings Inc | updating mechanical, electrical and plumbing systems in an existing apartment building and including structural supports. all work to incur in common areaDetails
updating mechanical, electrical and plumbing systems in an existing apartment building and including structural supports. all work to incur in common area | $300,000 |
| Apr 17, 2024 | Completed final sign-off Jul 2024 | 552 Roosevelt Wy | Reliable Construction Inc | replace damaged exterior parapet wall like-to-like (12'length x 7' tall parapet)Details
replace damaged exterior parapet wall like-to-like (12'length x 7' tall parapet) | $10,000 |
| Mar 1, 2024 | Completed final sign-off Apr 2024 | 169 Seville St | Reliable Construction Inc | voluntary replacement of beams, posts & foundation in the garage to support existing 2nd floor & roof.Details
voluntary replacement of beams, posts & foundation in the garage to support existing 2nd floor & roof. | $35,000 |
| Mar 1, 2024 | Completed final sign-off Aug 2024 | 137 06th Av | Reliable Construction Inc | revision to pa#202401234473. additional extg brick foundation on the sides of the building to be replaced voluntarily with concrete footing.Details
revision to pa#202401234473. additional extg brick foundation on the sides of the building to be replaced voluntarily with concrete footing. | $80,000 |
| Feb 23, 2024 | Completed final sign-off Aug 2024 | 137 06th Av | Reliable Construction Inc | revision to 202312273173. increase scope of work to include like for like replacement of 2nd fl bathroom fixtures for (2 total bathrooms at 2nd floor) in kindDetails
revision to 202312273173. increase scope of work to include like for like replacement of 2nd fl bathroom fixtures for (2 total bathrooms at 2nd floor) in kind | $10,000 |
| Jan 25, 2024 | Completed final sign-off May 2024 | 2478 42nd Av | Reliable Construction Inc | gravity support for second floor remodel and remove of an extg interior stair.Details
gravity support for second floor remodel and remove of an extg interior stair. | $20,000 |
| Jan 23, 2024 | Completed final sign-off Aug 2024 | 137 06th Av | Reliable Construction Inc | replace (e) brick foundation at rear wall with concrete foundation like to like voluntarily.Details
replace (e) brick foundation at rear wall with concrete foundation like to like voluntarily. | $10,000 |
| Dec 27, 2023 | Completed final sign-off Aug 2024 | 137 06th Av | Reliable Construction Inc | revision to permit# 202309086194: interior remodel - change (e) bath into living space, convert (e) storage to bathroom, expand kitchen by removing a load bearing wall between (e) kitchen and bedroom.Details
revision to permit# 202309086194: interior remodel - change (e) bath into living space, convert (e) storage to bathroom, expand kitchen by removing a load bearing wall between (e) kitchen and bedroom. | $40,000 |
| Nov 3, 2023 | In progress issued Jul 2025 | 9 Tioga Av | enclose existing front porch, 3bedrom, 2bath. convert grd floor back of garage to master bedroom. kitchen and bathroom remodel, window replacement, painting, flooring, plumbing, electrical replacement. infill lightwell.Details
enclose existing front porch, 3bedrom, 2bath. convert grd floor back of garage to master bedroom. kitchen and bathroom remodel, window replacement, painting, flooring, plumbing, electrical replacement. infill lightwell. | $50,000 | |
| Aug 4, 2023 | Completed final sign-off Dec 2023 | 4079 25th St | Reliable Construction Inc | front bldg: replace (e) wood beam & posts w/ a steel beam & new psl posts. providing new footings at these posts. work only at 1st fl. no sf changed, no walls moved. no lateral upgrade.Details
front bldg: replace (e) wood beam & posts w/ a steel beam & new psl posts. providing new footings at these posts. work only at 1st fl. no sf changed, no walls moved. no lateral upgrade. | $20,000 |
| Jul 24, 2023 | Never finaled filed Jul 2023, never issued | 1342 Revere Av | legalization of rear cottage with >5ft side yards to the street.Details
legalization of rear cottage with >5ft side yards to the street. | $200,000 |