Maurice Chee
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Bureau Of Engineers
- Based in
- San Francisco
- On San Francisco permits
- Apr 2003 to Feb 2015
7 permits since 2000 (engineer on 5 permits, architect on 1 permit, authorized agent-others on 1 permit): 3 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 4, 2015 | Completed final sign-off Jun 2016 | 993 Gilman Av | new children's play structures, alterations of restrooms for ada compliance and replacement of light poles and fixtures.Details
new children's play structures, alterations of restrooms for ada compliance and replacement of light poles and fixtures. | $728,000 | |
| Dec 1, 2010 | Never finaled issued May 2012, no final | 850 Bryant St | installation of two 1,000kw generators. work includes installation of fuel oil, suppy piping, and pumping system connecting to existing fuel tanks, electrical switch board, electrical raceways, conduit, wiring, and pull boxes.Details
installation of two 1,000kw generators. work includes installation of fuel oil, suppy piping, and pumping system connecting to existing fuel tanks, electrical switch board, electrical raceways, conduit, wiring, and pull boxes. | $750,000 | |
| May 14, 2009 | Completed final sign-off Nov 2011 | 1 South Van Ness Av | relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls.Details
relocation of emergency generator exhaust flue, relocation of guel tank vents, installation of a living roof, refubishing of existing window washing equipment system and painting of roof penthouse exterior walls. | $500,000 | |
| Jan 7, 2009 | Expired or cancelled withdrawn Jan 2011 | 850 Bryant St | work entails installation of 2 1,000 kw generators for the hall of justice bldg @ 850 bryant street. work includes installation of equipment pads, fuel oil piping with double containment & leak detection. electrical raseways, conduit, wiring, pull boxes and a switch boardDetails
work entails installation of 2 1,000 kw generators for the hall of justice bldg @ 850 bryant street. work includes installation of equipment pads, fuel oil piping with double containment & leak detection. electrical raseways, conduit, wiring, pull boxes and a switch board | ||
| Jun 16, 2008 | Completed final sign-off Apr 2009 | 1351 24th Av | Chiang C M Construction Inc. | revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work).Details
revision to application 2005021155564-r-1. exterior: add new ada ramp. interior: modify toilet layout, new counter, opening to registration, new partitions at 2nd floor. (barrier removal work). | $72,250 |
| Apr 30, 2007 | Expired or cancelled expired Aug 2008 | 1200 15th St | remodeling of (e) office/surgery into seperate surgery & prep.room. remove (e) furniture & accessories in (e) office, in surgery remove (e) counter sink & ceiling difuser, divide (e) office/stor & surgery into 2 rooms by a full hg. glass wall with sliding doors.relcoate cages, cabs,equip.& devices.Details
remodeling of (e) office/surgery into seperate surgery & prep.room. remove (e) furniture & accessories in (e) office, in surgery remove (e) counter sink & ceiling difuser, divide (e) office/stor & surgery into 2 rooms by a full hg. glass wall with sliding doors.relcoate cages, cabs,equip.& devices. | ||
| Apr 21, 2003 | Never finaled issued Dec 2003, no final | 201 Van Ness Av | 5th floor - hvac controll upgrade througout entire buiding.Details
5th floor - hvac controll upgrade througout entire buiding. |