Megan J Carter
- License
- C36090
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Cb Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Sep 2021
6 permits since 2000 (architect on 6 permits): 5 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Ho Bok Construction (2), Bethel Construction Inc Dba Aaa Construc, Dollard Construction Inc., Novo Construction Inc, Rockridge Builders
- Engineers
- Engin Yagmur, Eugene E St. Onge
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 2
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2021 | Never finaled issued Sep 2021, no final | 75 Folsom St | Dollard Construction Inc. | rev to pa# 2020-0626-9227: unit #1403:layout changes to west master bath and bath2. replace pocket doors at master bed with simple sliding door. relocate washer/dryer, new wetbar/coffee bar.Details
rev to pa# 2020-0626-9227: unit #1403:layout changes to west master bath and bath2. replace pocket doors at master bed with simple sliding door. relocate washer/dryer, new wetbar/coffee bar. | $10,000 |
| Jan 7, 2021 | Completed final sign-off Jul 2023 | 2519 Harrison St | Rockridge Builders | new roof deck, skylights, and stairs from 3rd floor to the roof.Details
new roof deck, skylights, and stairs from 3rd floor to the roof. | $50,000 |
| Nov 19, 2019 | Completed final sign-off May 2020 | 40 Jersey St | Bethel Construction Inc Dba Aaa Construc | work at unit 40 only, includes removing (e) entry door and relocating engry to existing garden door. existing bedroom to be enlarged by removal oe (e) non-load bearing wallDetails
work at unit 40 only, includes removing (e) entry door and relocating engry to existing garden door. existing bedroom to be enlarged by removal oe (e) non-load bearing wall | $1,000 |
| Jul 18, 2019 | Completed final sign-off May 2020 | 989 Market St | Novo Construction Inc | demolition on the 3rd fl. per ab-017.Details
demolition on the 3rd fl. per ab-017. | $5,000 |
| Jun 20, 2019 | Completed final sign-off Sep 2020 | 2457 20th Av | Ho Bok Construction | remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in heightDetails
remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in height | $200,000 |
| Feb 23, 2017 | Completed final sign-off Sep 2017 | 90 Aquavista Wy | Ho Bok Construction | renovation to kitchen & bathroom on 2nd floor. 1st flor renovate to (e) great room. 31 sf of the garage to be converted to conditioned space to include bedroom, bedroom, bathroom & hallway.Details
renovation to kitchen & bathroom on 2nd floor. 1st flor renovate to (e) great room. 31 sf of the garage to be converted to conditioned space to include bedroom, bedroom, bathroom & hallway. | $64,650 |