Behruz Vahdani-Sanavi, Ph.D.,P.E
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Us Prime Contractor Inc.
- Based in
- Laguna Niguel
- On San Francisco permits
- Apr 2002 to Aug 2026
282 permits since 2000 (engineer on 257 permits, architect on 13 permits, designer on 6 permits, authorized agent-others on 5 permits, pmt consultant/expediter on 1 permit): 228 completed, 7 in progress, 25 never finaled, 22 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 282.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Oct 2026 | 563 Sutter St | U S Prime Contractor Inc | revision to permit 202607144975. addition of 3 new massage rooms.Details
revision to permit 202607144975. addition of 3 new massage rooms. | $2,000 |
| Jul 14, 2026 | In progress issued Aug 2026 | 563 Sutter St | U S Prime Contractor Inc | massage parlor tenant improvementDetails
massage parlor tenant improvement | $50,000 |
| Apr 10, 2026 | Completed final sign-off Jun 2026 | 712 Sansome St | U S Prime Contractor Inc | seismic alteration and removal of existing mezzanine the building is vacant, accessiblity under ab-017.Details
seismic alteration and removal of existing mezzanine the building is vacant, accessiblity under ab-017. | $60,000 |
| Jan 17, 2026 | In progress filed Jan 2026, not yet issued | 572 San Jose Av | rear addition to an existing 2 story, 2 family dweling. interior renovations including new kitchen and bathrooms.Details
rear addition to an existing 2 story, 2 family dweling. interior renovations including new kitchen and bathrooms. | $100,000 | |
| Oct 9, 2025 | In progress issued Oct 2025 | 1906 Folsom St | Pineda Construction Inc | revision to pa# 202508153179: structural only - structural details for soft story retrofit.Details
revision to pa# 202508153179: structural only - structural details for soft story retrofit. | |
| Sep 2, 2025 | In progress issued Nov 2025 | 779 Carolina St | Filshie Construction | install new family room 1st fl. install new bathroom 1st fl. new deck 2nd floor. new spral stair to new roof deck. 2nd fl kitchen and bath remodel under 202507241484.Details
install new family room 1st fl. install new bathroom 1st fl. new deck 2nd floor. new spral stair to new roof deck. 2nd fl kitchen and bath remodel under 202507241484. | $150,000 |
| Jul 7, 2025 | Completed final sign-off Aug 2025 | 2256 Market St | U S Prime Contractor Inc | detail change per approved application 2025-0508-6087 & 2025-0508-6089. commercial space is vacant, accessibility under ab-017.Details
detail change per approved application 2025-0508-6087 & 2025-0508-6089. commercial space is vacant, accessibility under ab-017. | |
| Feb 18, 2025 | In progress filed Feb 2025, not yet issued | 24 Buena Vista Tr | widening two (e) garage door openingsDetails
widening two (e) garage door openings | $30,000 | |
| Aug 20, 2024 | Completed final sign-off Nov 2024 | 1411 Mason St | U S Prime Contractor Inc | voluntary concrete wall to support deteriorated floor joists and stud wall and protect against water infiltration at south/west side of basement.Details
voluntary concrete wall to support deteriorated floor joists and stud wall and protect against water infiltration at south/west side of basement. | $30,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 20 San Antonio Pl | U S Prime Contractor Inc | repair work per nov# 202417877; repair cracks on concrete wall in the basement repair wall in the basement adding plywood and new stucco, remove and replace four basement exterior steel columns which are corrected with new steel colums add pad ftgs uner the new postsDetails
repair work per nov# 202417877; repair cracks on concrete wall in the basement repair wall in the basement adding plywood and new stucco, remove and replace four basement exterior steel columns which are corrected with new steel colums add pad ftgs uner the new posts | $30,000 |
| Jul 8, 2024 | Completed final sign-off Dec 2025 | 1500 Franklin St | U S Prime Contractor Inc | side walk repairDetails
side walk repair | $50,000 |
| Jun 20, 2024 | Completed final sign-off Apr 2025 | 969 Valencia St | U S Prime Contractor Inc | seismic retrofit to entire building.Details
seismic retrofit to entire building. | $80,000 |
| Apr 8, 2024 | Completed final sign-off Feb 2026 | 645 Congo St | Steelcore Builders Inc | add (n) 6 soldier piles with wood lagging at north side elevation.Details
add (n) 6 soldier piles with wood lagging at north side elevation. | $160,000 |
| Mar 28, 2024 | In progress filed Mar 2024, not yet issued | 105 Lakeview Av | front building: rehab (e) kitchen, bathroom & bedrooms, install utility closet below front stairs. rehab front & rear stairs. replace entry doors on g/f to 107 to single entry door.Details
front building: rehab (e) kitchen, bathroom & bedrooms, install utility closet below front stairs. rehab front & rear stairs. replace entry doors on g/f to 107 to single entry door. | $80,000 | |
| Mar 14, 2024 | Completed final sign-off Jan 2025 | 786 Geary St | U S Prime Contractor Inc | concrete repair at rear(north) elevation.Details
concrete repair at rear(north) elevation. | $10,000 |
| Jan 8, 2024 | Completed final sign-off Sep 2024 | 1080 Francisco St | U S Prime Contractor Inc | voluntary seismic upgrade at the garage level.Details
voluntary seismic upgrade at the garage level. | $119,000 |
| Sep 19, 2023 | Completed final sign-off Apr 2024 | 737 Pine St | U S Prime Contractor Inc | concrete repair of slab & beams @ lower garage ceiling, form 8 to form 3 conversion, p. chan reviewed/commented at counter, dmj 10/13/2023;Details
concrete repair of slab & beams @ lower garage ceiling, form 8 to form 3 conversion, p. chan reviewed/commented at counter, dmj 10/13/2023; | $50,000 |
| Sep 19, 2023 | Completed final sign-off Feb 2024 | 1585 Waller St | U S Prime Contractor Inc | revision to permit 202301311070. detail change to voluntary structural work in the crawl space strengthening the existing foundation.Details
revision to permit 202301311070. detail change to voluntary structural work in the crawl space strengthening the existing foundation. | |
| Sep 19, 2023 | Completed final sign-off Dec 2023 | 2355 Leavenworth St | U S Prime Contractor Inc | install new ledger to existing retaining wall to hold deck joists. repair concrete spalling of existing retaining wall at upper garage level.Details
install new ledger to existing retaining wall to hold deck joists. repair concrete spalling of existing retaining wall at upper garage level. | $15,000 |
| Jul 28, 2023 | Never finaled issued Aug 2023, no final | 1466 Waller St | Matthew P Leffers | replacement of 5 interior posts & footings.Details
replacement of 5 interior posts & footings. | $8,000 |
| Jun 23, 2023 | Completed final sign-off Nov 2023 | 105 Lakeview Av | U S Prime Contractor Inc | revision to pa# 202303163824, new foundation along gl 1.Details
revision to pa# 202303163824, new foundation along gl 1. | |
| Jun 5, 2023 | Completed final sign-off Oct 2023 | 2355 Leavenworth St | U S Prime Contractor Inc | voluntary seismic work to correct vertical discontinuity in the rear section of non-ductile concrete building.Details
voluntary seismic work to correct vertical discontinuity in the rear section of non-ductile concrete building. | $60,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 1541 Grant Av | U S Prime Contractor Inc | units 1541 & 1543: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (commercial)Details
units 1541 & 1543: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (commercial) | $25,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 1539 Grant Av | U S Prime Contractor Inc | units: 1539, 1545a & 1545: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (residential)Details
units: 1539, 1545a & 1545: mandatory soft story seismic retrofit per sfbc 2013 ord 66-13 (residential) | $75,000 |
| Mar 16, 2023 | Completed final sign-off Nov 2023 | 105 Lakeview Av | U S Prime Contractor Inc | voluntary seismic retrofit. strengthen (e) beam at 2nd floor framing. remove and replace 2 post at 1st floorDetails
voluntary seismic retrofit. strengthen (e) beam at 2nd floor framing. remove and replace 2 post at 1st floor | $25,000 |
| Jan 31, 2023 | Completed final sign-off Feb 2024 | 1585 Waller St | U S Prime Contractor Inc | work in the partial basement and crawl space strenghtening the existing foundation. building repair per kpff reportDetails
work in the partial basement and crawl space strenghtening the existing foundation. building repair per kpff report | $40,000 |
| Dec 28, 2022 | Completed final sign-off Jul 2023 | 1130 Larkin St | U S Prime Contractor Inc | concrete repair on rear facade, north and south facade.Details
concrete repair on rear facade, north and south facade. | $20,000 |
| Nov 15, 2022 | Completed final sign-off Feb 2023 | 216 04th Av | U S Prime Contractor Inc | detail changes to approved pa# 202203230650Details
detail changes to approved pa# 202203230650 | |
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 1300 26th Av | U S Prime Contractor Inc | detail change to approved pa# 2022-0601-5349.Details
detail change to approved pa# 2022-0601-5349. | |
| Aug 26, 2022 | Completed final sign-off Oct 2022 | 3430 Geary Bl | U S Prime Contractor Inc | restroom dimension detail changes to approved bpa 202206015353Details
restroom dimension detail changes to approved bpa 202206015353 | |
| Jun 30, 2022 | Never finaled issued Jul 2022, no final | 1466 Waller St | Matthew P Leffers | structural strengthening @ ground floor residential apartmentsDetails
structural strengthening @ ground floor residential apartments | $20,000 |
| Jun 15, 2022 | Completed final sign-off Oct 2022 | 2618 26th Av | U S Prime Contractor Inc | bay window strengthening in front section of the building.Details
bay window strengthening in front section of the building. | $10,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 3430 Geary Bl | U S Prime Contractor Inc | ti work for massage space. no plumbing & mechanical work.Details
ti work for massage space. no plumbing & mechanical work. | $5,000 |
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 1300 26th Av | U S Prime Contractor Inc | repair 9 columns in the garage areaDetails
repair 9 columns in the garage area | $36,000 |
| Mar 23, 2022 | Completed final sign-off Feb 2023 | 216 04th Av | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2019, ordinance 96-13 spft story retrofit per chapter 4d 2016 cebc, appendix a-4Details
mandatory soft story seismic retrofit per sfbc 2019, ordinance 96-13 spft story retrofit per chapter 4d 2016 cebc, appendix a-4 | $153,000 |
| Mar 11, 2022 | Completed final sign-off May 2022 | 2345 Polk St | U S Prime Contractor Inc | bay windows volunteery strengthening in rear section of buildingDetails
bay windows volunteery strengthening in rear section of building | $69,000 |
| Mar 11, 2022 | Completed final sign-off May 2022 | 250 Fell St | U S Prime Contractor Inc | unit 24: repair of (1) columnDetails
unit 24: repair of (1) column | $5,000 |
| Nov 23, 2021 | Completed final sign-off Jun 2022 | 1649 Market St | U S Prime Contractor Inc | detail changes to approved permit 2021 0929 9438Details
detail changes to approved permit 2021 0929 9438 | |
| Nov 17, 2021 | Expired or cancelled expired Jun 2025 | 731 Noe St | Macken Construction | foundation replacement to comply with nov 2021184279.Details
foundation replacement to comply with nov 2021184279. | $15,000 |
| Oct 28, 2021 | Completed final sign-off Apr 2023 | 101 Quintara St | M Rivera Construction Inc. | kitchen remodel, partial removal of non bearing wall. no touch of fixturesDetails
kitchen remodel, partial removal of non bearing wall. no touch of fixtures | $3,000 |
| Sep 29, 2021 | Completed final sign-off Jun 2022 | 1649 Market St | U S Prime Contractor Inc | umb building seismic retrofitting, full compliance, special procedureDetails
umb building seismic retrofitting, full compliance, special procedure | $350,000 |
| Jul 23, 2021 | Never finaled filed Jul 2021, never issued | 1369 Hyde St | add 16 adus per ordinance 162-16 at first and second floor levels and storage areas within the existing bldg envelope. (e) bldg is (71) residential dwelling units (13) guest rooms and 5 unwarrented units. (e) unit a legalization under separate permit.Details
add 16 adus per ordinance 162-16 at first and second floor levels and storage areas within the existing bldg envelope. (e) bldg is (71) residential dwelling units (13) guest rooms and 5 unwarrented units. (e) unit a legalization under separate permit. | $950,000 | |
| May 18, 2021 | Completed final sign-off Jul 2022 | 24 Jasper Pl | revision to previous approved app# 201807114238. install additional supports for the new adu unit.Details
revision to previous approved app# 201807114238. install additional supports for the new adu unit. | $5,000 | |
| May 11, 2021 | Completed final sign-off Oct 2021 | 1106 Valencia St | U S Prime Contractor Inc | (residential) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017.Details
(residential) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017. | $105,000 |
| May 11, 2021 | Completed final sign-off Oct 2021 | 1102 Valencia St | U S Prime Contractor Inc | (commercial) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017.Details
(commercial) voluntary soft story retrofit per sfbc 209, ord. 66-13. 2019 cebc, appendix a-4. commercial spaces are vacant, accessibility under ab-017. | |
| Dec 2, 2020 | Completed final sign-off Mar 2021 | 205 16th Av | garage and balconies structural repair.Details
garage and balconies structural repair. | $10,000 | |
| Oct 7, 2020 | Completed final sign-off Mar 2021 | 956 Valencia St | U S Prime Contractor Inc | soft story revision to pa# 202002255308. ada accessibility under pa# 202002255310.Details
soft story revision to pa# 202002255308. ada accessibility under pa# 202002255310. | |
| Sep 17, 2020 | Completed final sign-off Jun 2022 | 1388 California St | U S Prime Contractor Inc | revision to 201501307116. detail changeDetails
revision to 201501307116. detail change | |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 160 Portola Dr | U S Prime Contractor Inc | install (2) columns & footings to reinforce (e) columnsDetails
install (2) columns & footings to reinforce (e) columns | $10,000 |
| Sep 10, 2020 | Never finaled filed Sep 2020, never issued | 947 Page St | add 3 adu's at g/f per oridinance 162-16. soft story under separate permit. unit legalization under seperate permit.Details
add 3 adu's at g/f per oridinance 162-16. soft story under separate permit. unit legalization under seperate permit. | $150,000 | |
| Jun 12, 2020 | Never finaled issued Aug 2020, no final | 2226 Divisadero St | U S Prime Contractor Inc | revison-detail change to approved application 2020/0108/1440. relocation of front and middle steel frames. revision of steel frame attachment to structure. revision of collector details. revision of simpson shear wall to traditional shear wall with hdus.Details
revison-detail change to approved application 2020/0108/1440. relocation of front and middle steel frames. revision of steel frame attachment to structure. revision of collector details. revision of simpson shear wall to traditional shear wall with hdus. | |
| Feb 27, 2020 | Completed final sign-off Oct 2022 | 815 Mason St | U S Prime Contractor Inc | voluntary seismic retrofit.Details
voluntary seismic retrofit. | $52,000 |
| Feb 25, 2020 | Completed final sign-off May 2022 | 947 Page St | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2016 chapter 4d, ordiance 66-13. 2016 cebc appendix a-4. - adu for future on separate permitDetails
mandatory soft story seismic retrofit per sfbc 2016 chapter 4d, ordiance 66-13. 2016 cebc appendix a-4. - adu for future on separate permit | $67,500 |
| Feb 25, 2020 | Expired or cancelled cancelled Jan 2026 | 1801 15th St | structural alteration for futrue adu per application # 2016-1104-2019.Details
structural alteration for futrue adu per application # 2016-1104-2019. | $40,000 | |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 2160 Van Ness Av | U S Prime Contractor Inc | revision to pa #2018-0829-8622: detail change to approved plans, mandatory soft story. review shear wall line 3.6 between "d" & "e"Details
revision to pa #2018-0829-8622: detail change to approved plans, mandatory soft story. review shear wall line 3.6 between "d" & "e" | |
| Jan 29, 2020 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | revision to pa # 2019-1118-7574: detail change to mandatory soft storyDetails
revision to pa # 2019-1118-7574: detail change to mandatory soft story | |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 246 Powell St | U S Prime Contractor Inc | structural detail for ti workDetails
structural detail for ti work | $3,000 |
| Dec 5, 2019 | Completed final sign-off Feb 2020 | 2280 Pine St | J. Ho Construction Inc | apt 204: rev to 201908209284 & 201910154409: structural work due to removal of load bearing wall. maher n/a.Details
apt 204: rev to 201908209284 & 201910154409: structural work due to removal of load bearing wall. maher n/a. | |
| Dec 4, 2019 | Completed final sign-off Sep 2020 | 550 Buchanan St | U S Prime Contractor Inc | detail change to approved application 201911066639Details
detail change to approved application 201911066639 | |
| Nov 4, 2019 | Completed final sign-off Dec 2019 | 2514 Polk St | U S Prime Contractor Inc | revision to pa 2019-0508-0119 (soft story) detail changeDetails
revision to pa 2019-0508-0119 (soft story) detail change | |
| Nov 4, 2019 | Completed final sign-off Jul 2020 | 1618 Polk St | U S Prime Contractor Inc | revision to pa 2019-0618-3732 (soft story) detail changeDetails
revision to pa 2019-0618-3732 (soft story) detail change | |
| Nov 4, 2019 | Completed final sign-off Jan 2020 | 2145 Franklin St | U S Prime Contractor Inc | detail change to approved application 2019-0424-8791Details
detail change to approved application 2019-0424-8791 | |
| Nov 4, 2019 | Expired or cancelled expired Oct 2022 | 1670 Chestnut St | Siniora Construction | detail change to approved app 201910104124 new steel frame #2Details
detail change to approved app 201910104124 new steel frame #2 | |
| Nov 4, 2019 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | structural detail change to approved app 201908169053Details
structural detail change to approved app 201908169053 | |
| Oct 10, 2019 | Expired or cancelled expired Oct 2022 | 1670 Chestnut St | mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
mandatory soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $8,000 | |
| Oct 9, 2019 | Completed final sign-off Aug 2021 | 1801 15th St | K Seismic Inc | mandatory soft story retrofit per sfbc 2016. ord 66-13. 2016 cebc appendix a4Details
mandatory soft story retrofit per sfbc 2016. ord 66-13. 2016 cebc appendix a4 | $58,000 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 554 Broadway | U S Prime Contractor Inc | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commecial soft story pa #201909272929) maher naDetails
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commecial soft story pa #201909272929) maher na | $66,000 |
| Sep 27, 2019 | Never finaled issued Oct 2019, no final | 548 Broadway | U S Prime Contractor Inc | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential soft story pa #201909272927) maher naDetails
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (residential soft story pa #201909272927) maher na | $33,000 |
| Sep 26, 2019 | Completed final sign-off Jun 2020 | 118 Steiner St | U S Prime Contractor Inc | revision to pa #201708023624. detail change to approved soft story permit. replace siding on germania st (partial ground floor)Details
revision to pa #201708023624. detail change to approved soft story permit. replace siding on germania st (partial ground floor) | |
| Sep 11, 2019 | Never finaled issued Sep 2019, no final | 1134 Jackson St | soft story retrofit per sfebc, chapter 4d, 2016 cebc appendix a-4. soft story revision detail 201708296318Details
soft story retrofit per sfebc, chapter 4d, 2016 cebc appendix a-4. soft story revision detail 201708296318 | ||
| Aug 26, 2019 | Completed final sign-off Aug 2019 | 1600 Haight St | U S Prime Contractor Inc | detail change to approved plan #201803284800. relocation of automatic door opener.Details
detail change to approved plan #201803284800. relocation of automatic door opener. | |
| Aug 23, 2019 | Completed final sign-off Jan 2020 | 2145 Franklin St | U S Prime Contractor Inc | install new garage door in (e) opening. no change to the opening size. (n) door to match (e) neighboring door. automatic door moedl #24.Details
install new garage door in (e) opening. no change to the opening size. (n) door to match (e) neighboring door. automatic door moedl #24. | $5,000 |
| Aug 16, 2019 | Completed final sign-off Apr 2020 | 1878 Market St | U S Prime Contractor Inc | mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 residentialDetails
mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 residential | $81,000 |
| Aug 16, 2019 | Completed final sign-off Apr 2020 | 1874 Market St | U S Prime Contractor Inc | mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 commercialDetails
mandatory soft story retrofit per sfbc 2016 ord 66-13 2016 ecbe appx a4 commercial | $27,000 |
| Jul 22, 2019 | Completed final sign-off Dec 2019 | 900 Broderick St | U S Prime Contractor Inc | detail change to approved app 201904107569 add reference to foundation for shear wall on plans s-2.1Details
detail change to approved app 201904107569 add reference to foundation for shear wall on plans s-2.1 | |
| Jul 17, 2019 | Completed final sign-off Nov 2019 | 2635 Mcallister St | U S Prime Contractor Inc | revision to pa 201805250160. revision to steel framesDetails
revision to pa 201805250160. revision to steel frames | |
| Jun 20, 2019 | Completed final sign-off Aug 2020 | 2849 California St | U S Prime Contractor Inc | new foundation , columns, beam epair, e rotten wood columns at driveway lvel and shearwalls relocation in apt. detail change to 201809140282Details
new foundation , columns, beam epair, e rotten wood columns at driveway lvel and shearwalls relocation in apt. detail change to 201809140282 | $5,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2020 | 1550 Howard St | U S Prime Contractor Inc | detail change to approved pa 2019-0408-7418 (commercial soft story)Details
detail change to approved pa 2019-0408-7418 (commercial soft story) | |
| Jun 18, 2019 | Completed final sign-off Aug 2019 | 499 Walnut St | U S Prime Contractor Inc | detail change to approved application #201903266210. (soft story)Details
detail change to approved application #201903266210. (soft story) | |
| Jun 18, 2019 | Completed final sign-off Jul 2020 | 1618 Polk St | U S Prime Contractor Inc | detail change to pa 2019-0328-6570 (residential soft story)Details
detail change to pa 2019-0328-6570 (residential soft story) | |
| Jun 18, 2019 | Completed final sign-off Oct 2019 | 270 26th Av | U S Prime Contractor Inc | detail change to approved application #201906032322 (soft story)Details
detail change to approved application #201906032322 (soft story) | |
| Jun 6, 2019 | Completed final sign-off Dec 2019 | 627 Capp St | U S Prime Contractor Inc | detail change to approved app#201708154849. n/a for maherDetails
detail change to approved app#201708154849. n/a for maher | |
| Jun 6, 2019 | Completed final sign-off Jul 2019 | 2345 Polk St | U S Prime Contractor Inc | detail change to approved app#201903145227. n/a for maherDetails
detail change to approved app#201903145227. n/a for maher | |
| May 9, 2019 | Completed final sign-off Jun 2019 | 674 Corbett Av | U S Prime Contractor Inc | detail change to pa 2017-0706-1174 (soft story)Details
detail change to pa 2017-0706-1174 (soft story) | |
| May 8, 2019 | Completed final sign-off Aug 2019 | 1279 Green St | U S Prime Contractor Inc | detail change to approved app#201808298619.soft story retrofit per sfebc chapter 4d per sfbc . 2016 cebc appendix a-4Details
detail change to approved app#201808298619.soft story retrofit per sfebc chapter 4d per sfbc . 2016 cebc appendix a-4 | |
| May 8, 2019 | Completed final sign-off Dec 2019 | 2514 Polk St | U S Prime Contractor Inc | soft story retrofit per sfebc chapter 4d per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4 | $57,000 |
| May 8, 2019 | Completed final sign-off Oct 2019 | 270 26th Av | U S Prime Contractor Inc | revision to app#201705106202 for removal of plywood sheatwall and rear wall line d.soft story retrofit per sfebc chapter 4d per sfbc 2016 cebc appendix a-4Details
revision to app#201705106202 for removal of plywood sheatwall and rear wall line d.soft story retrofit per sfebc chapter 4d per sfbc 2016 cebc appendix a-4 | |
| Apr 25, 2019 | Completed final sign-off Jun 2019 | 674 Corbett Av | U S Prime Contractor Inc | detail change to approved pa#201707061174Details
detail change to approved pa#201707061174 | |
| Apr 24, 2019 | Completed final sign-off Jan 2020 | 2145 Franklin St | U S Prime Contractor Inc | detail change to approved application 2018-0717-4784Details
detail change to approved application 2018-0717-4784 | |
| Apr 10, 2019 | Completed final sign-off Oct 2020 | 500 04th St | K Seismic Inc | residential- mandatory soft story seismic retrofit per sfbc 2016 ord 66-13, 2016 cefc appz a4 commercial permit -201904107581Details
residential- mandatory soft story seismic retrofit per sfbc 2016 ord 66-13, 2016 cefc appz a4 commercial permit -201904107581 | $54,000 |
| Apr 10, 2019 | Completed final sign-off Oct 2020 | 500 04th St | K Seismic Inc | commercial - mandatory soft story seismic retrofit per sfbc 2016 ord 66-13, 2016 cefc appz a4 residential permit - 201904107582Details
commercial - mandatory soft story seismic retrofit per sfbc 2016 ord 66-13, 2016 cefc appz a4 residential permit - 201904107582 | $18,000 |
| Apr 10, 2019 | Completed final sign-off Dec 2019 | 900 Broderick St | U S Prime Contractor Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Apr 8, 2019 | Completed final sign-off Oct 2019 | 4030 19th St | U S Prime Contractor Inc | mandatory soft story seismic retrofit per sfbc 2016 ordinance 66-13 2016 cebc appendix a-4Details
mandatory soft story seismic retrofit per sfbc 2016 ordinance 66-13 2016 cebc appendix a-4 | $143,000 |
| Mar 28, 2019 | Completed final sign-off Jul 2020 | 1618 Polk St | residential - soft story retrofit per sfebc 2013 ordinance 66-13 chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201803507. commercial soft story under pa 201903286572Details
residential - soft story retrofit per sfebc 2013 ordinance 66-13 chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201803507. commercial soft story under pa 201903286572 | $122,000 | |
| Mar 26, 2019 | Completed final sign-off Aug 2019 | 499 Walnut St | U S Prime Contractor Inc | detail change to approved soft story application 2017-1121-4525Details
detail change to approved soft story application 2017-1121-4525 | |
| Mar 14, 2019 | Completed final sign-off Jul 2019 | 2345 Polk St | U S Prime Contractor Inc | detail change to approved soft story application #201809119679Details
detail change to approved soft story application #201809119679 | |
| Feb 13, 2019 | Completed final sign-off Oct 2019 | 2032 Mission St | K Seismic Inc | commercial: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4.Details
commercial: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4. | $16,000 |
| Feb 13, 2019 | Completed final sign-off Oct 2019 | 2032 Mission St | K Seismic Inc | residential: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4.Details
residential: mandatory soft-story seismic retroifit per sfbc 2016 ordinance 66-13. 2016 cebc appendix a-4. | $48,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 1483 Haight St | U S Prime Contractor Inc | detail change to approved app#201811085418. removal of drag strut in basementDetails
detail change to approved app#201811085418. removal of drag strut in basement | |
| Jan 9, 2019 | Completed final sign-off Jun 2019 | 1555 Powell St | U S Prime Contractor Inc | detail change to approved pa 2018-0912-9855 (residential soft story)Details
detail change to approved pa 2018-0912-9855 (residential soft story) |