Evan Wan Hin Cheung
- License
- M39462
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M39462 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Ec Engineers
- Based in
- Alameda
- On San Francisco permits
- May 2025 to Sep 2026
11 permits since 2000 (engineer on 11 permits): 5 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- C C I Commercial Construction & Improv (2), Topview Construction Group Inc (2), Cogent Llc, D & K Construction &Painting Company Inc, J&K Sheet Metal Co, Maven Maintenance Inc, Rsb Construction Group Inc, S L Construction Co
- Architects
- James Zak (2), Francisco Matos, Jim Lau, Suheil Shatara, Winnie Chen
- Engineers
- Benson Balan (8), George Wong (3), Horon Lee, Meg Luckenbach Hobbs, Sean Cheng
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 7
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 2435 Ocean Av | mechanical and electrical permit. refer to 202510076895Details
mechanical and electrical permit. refer to 202510076895 | $10,000 | |
| Jun 3, 2026 | In progress issued Jun 2026 | 663 San Jose Av | Topview Construction Group Inc | revision to 202504235073. children restroom relocation, washer/dryer installation, sink, dishwasher connection. one door at infant nap room revision, and addition of one outdoor deck for childcare use.Details
revision to 202504235073. children restroom relocation, washer/dryer installation, sink, dishwasher connection. one door at infant nap room revision, and addition of one outdoor deck for childcare use. | $20,000 |
| May 19, 2026 | In progress filed May 2026, not yet issued | 1944 Ocean Av | (e)tenant space @ 1944-1948 ocean ave previous use @ 1944 was cannabis retail & 1948 was billiard hall; both spaces will be converted to child day care & education use. 1/f infant child care i-4 occupancy, 2/f e-occupancy (3-5 yrs old as a separate business). new address on 2/f on fairfield way.Details
(e)tenant space @ 1944-1948 ocean ave previous use @ 1944 was cannabis retail & 1948 was billiard hall; both spaces will be converted to child day care & education use. 1/f infant child care i-4 occupancy, 2/f e-occupancy (3-5 yrs old as a separate business). new address on 2/f on fairfield way. | $150,000 | |
| Jan 30, 2026 | In progress issued Mar 2026 | 1273 Jackson St | Cogent Llc, S L Construction Co | to comply with nov 202423124 fire repair damaged 4 unit; upgrade to code where required build in kind; fire reapair @ laundromat storage and wash closet value @ 12kDetails
to comply with nov 202423124 fire repair damaged 4 unit; upgrade to code where required build in kind; fire reapair @ laundromat storage and wash closet value @ 12k | $850,000 |
| Jan 26, 2026 | Completed final sign-off May 2026 | 619 Post St | D & K Construction &Painting Company Inc | mep submittal for t.i. 202510278164. provide n) receptacles & gfi/wp receptacles, as indicated in plan, install interial lighting fixture & controls to comply w/ ca energy code req. provide nfs disconnection for e) mech equipment, remove/replace e) panal a with new a1Details
mep submittal for t.i. 202510278164. provide n) receptacles & gfi/wp receptacles, as indicated in plan, install interial lighting fixture & controls to comply w/ ca energy code req. provide nfs disconnection for e) mech equipment, remove/replace e) panal a with new a1 | $30,000 |
| Dec 31, 2025 | Completed final sign-off Aug 2026 | 736 14th St | Maven Maintenance Inc | tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour.Details
tenant improvement for a new massage parlour. change of use from jiu jitsu studio to massage parlour. | $10,000 |
| Nov 17, 2025 | Completed final sign-off Nov 2026 | 508 Balboa St | Rsb Construction Group Inc | revision to pa # 2025-0804-2231: change storage to restroom. revise ada restroom layout. revised kitchenette cabinet & sink layout.Details
revision to pa # 2025-0804-2231: change storage to restroom. revise ada restroom layout. revised kitchenette cabinet & sink layout. | $100 |
| Nov 10, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | C C I Commercial Construction & Improv | revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of houseDetails
revision to pa # 2025-0530-7632: comprising below scopes. all changes have been clouded #2. demo removal on non structural partitions & finishes. removal of (e) retail stair finishes. a: (n) retail space & back of house ti improvement. mep (n) mep system for retaul & back of house | |
| Jul 29, 2025 | In progress issued Oct 2025 | 1033 Taraval St | J&K Sheet Metal Co | install two hood exhaust fan/replace, partial duct replacementDetails
install two hood exhaust fan/replace, partial duct replacement | $4,500 |
| Jun 23, 2025 | In progress issued Apr 2026 | 663 San Jose Av | Topview Construction Group Inc | prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use)Details
prop h:tenant improvements for a licensed child care center. scope of work include non-structural interior demolition. installation of new partition walls. upgrades to restrooms to meet child care and ada requirements. new flooring, finishes, electrical, and plumbing as needed. (change of use) | $150,000 |
| May 30, 2025 | Completed final sign-off Feb 2026 | 146 Geary St | C C I Commercial Construction & Improv | basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remainDetails
basement, 1st & 2nd fl t.i. demo non structural partitions/finishes, removal e) retail stairs finishes. new retail space & back of house non structural paritions, ceiling finishes, casement, retail stair enclosure, guardrail, restrooms & b.of n rms w/ada complianct, water fountain. e)elevator remain | $200,000 |