Mark Cruz
- Listed as
- architect, authorized agent-others, designer
- Firm
- Cruz Architecture & Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Dec 2025
36 permits since 2000 (architect on 31 permits, authorized agent-others on 4 permits, designer on 1 permit): 14 completed, 3 in progress, 11 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1911 20th St | Cht Properties Development | revision to pa 201806182159 field changes: change rear stairs to spiral stairs, changes to floor plan to accommodate elevatorDetails
revision to pa 201806182159 field changes: change rear stairs to spiral stairs, changes to floor plan to accommodate elevator | $15,000 |
| Mar 25, 2024 | In progress issued Apr 2024 | 164 Lake Merced Hill St South St | Terence Mcmahon Construction | interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow.Details
interior only non structural remodel at 1st level only. addition of home office/gym, bathroom and patio furniture storage area. new interior doors, fixtures, finishes, venting. relocation of washer dryer, new window replacement at rear. no work at front facade. no work in prow. | $20,000 |
| Jul 18, 2023 | Completed final sign-off Jan 2025 | 4 Ashbury Tr | Terence Mcmahon Construction | int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis.Details
int improvement. kitchen/bath remodel. new flooring/windows (not street visible) of existing. 2nd&3rd fl reconfiguration mep, struct, reinforcement @ basement lv. no excavation, no change to ext envelope, no facade work, no work in prow. (n) wdw on side, not street vis. | $289,103 |
| May 18, 2023 | Completed final sign-off Jan 2024 | 1275 45th Av | Pineda Construction Inc | units 1279/1281/1283: renovation of (3) (e) ground floor studio apartments, new fire separations, finishes, appliances, lighting. to comply with bid nov #202307121 dated 4/27/2023Details
units 1279/1281/1283: renovation of (3) (e) ground floor studio apartments, new fire separations, finishes, appliances, lighting. to comply with bid nov #202307121 dated 4/27/2023 | $90,000 |
| Nov 30, 2022 | Expired or cancelled withdrawn Dec 2022 | 65 Henry St | revision to pa#202010166621:new furnace location under stiars, new 12x24" fixed glazing at master shower (tempered, enclosure of a 60 sf deck (no reduction of useable outdoor space). removal of window at upstairs lounge, nw exterior wall to enclose the deck aligned to the prop.line, new 72" gasDetails
revision to pa#202010166621:new furnace location under stiars, new 12x24" fixed glazing at master shower (tempered, enclosure of a 60 sf deck (no reduction of useable outdoor space). removal of window at upstairs lounge, nw exterior wall to enclose the deck aligned to the prop.line, new 72" gas | $12,000 | |
| Jun 6, 2022 | In progress issued Oct 2024 | 958 Wisconsin St | Dore Const. Of Calif. Inc. | 1. new wood frame deck[225sf] 2. new 42" guardrail at rear wall 3. new fire rated lot line wall.Details
1. new wood frame deck[225sf] 2. new 42" guardrail at rear wall 3. new fire rated lot line wall. | $30,000 |
| Feb 9, 2022 | Never finaled issued Apr 2022, no final | 760 Elizabeth St | Ronan O'dea Inc Dba O'dea Ronan Inc | basement: remodel to add guest bedroom, laundry room, bathroom and office. 1/f: kitchen and dining room remodel, new staircase to basement. 2/f: bathroom remodel.Details
basement: remodel to add guest bedroom, laundry room, bathroom and office. 1/f: kitchen and dining room remodel, new staircase to basement. 2/f: bathroom remodel. | $260,000 |
| Dec 6, 2021 | Completed final sign-off Oct 2023 | 215 Panorama Dr | Sf2 Construction Inc | revision to p.a.#202102124568 replacement of wooden decor wihr stucco, all windows replacement. replace of entry door, wood rainscreen installation exterior. painting.Details
revision to p.a.#202102124568 replacement of wooden decor wihr stucco, all windows replacement. replace of entry door, wood rainscreen installation exterior. painting. | $25,000 |
| Nov 22, 2021 | Completed final sign-off Sep 2022 | 3490 20th St | Stokely Marcus Construction Inc | revision to pa 2016-0412-4497 revised interior configuration per plan.Details
revision to pa 2016-0412-4497 revised interior configuration per plan. | |
| Nov 17, 2021 | Never finaled filed Nov 2021, never issued | 45 Valley St | horizontal 2-story addition in rear yard (160 sf), interior stairs. no work to front of building.Details
horizontal 2-story addition in rear yard (160 sf), interior stairs. no work to front of building. | $900,000 | |
| Feb 12, 2021 | Completed final sign-off Oct 2023 | 215 Panorama Dr | Sf2 Construction Inc | reduce garage on ground floor and add a master suite. change location of stairs landing to basement. remodel basement by adding 1 bedroom & 1 bathroom. replace windows. all front facade work removed per the revision - please note 2020 google photo shows wood horizontal siding existing not to be remoDetails
reduce garage on ground floor and add a master suite. change location of stairs landing to basement. remodel basement by adding 1 bedroom & 1 bathroom. replace windows. all front facade work removed per the revision - please note 2020 google photo shows wood horizontal siding existing not to be remo | $45,000 |
| Jan 25, 2021 | Completed final sign-off Apr 2021 | 3747 Divisadero St | Excelsior Building Group | to comply with nov201919321: provide (e) plans and proposed ith structural drawings and calcs.Details
to comply with nov201919321: provide (e) plans and proposed ith structural drawings and calcs. | $14,000 |
| Dec 10, 2020 | Completed final sign-off Apr 2022 | 899 Columbus Av | Keith Them Wong | tenant improvement. conditional use application. minor upgrades to finishes and fixtures. upgrade accessible restroom.Details
tenant improvement. conditional use application. minor upgrades to finishes and fixtures. upgrade accessible restroom. | $50,000 |
| Dec 9, 2020 | Never finaled filed Dec 2020, never issued | 3512 21st St | encroachment into the front right way, to widen entry steps, landing & front of building by 32"Details
encroachment into the front right way, to widen entry steps, landing & front of building by 32" | $35,000 | |
| Oct 6, 2020 | Expired or cancelled withdrawn Feb 2021 | 1014 Shotwell St | Occidental Express | addition of kitchen in the lower flr to create a 2nd separate unit from upper level.Details
addition of kitchen in the lower flr to create a 2nd separate unit from upper level. | $28,000 |
| Aug 28, 2020 | Never finaled filed Aug 2020, never issued | 1398 Marin St | change of use permit for existing 963 sq ft tenant office on 2nd floor. business (group b) provides cannabis distribution (no consumption or cultivation) and office use.Details
change of use permit for existing 963 sq ft tenant office on 2nd floor. business (group b) provides cannabis distribution (no consumption or cultivation) and office use. | ||
| Aug 21, 2020 | Expired or cancelled withdrawn Sep 2021 | 132 Clipper St | 132-134-134a clipper st: new exterior 3-story stair to provide second egress to 132 & 134 clipper street (upper units).Details
132-134-134a clipper st: new exterior 3-story stair to provide second egress to 132 & 134 clipper street (upper units). | $12,000 | |
| Nov 15, 2019 | Never finaled filed Nov 2019, never issued | 1362 38th Av | Gf Golden Foundation Co. | addition of adu per ord# 95-17 w/ 2 bedrooms & 1 bath. addition of (n) foyer to create separate entrance. addition of (n) deck & stairs to provide back yard access to upper unit. replacement of back door in lower unit to comply w/ code.Details
addition of adu per ord# 95-17 w/ 2 bedrooms & 1 bath. addition of (n) foyer to create separate entrance. addition of (n) deck & stairs to provide back yard access to upper unit. replacement of back door in lower unit to comply w/ code. | $15,000 |
| Sep 6, 2019 | Never finaled issued Oct 2019, no final | 2043 Fillmore St | Cookline Construction Inc | for dept of health review only due to omitted routing for pa 201811307113. no work conducted under this permit. maher n/a.Details
for dept of health review only due to omitted routing for pa 201811307113. no work conducted under this permit. maher n/a. | |
| Jul 16, 2019 | Expired or cancelled withdrawn Jan 2026 | 1769 Grove St | demo of (e) 2nd flr deck. proposed (n) larger deck at level 2 w/ stair to yard below. no (n) habitable square footage.Details
demo of (e) 2nd flr deck. proposed (n) larger deck at level 2 w/ stair to yard below. no (n) habitable square footage. | $20,000 | |
| Jul 16, 2019 | Expired or cancelled withdrawn Jan 2026 | 1767 Grove St | (n) deck at level 3 w/ (n) door to deck from rear bedrooms. no (n) habitable square footage.Details
(n) deck at level 3 w/ (n) door to deck from rear bedrooms. no (n) habitable square footage. | $10,000 | |
| Jun 12, 2019 | Completed final sign-off Sep 2022 | 3490 20th St | Stokely Marcus Construction Inc | t.i. for 985 sq ft, no structural for (e) health services. new finishes. ada restroom.Details
t.i. for 985 sq ft, no structural for (e) health services. new finishes. ada restroom. | $30,000 |
| Mar 25, 2019 | Completed final sign-off Sep 2019 | 2043 Fillmore St | Cookline Construction Inc | revision to pa 2018-1130-7113 mezzanine layout. elimination of partition wall & dry closet expansionDetails
revision to pa 2018-1130-7113 mezzanine layout. elimination of partition wall & dry closet expansion | $15,000 |
| Feb 25, 2019 | Completed final sign-off May 2021 | 3747 Divisadero St | Kyle Pennington | comply with nov 2018016621: remove wood fencing from e 4x4 fence post and replace with 1x4 clear cedar plank running horizontaly. complaint #201919321Details
comply with nov 2018016621: remove wood fencing from e 4x4 fence post and replace with 1x4 clear cedar plank running horizontaly. complaint #201919321 | $5,000 |
| Nov 30, 2018 | Never finaled issued Jan 2019, no final | 2043 Fillmore St | Professional Contracting Inc | restaurant tenant improvement, light cosmetic & finish changes, minor electrical outlet relocation, no change to kitchen.Details
restaurant tenant improvement, light cosmetic & finish changes, minor electrical outlet relocation, no change to kitchen. | $150,000 |
| Jun 18, 2018 | Never finaled issued Dec 2022, no final | 1911 20th St | Shamrock Engineering Concrete, Cht Properties Development | 2-story vertical addition; additon of 1 unit and an 1 adu; sprinkler nfpa13 throughoutDetails
2-story vertical addition; additon of 1 unit and an 1 adu; sprinkler nfpa13 throughout | $500,000 |
| Jun 8, 2018 | Completed final sign-off Jun 2019 | 76 Museum Wy | Mc Gibbon Construction | roof deck on (e) roof. steel guard to be compliant with bird safe steel.Details
roof deck on (e) roof. steel guard to be compliant with bird safe steel. | $20,000 |
| Apr 12, 2018 | Never finaled filed Apr 2018, never issued | 116 10th Av | seismic upgrade. renovation of attic, renovation of (e) kitchen & (e) bathrooms, addition of interior stairs, 2 shed dormers, new windows.Details
seismic upgrade. renovation of attic, renovation of (e) kitchen & (e) bathrooms, addition of interior stairs, 2 shed dormers, new windows. | $225,000 | |
| Mar 1, 2018 | Never finaled issued Nov 2020, no final | 320 21st Av | Details
| $175,000 | |
| Dec 8, 2017 | Expired or cancelled expired Sep 2023 | 143 Corbett Av | F J Sandoval Co | revision to app#201508275417. retaining wall rebar change.Details
revision to app#201508275417. retaining wall rebar change. | $15,000 |
| Oct 31, 2017 | Expired or cancelled cancelled Jan 2026 | 135 Holladay Av | M F Sanchez Construction & Painting | convert storage and laundry rm into bdrm, bath, and den. ref 201710050555, kitchen remodel maher not reqDetails
convert storage and laundry rm into bdrm, bath, and den. ref 201710050555, kitchen remodel maher not req | $22,000 |
| Aug 9, 2017 | Completed final sign-off Sep 2023 | 143 Corbett Av | F J Sandoval Co | comply with nov #201631352. consolidate all work performed @ interior & exterior. add dwelling unit. legalized revised (e) deck @ upper lvl. (n) roof deck & guardrail. legalize bump out @ rear breakfast nook. variance: breakfast nook bump out, spiral stair @ grade in rear yard.Details
comply with nov #201631352. consolidate all work performed @ interior & exterior. add dwelling unit. legalized revised (e) deck @ upper lvl. (n) roof deck & guardrail. legalize bump out @ rear breakfast nook. variance: breakfast nook bump out, spiral stair @ grade in rear yard. | $150,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2023 | 2959 23rd St | Kohlmyer, Weitekamp Remodeling & Construction | not adu (no adu on project). addition to rear of bldg (no change to front)Details
not adu (no adu on project). addition to rear of bldg (no change to front) | $200,000 |
| May 16, 2017 | Never finaled filed May 2017, never issued | 143 Corbett Av | Details
| $80,000 | |
| Mar 20, 2017 | Completed final sign-off Jul 2018 | 958 Wisconsin St | relocation of e furnace, addition of bathroom, addition of base cabinets. all work at 3rd fl unitDetails
relocation of e furnace, addition of bathroom, addition of base cabinets. all work at 3rd fl unit | $10,500 | |
| Nov 14, 2012 | Expired or cancelled cancelled Jun 2014 | 2241 Chestnut St | addition & renovation of (e) attached structure @ courtyard (rear). no change in use.Details
addition & renovation of (e) attached structure @ courtyard (rear). no change in use. | $175,000 |