Eugene St. Onge
- Listed as
- engineer
- Firm
- St Onge & Assoc.
- Based in
- Oakland
- On San Francisco permits
- Feb 2005 to Aug 2025
24 permits since 2000 (engineer on 24 permits): 11 completed, 8 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2025 | Completed final sign-off Apr 2026 | 3 Topaz Wy | selective demo portion of level 1 & 2 decks as needed for access of 1 topaz work to install footings, post & lvl framing reconnect level 1 & 2 decks joists to new post & lvl framing. repair or replace wood rot to wind walls joists, decking, railings & patch in new wood shingle siding.Details
selective demo portion of level 1 & 2 decks as needed for access of 1 topaz work to install footings, post & lvl framing reconnect level 1 & 2 decks joists to new post & lvl framing. repair or replace wood rot to wind walls joists, decking, railings & patch in new wood shingle siding. | $100 | |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 1 Topaz Wy | Done Right Home Remodeling Inc. | replacement in kind of an (e) deck for an upper floor unit in an (e) 3 story/2-unit condominium. deck will include open railings and conforms with pcs 188. comply w/nov 202311581.Details
replacement in kind of an (e) deck for an upper floor unit in an (e) 3 story/2-unit condominium. deck will include open railings and conforms with pcs 188. comply w/nov 202311581. | $100,000 |
| Mar 6, 2025 | In progress filed Mar 2025, not yet issued | 495 Ralston St | Hybrid City Construction Inc | new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen.Details
new 480 sf detached adu at side yard type 5b, 1-story, with 1-bedroom, 1-full bathroom, 1-great room, and 1-kitchen. | $95,000 |
| Jan 16, 2025 | In progress filed Jan 2025, not yet issued | 374 06th Av | rear bldg - erect a type 5, 2-story, new building with an adu unit at the rear of the property.Details
rear bldg - erect a type 5, 2-story, new building with an adu unit at the rear of the property. | $250,000 | |
| Nov 13, 2024 | In progress filed Nov 2024, not yet issued | 1922 Bush St | conversion of existing garage on the basement/first level to an adu.Details
conversion of existing garage on the basement/first level to an adu. | $116,250 | |
| Sep 3, 2024 | In progress filed Sep 2024, not yet issued | 225 Diamond St | conversion of existing ground floor (storage), to addition of upper residential unit b. adding an interior stairs to connect the two flrs, adding a bathroom and bedroom on ground flr; existing unit b is one bedroom one bath, proposed one is two bedroom two bath. no exterior..Details
conversion of existing ground floor (storage), to addition of upper residential unit b. adding an interior stairs to connect the two flrs, adding a bathroom and bedroom on ground flr; existing unit b is one bedroom one bath, proposed one is two bedroom two bath. no exterior.. | $50,000 | |
| Aug 2, 2024 | Completed final sign-off Apr 2025 | 1827 11th Av | Wooley Landscapes | to comply with nov 202418716, relocate of stair, new stair & railing construction. replace cmu block retaining along property lineDetails
to comply with nov 202418716, relocate of stair, new stair & railing construction. replace cmu block retaining along property line | $40,000 |
| Jan 8, 2024 | Completed final sign-off Sep 2024 | 1080 Francisco St | U S Prime Contractor Inc | voluntary seismic upgrade at the garage level.Details
voluntary seismic upgrade at the garage level. | $119,000 |
| Nov 17, 2023 | In progress filed Nov 2023, not yet issued | 3 Topaz Wy | install footings, post and railing on level 2Details
install footings, post and railing on level 2 | $5,000 | |
| Nov 17, 2023 | In progress filed Nov 2023, not yet issued | 1 Topaz Wy | comply with nov 202311581 (level 3) rebuild deck in rear of buildingDetails
comply with nov 202311581 (level 3) rebuild deck in rear of building | $12,000 | |
| Oct 31, 2023 | In progress issued Jul 2025 | 2928 Laguna St | Mission Home Remodeling Inc | front: new single family home to be built over existing two car garage.Details
front: new single family home to be built over existing two car garage. | $450,000 |
| Oct 31, 2023 | In progress issued Jul 2025 | 2930 Laguna St | main rear: 1/f: renovate (e) bathroom, add shower, create new cooridor alongside garage for exit access to rear living space, new sliding glass door at rear living space and new exterior steps to deck. 2/f: no work. 3/f: 100sf addition to rear bedroom, renovate and expand existing. demo chimney.Details
main rear: 1/f: renovate (e) bathroom, add shower, create new cooridor alongside garage for exit access to rear living space, new sliding glass door at rear living space and new exterior steps to deck. 2/f: no work. 3/f: 100sf addition to rear bedroom, renovate and expand existing. demo chimney. | $40,000 | |
| Mar 16, 2023 | Never finaled issued Jul 2023, no final | 1236 Mason St | Pineda Construction Inc | to comply with nov 201859272. removal and replacement of existing site retaining wall at property line.Details
to comply with nov 201859272. removal and replacement of existing site retaining wall at property line. | $45,000 |
| Mar 16, 2023 | Completed final sign-off Nov 2024 | 1076 Washington St | Pineda Construction Inc | to comply with nov 201858971. removal and replacement of existing site retaining wall at property line.Details
to comply with nov 201858971. removal and replacement of existing site retaining wall at property line. | $45,000 |
| Jun 30, 2022 | Expired or cancelled withdrawn Nov 2023 | 251 Montana St | Red House Construction | revision to pa# 201905019472. change balcony to enclose area.Details
revision to pa# 201905019472. change balcony to enclose area. | |
| Jan 7, 2021 | Completed final sign-off Jul 2023 | 2519 Harrison St | Rockridge Builders | new roof deck, skylights, and stairs from 3rd floor to the roof.Details
new roof deck, skylights, and stairs from 3rd floor to the roof. | $50,000 |
| Oct 4, 2019 | Completed final sign-off Jan 2023 | 855 Castro St | Casement Construction | legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641.Details
legalization of exterior deck & construction of 14'-0" by 7'-6" long fire wall.adding an exterior grade 1 hour wall to the north side fo the yard to protect the deck at the second level.to comply w/ nov# 201960641. | $7,000 |
| Aug 30, 2018 | Expired or cancelled expired Oct 2026 | 770 Natoma St | Brady Construction Inc | mandatory soft story program sfebc chapter 4d. engineering criteria iebc a4. **comply w/ maher**. (ss portion cost $55,000). foundation replacement and lower basement level for future adu under #201912270858.Details
mandatory soft story program sfebc chapter 4d. engineering criteria iebc a4. **comply w/ maher**. (ss portion cost $55,000). foundation replacement and lower basement level for future adu under #201912270858. | $100,000 |
| Feb 16, 2018 | Completed final sign-off Apr 2019 | 941 14th St | P Jordan Builders Inc | (n) entry access route from street to lower level. remodel (3) (e) bathrooms. replace (e) internal staircase. foundation/retaining wall/concrete slab replacement. upgrade lower level rooms to meet current code.Details
(n) entry access route from street to lower level. remodel (3) (e) bathrooms. replace (e) internal staircase. foundation/retaining wall/concrete slab replacement. upgrade lower level rooms to meet current code. | $140,000 |
| Jan 2, 2008 | Completed final sign-off Jan 2009 | 1350 Holloway Av | remodeling interior of first and 2nd floors of sfd to include bathrooms, bedrooms, kitchen, living areas, etc. 1 story horiz addition is under separate application (2007-11-28-9124)Details
remodeling interior of first and 2nd floors of sfd to include bathrooms, bedrooms, kitchen, living areas, etc. 1 story horiz addition is under separate application (2007-11-28-9124) | $70,000 | |
| Dec 21, 2006 | Never finaled issued Dec 2006, no final | 947 Noe St | remodel kitchen update electrical, remodel bath. voluntary seismic improvements enlarge kchn wndw, double hung woodsashDetails
remodel kitchen update electrical, remodel bath. voluntary seismic improvements enlarge kchn wndw, double hung woodsash | $120,000 | |
| Jan 17, 2006 | Completed final sign-off Nov 2007 | 1500 Valencia St | umb: structural drawiangs for new passanger elevator, see refferance drawings : pa# 2005/06/10/4829 and pa# 2004/11/30/0314.Details
umb: structural drawiangs for new passanger elevator, see refferance drawings : pa# 2005/06/10/4829 and pa# 2004/11/30/0314. | ||
| Jun 10, 2005 | Completed final sign-off Dec 2007 | 1500 Valencia St | umb - accessibility upgrades as required by seismic retrofit previously permitted appl#200411300314 include restrooms, elevator and new accessible entry.Details
umb - accessibility upgrades as required by seismic retrofit previously permitted appl#200411300314 include restrooms, elevator and new accessible entry. | $800,000 | |
| Feb 3, 2005 | Never finaled issued Feb 2005, no final | 34 Pond St | Hugo Tejada/Dba Alpha & Omega Renovation | revision to app #200501052618/submit drawing with engineer stamps & signatureDetails
revision to app #200501052618/submit drawing with engineer stamps & signature |