Andrew Mironov
- Listed as
- authorized agent-others, contractor
- Firm
- Prime Construction & Renovation Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2017 to Jun 2026
75 permits since 2000 (contractor on 75 permits, authorized agent-others on 2 permits): 58 completed, 10 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 24, 2026 | In progress issued Jun 2026 | 2918 Lyon St | Prime Construction & Renovation Inc. | revision to pa202603197944, reduce scope due to gudget constraints, remove all work at 1st floor. field revision to framing at roof level.Details
revision to pa202603197944, reduce scope due to gudget constraints, remove all work at 1st floor. field revision to framing at roof level. | |
| Apr 24, 2026 | In progress issued May 2026 | 3779 25th St | Prime Construction & Renovation Inc. | the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom.Details
the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom. | $225,000 |
| Apr 6, 2026 | Completed final sign-off Apr 2026 | 1902 Baker St | Prime Construction & Renovation Inc. | to obtain final inspection for work approved under pa# 202412046149, 202408138484, & 242409110560. all work is complete.Details
to obtain final inspection for work approved under pa# 202412046149, 202408138484, & 242409110560. all work is complete. | |
| Mar 19, 2026 | In progress issued Apr 2026 | 2918 Lyon St | Prime Construction & Renovation Inc. | minor remodel 2nd and 3rd floor partial foundation updateDetails
minor remodel 2nd and 3rd floor partial foundation update | $10,000 |
| Feb 6, 2026 | In progress issued Feb 2026 | 76 Sea View Tr | Prime Construction & Renovation Inc. | replace 12 windows at south facing facade with aluminum wood windows. replace dry rot cladding at south facing facade at 2 bay windows in-kind. replace 2 windows at west elevation with aluminum clad wood windows.Details
replace 12 windows at south facing facade with aluminum wood windows. replace dry rot cladding at south facing facade at 2 bay windows in-kind. replace 2 windows at west elevation with aluminum clad wood windows. | $40,000 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 47 Fair Oaks St | Prime Construction & Renovation Inc. | (rear building) dryrot repair at entry. no work visible from street. work consists of replacing dry rotted framing in kind and cedar shaked in kind. approx. 70 sq ft of wall area.Details
(rear building) dryrot repair at entry. no work visible from street. work consists of replacing dry rotted framing in kind and cedar shaked in kind. approx. 70 sq ft of wall area. | $7,500 |
| Dec 2, 2025 | In progress issued Dec 2025 | 1866 Church St | Prime Construction & Renovation Inc. | 2 bathroom remodel. 2 tub to shower conversions. no alteration of wall, window or door.Details
2 bathroom remodel. 2 tub to shower conversions. no alteration of wall, window or door. | $65,000 |
| Dec 2, 2025 | Completed final sign-off May 2026 | 47 Fair Oaks St | Prime Construction & Renovation Inc. | unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door.Details
unit b: remodel 1 bathroom 1 kitchen in kind like for like. no other work under this permit. no alteration of wall, window or door. | $100,000 |
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 3743 20th St | Prime Construction & Renovation Inc. | unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work.Details
unit b upper: paint (e) kitchen cabs, replace countertops, new undermount sink. paint bathroom, replace (e) surface light fixtures in bathr.. refinish floors, paint remainder of unit. all work in-kind, no structural work. | $3,500 |
| Oct 9, 2025 | Completed final sign-off Dec 2025 | 176 Escolta Wy | Prime Construction & Renovation Inc. | replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change.Details
replace kitchen cabinets, and appliances. remove and replace insulation, and sheetrock damaged by moisture in hall and bedrooms. replace knob and tubes electrical. resurface bathroom tiles, new vanity, plumbing fixtures. no layout change. | $100,000 |
| Aug 11, 2025 | Completed final sign-off Apr 2026 | 843 35th Av | Prime Construction & Renovation Inc. | 2nd floor: remodel kitchen in kind. kitchen approx. 130 sq ft. 1st floor: repair water damaged sheet rock. approx 200 sq ft of ceiling and 200 sq ft of walls. all sheet rock to be 5/8" type xDetails
2nd floor: remodel kitchen in kind. kitchen approx. 130 sq ft. 1st floor: repair water damaged sheet rock. approx 200 sq ft of ceiling and 200 sq ft of walls. all sheet rock to be 5/8" type x | $50,000 |
| Jun 24, 2025 | Completed final sign-off Apr 2026 | 3055 Baker St | Prime Construction & Renovation Inc. | 1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor.Details
1) remodel (e) stair on 1st floor. 2) remodel (e) kitchen on 2nd flr. 3) remove wall between kitchen and dining rooms. 4) remove (e)(2) bathrooms on 3rd floor. | $50,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2025 | 48 Retiro Wy | Prime Construction & Renovation Inc. | to comply w/ physical inspection report #cc-8673.Details
to comply w/ physical inspection report #cc-8673. | $500 |
| Mar 27, 2025 | Completed final sign-off Apr 2025 | 160 Swiss Av | Prime Construction & Renovation Inc. | replace drywall & insulation and wetbar cabinets @ family room due to water damage. no layout change or mep workDetails
replace drywall & insulation and wetbar cabinets @ family room due to water damage. no layout change or mep work | $7,000 |
| Mar 3, 2025 | In progress issued Dec 2025 | 109 Pierce St | Prime Construction & Renovation Inc. | to comply with nov 202315373 legalization of installation of a wood pergola on the roof deck without a permit.Details
to comply with nov 202315373 legalization of installation of a wood pergola on the roof deck without a permit. | $800 |
| Feb 19, 2025 | Completed final sign-off Nov 2025 | 142 Elsie St | Prime Construction & Renovation Inc. | new full bath and closet at garage level.no structuralDetails
new full bath and closet at garage level.no structural | $10,000 |
| Dec 10, 2024 | Completed final sign-off Mar 2025 | 3817 22nd St | Prime Construction & Renovation Inc. | kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same openingDetails
kitchen remodel in kind and bathroom remodel with new layout on 3rd floor., replace 2 windows at rear within same opening | $75,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 68 Madrone Av | Prime Construction & Renovation Inc. | replace drywall and insulation located at dining room and upstairs bedroom due to water damage. no change to layout or wall removal or mep workDetails
replace drywall and insulation located at dining room and upstairs bedroom due to water damage. no change to layout or wall removal or mep work | $15,000 |
| Dec 4, 2024 | In progress issued Dec 2024 | 76 Sea View Tr | Prime Construction & Renovation Inc. | dry rot repair at exterior siding north east corner. replace materials in-kind.Details
dry rot repair at exterior siding north east corner. replace materials in-kind. | $15,000 |
| Dec 4, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | Prime Construction & Renovation Inc. | replace 19 windows sashes in kind. all windows to be wood with same operation and details to match exiting windows. 5 viewable from baker st. (west), 12 viewable from south side (sacramento), 2 in the back (not viewable from street).Details
replace 19 windows sashes in kind. all windows to be wood with same operation and details to match exiting windows. 5 viewable from baker st. (west), 12 viewable from south side (sacramento), 2 in the back (not viewable from street). | $30,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 944 Rockdale Dr | Prime Construction & Renovation Inc. | revision to pa 202406104045 update structural framing based on posting frmaing conditions. reconfigure/resize psl beams & joists. remove (e) 3rd fl storage room & expand (e) roof deckDetails
revision to pa 202406104045 update structural framing based on posting frmaing conditions. reconfigure/resize psl beams & joists. remove (e) 3rd fl storage room & expand (e) roof deck | $5,000 |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 14 Costa St | Prime Construction & Renovation Inc. | remodel primary bathroom in kind. move primary bedroom door.Details
remodel primary bathroom in kind. move primary bedroom door. | $45,000 |
| Sep 17, 2024 | Completed final sign-off Mar 2026 | 1902 Baker St | Prime Construction & Renovation Inc. | (e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr ratedDetails
(e) wall between detached garage to be removed. convert (e) 2 garage doors into one within the same opening. install (n) 6ft iron fence at front. add (n) staircase and guardrail inside garage. add new staircase and guardrail inside garage. add 42" height guardrail at front of deck. add 8' 1 hr rated | $50,000 |
| Sep 16, 2024 | Completed final sign-off Apr 2025 | 1517 08th Av | Prime Construction & Renovation Inc. | replace in kind front windows, windows to be wood, operation & divide lights to match existing windows to have doulbe glazing. 6 operable - 14 fixed.Details
replace in kind front windows, windows to be wood, operation & divide lights to match existing windows to have doulbe glazing. 6 operable - 14 fixed. | $15,000 |
| Sep 11, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | Prime Construction & Renovation Inc. | 1st fl. demolish (e) built in closet at bedroom 3, remodel (e) bathroom; 2nf fl. remodel (e) bathroom at den. note: bathroom work not related to pa# 2024-0813-8484.Details
1st fl. demolish (e) built in closet at bedroom 3, remodel (e) bathroom; 2nf fl. remodel (e) bathroom at den. note: bathroom work not related to pa# 2024-0813-8484. | $75,000 |
| Aug 27, 2024 | Completed final sign-off Oct 2024 | 1317 Hyde St | Prime Construction & Renovation Inc. | unit #4: kitchen remodel inkind, replace light fixtures, refinish floor, paint. all work repair in kind; no structural changes.Details
unit #4: kitchen remodel inkind, replace light fixtures, refinish floor, paint. all work repair in kind; no structural changes. | $100,000 |
| Aug 13, 2024 | Expired or cancelled expired Apr 2026 | 1902 Baker St | Prime Construction & Renovation Inc. | remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating.Details
remodel in kind one bathroom and one kitchen. exploratory demo of garage roof deck and roof membrane to determine extents of dryrot damage - 15 sq. ft max- patch/repair exploratory demo area roof membrane and decking in kind and maintain fire rating. | $75,000 |
| Jul 3, 2024 | In progress issued Sep 2024 | 944 Rockdale Dr | Prime Construction & Renovation Inc. | residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required.Details
residential renovation of sfr, rear deck addition-1/fl- interior remodel, (n) bathroom, (n) rear deck and stair to yard. 2/fl- interior remodel, bathroom/kitchen. enlarge deck. replace all (e) windows/doors in kind. structural and seismic upgrade as required. | $192,000 |
| Jul 2, 2024 | Completed final sign-off Mar 2025 | 14 Costa St | Prime Construction & Renovation Inc. | water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street.Details
water damage repair: replace in kind, 2 bathrooms, one kitchen, 1st floor sheetrock. no visible work from street. | $90,000 |
| Jun 4, 2024 | Completed final sign-off Aug 2024 | 1487 Greenwich St | Prime Construction & Renovation Inc. | unit 1, 1st fl - new powder room, existing full bathroom remodelDetails
unit 1, 1st fl - new powder room, existing full bathroom remodel | $10,000 |
| May 1, 2024 | Completed final sign-off Nov 2024 | 62 Idora Av | Prime Construction & Renovation Inc. | new bathroom, new family room. all on ground flr.Details
new bathroom, new family room. all on ground flr. | $20,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2025 | 1517 08th Av | Prime Construction & Renovation Inc. | remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior workDetails
remodel kitchen and 2 baths, new elec/plumb. replace e living room fireplace with tiled enclosure and decorative electric burner. install new doors and millwork in bedroom closets. misc patch, repair, painting of finishes throughout house. no exterior work | $100,000 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 3440 19th St | Prime Construction & Renovation Inc. | 1st fl rear (shop) accessory structure to unit 3440. new half bathroom and closet. not for sleeping purposes.Details
1st fl rear (shop) accessory structure to unit 3440. new half bathroom and closet. not for sleeping purposes. | $30,000 |
| Dec 21, 2023 | Completed final sign-off Aug 2024 | 3438 19th St | Prime Construction & Renovation Inc. | remove (3) dormers at attic level. restore roof framing.Details
remove (3) dormers at attic level. restore roof framing. | $7,500 |
| Aug 21, 2023 | Never finaled issued Aug 2023, no final | 1466 Jackson St | Prime Construction & Renovation Inc. | revision to pa# 202006309419, limited scope of work to add two buner cooktop (no oven) at 3rd flr unit in home office (303), no changes from previously approved permit. per 204.1 no employees permitted in residence.Details
revision to pa# 202006309419, limited scope of work to add two buner cooktop (no oven) at 3rd flr unit in home office (303), no changes from previously approved permit. per 204.1 no employees permitted in residence. | $1,000 |
| May 22, 2023 | Completed final sign-off Nov 2023 | 859 35th Av | Prime Construction & Renovation Inc. | addition of new bathroom @ (e) study/guestroom @ 3/fDetails
addition of new bathroom @ (e) study/guestroom @ 3/f | $25,000 |
| May 8, 2023 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | revision to pa# 202205174382. add door at entry patio into garage.Details
revision to pa# 202205174382. add door at entry patio into garage. | $5,000 |
| Dec 1, 2022 | Completed final sign-off Jul 2024 | 48 Retiro Wy | Prime Construction & Renovation Inc. | expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern.Details
expand conditioned space to 1/f for common room and bath. renovate unit 48 and 50 with reconfigured kitchens, baths, and 2nd bath at each unit. remove walls b/t living and dining rooms at both units. replace (e) windows on front; in-kind, wood, true divided lite, match pattern. | $225,000 |
| Dec 1, 2022 | Completed final sign-off Dec 2022 | 591 Diamond St | Prime Construction & Renovation Inc. | repair subfloor in storage room, replace door in kind, paint.Details
repair subfloor in storage room, replace door in kind, paint. | $3,000 |
| Nov 3, 2022 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | revision to 201807235219. to omit windows at north side of laundry roomDetails
revision to 201807235219. to omit windows at north side of laundry room | |
| Oct 24, 2022 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | to comply with pysical inspection report #cc-8540. this is permit #2 accompanying pa 202206166480.Details
to comply with pysical inspection report #cc-8540. this is permit #2 accompanying pa 202206166480. | $20,000 |
| Oct 12, 2022 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building.Details
remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building. | $15,000 |
| Sep 20, 2022 | Completed final sign-off Nov 2022 | 722 Balboa St | Prime Construction & Renovation Inc. | 1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural.Details
1 (e) kitchen: replace ktichen counters & plumbing fixtures. 1 (e) bathroom: replce 1 vanity & toilet. refinish floors & paint interior. all work in kind. no structural. | $10,000 |
| Jul 20, 2022 | Completed final sign-off Apr 2025 | 160 Swiss Av | Prime Construction & Renovation Inc. | repair water damange drywall & tile in lower bathroom.Details
repair water damange drywall & tile in lower bathroom. | $5,000 |
| Jul 20, 2022 | Completed final sign-off Aug 2023 | 3624 Webster St | Prime Construction & Renovation Inc. | g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio.Details
g/f: expand (e) social hall at ground floor within (e) building footprint. convert non-conditioned space to conditined. add new full bathroom & new exterior doors to new patio. | $125,000 |
| Jun 16, 2022 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | replacement of all windows. front windows to be pacific aluminum clad. repair dryrot at front windows + doors - non structural. (8) front facing, (21) rear + tide. (29 total)Details
replacement of all windows. front windows to be pacific aluminum clad. repair dryrot at front windows + doors - non structural. (8) front facing, (21) rear + tide. (29 total) | $25,000 |
| Jun 9, 2022 | Completed final sign-off Jul 2022 | 160 Swiss Av | Prime Construction & Renovation Inc. | replacement of deck boards at ground level deck. less than 50% deck replacement (at rear of building).Details
replacement of deck boards at ground level deck. less than 50% deck replacement (at rear of building). | $7,000 |
| May 17, 2022 | Completed final sign-off Jun 2023 | 3442 19th St | Prime Construction & Renovation Inc. | unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous ownerDetails
unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous owner | $100,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2024 | 1466 Jackson St | Prime Construction & Renovation Inc. | rev to bpa#201809241227 & 201903266268. replacement of front exterior stair to basement w/new compliant stair w/encroachment.Details
rev to bpa#201809241227 & 201903266268. replacement of front exterior stair to basement w/new compliant stair w/encroachment. | |
| Apr 5, 2022 | Completed final sign-off Mar 2023 | 3624 Webster St | Prime Construction & Renovation Inc. | replacement of windows in kind on 2nd floor: windows at street to be wood.Details
replacement of windows in kind on 2nd floor: windows at street to be wood. | $35,000 |
| Apr 5, 2022 | Completed final sign-off Mar 2023 | 3624 Webster St | Prime Construction & Renovation Inc. | remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit.Details
remodel and partially reconfigure existing interior space at 1/f. add new half bath, replacing (e) f.a.u w/ heat pump hvac system for all conditioned spaces. no work to front facade - any work to front windows will be under seperate permit. | $300,000 |
| Mar 4, 2022 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | to comply with nov#202288190. revision to rear yard retaining walls per pa#202010146524.Details
to comply with nov#202288190. revision to rear yard retaining walls per pa#202010146524. | $10,000 |
| Mar 3, 2022 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | shoring permit for ba #202010146524Details
shoring permit for ba #202010146524 | |
| Dec 10, 2021 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | commencement of work not started under previously approved permit pa 2018-0723-5219Details
commencement of work not started under previously approved permit pa 2018-0723-5219 | $100,000 |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 649 Central Av | Prime Construction & Renovation Inc. | revision to pa# 202012070371. change beam location.Details
revision to pa# 202012070371. change beam location. | |
| Sep 13, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | Prime Construction & Renovation Inc. | revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall.Details
revision to pa# 202105250941. renovation to kitchen & bathrooom at 3rd fl. remove (e) non-bearing walls. add plywood sheathed wall. | $5,000 |
| May 25, 2021 | Completed final sign-off Nov 2021 | 651 Central Av | Prime Construction & Renovation Inc. | replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door.Details
replace 1 bath in kind. replace 1 kitchen in kind. no alteration of wall, window or door. | $40,000 |
| Dec 7, 2020 | Never finaled issued Dec 2020, no final | 1466 Jackson St | Prime Construction & Renovation Inc. | unit #1466 & 1468: remodel kitchen & bathroom in-kind.Details
unit #1466 & 1468: remodel kitchen & bathroom in-kind. | $1,000 |
| Dec 7, 2020 | Completed final sign-off Nov 2021 | 649 Central Av | Prime Construction & Renovation Inc. | unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor.Details
unit 649 - renovation of kitchen and bathroom at second floor. upgrade existing foundation at 1st floor. | $45,000 |
| Oct 14, 2020 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109.Details
expansion of conditional iv space to basement at 113 w/ (n) stair, bedrm, bath & fam rm. (n) roof deck at attic level w/ int stair@ 109. | $84,000 |
| Jul 8, 2020 | Completed final sign-off Sep 2020 | 371 Wawona St | Prime Construction & Renovation Inc. | kitchen remodel in-kind: new cabinets, new flooring & counter. (12x12).Details
kitchen remodel in-kind: new cabinets, new flooring & counter. (12x12). | $25,000 |
| Jun 30, 2020 | Completed final sign-off Jan 2024 | 1466 Jackson St | Prime Construction & Renovation Inc. | residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break areaDetails
residential dwelling unit interior renovations into existing residential building. demo non structural interior partitions and interior renovation of e bedroom, e baths, and e kitchen at e 2nd and 3rd fl units. interior structural seismic upgrade for e 2nd and 3rd fl units. home office w break area | $100,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2020 | 245 Fowler Av | Prime Construction & Renovation Inc. | front porch: replace damaged/settled brick finish on landing in kind replace railing in kind, (less than 50%) add 4 vents to crawl space, replace washers on foundation bolts w/ 3 x 3 x 1/4. (4 3/8" spear shall not pass at ceiling)Details
front porch: replace damaged/settled brick finish on landing in kind replace railing in kind, (less than 50%) add 4 vents to crawl space, replace washers on foundation bolts w/ 3 x 3 x 1/4. (4 3/8" spear shall not pass at ceiling) | $13,000 |
| Dec 5, 2019 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | re-roofing. ref to building app#201811206438Details
re-roofing. ref to building app#201811206438 | $10,000 |
| Nov 22, 2019 | Completed final sign-off Dec 2019 | 31 Fairmount St | Prime Construction & Renovation Inc. | 2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixturesDetails
2nd floor bathroom remodel: replace floor tiles, wall tiles, vanity, shower and vanity fixtures | $15,000 |
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 109 Pierce St | Prime Construction & Renovation Inc. | emergency partial repair of rear stair. no work visible to street. to comply with nov #201889001 #10.Details
emergency partial repair of rear stair. no work visible to street. to comply with nov #201889001 #10. | $1,000 |
| Mar 26, 2019 | Completed final sign-off Apr 2024 | 1466 Jackson St | Prime Construction & Renovation Inc. | add unit per ord 162-16. add new dwelling unit at rear of exist. 1st floor & in response to nov 201876793 & in addition to pa 2018-09-24-1227. ** maher n/a **Details
add unit per ord 162-16. add new dwelling unit at rear of exist. 1st floor & in response to nov 201876793 & in addition to pa 2018-09-24-1227. ** maher n/a ** | $9,000 |
| Feb 22, 2019 | Expired or cancelled cancelled Jul 2019 | 109 Pierce St | Prime Construction & Renovation Inc. | expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit.Details
expand conditioned living space at unit #109 to basement w.new interior stair, new bedroom, bath & family room; new private roof deck for unit 113 at attic level w/new interior stairs. new dormer. no work at middle unit. | $40,000 |
| Dec 10, 2018 | In progress issued Jan 2026 | 314 Park St | Prime Construction & Renovation Inc. | remodel to an existing two story single family residence. rear yard horizontal addition, 3rd story vertical addition,add bath,new front facade, excavation and full foundation replacement, interior remodel throughtout, legalization of an unathorized dwelling unitDetails
remodel to an existing two story single family residence. rear yard horizontal addition, 3rd story vertical addition,add bath,new front facade, excavation and full foundation replacement, interior remodel throughtout, legalization of an unathorized dwelling unit | $350,000 |
| Nov 20, 2018 | Completed final sign-off Sep 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | substantial rehab to comply with dbi nov 201889001 and his nov 201889391 to conform to contemporary standards for housing including emergency shoring due to failing foundation & remove structural members dryro, struct. upgrades of substandard conds. mitigation of mold lead paint inoperable doors.Details
substantial rehab to comply with dbi nov 201889001 and his nov 201889391 to conform to contemporary standards for housing including emergency shoring due to failing foundation & remove structural members dryro, struct. upgrades of substandard conds. mitigation of mold lead paint inoperable doors. | $1,200,000 |
| Sep 24, 2018 | Completed final sign-off Apr 2024 | 1466 Jackson St | Prime Construction & Renovation Inc. | per ordinance #43-14 in response to nov #201876793; convert (e) legal habitable rooms @ 1st floor into legal dwelling unit. ** maher: n/a **Details
per ordinance #43-14 in response to nov #201876793; convert (e) legal habitable rooms @ 1st floor into legal dwelling unit. ** maher: n/a ** | $11,000 |
| Jul 23, 2018 | Completed final sign-off Oct 2023 | 109 Pierce St | Prime Construction & Renovation Inc. | replacement in kind of rear egress stair at all floor level for required means of egress; repair less than 50% structure laundry roomsDetails
replacement in kind of rear egress stair at all floor level for required means of egress; repair less than 50% structure laundry rooms | $100,000 |
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 1466 Jackson St | Prime Construction & Renovation Inc. | 1466 a , for (e) roof deck at rear of building, cover (e) railing posts in decoritive wood. replace pickets with wire cable/ add new top cap to railing, no work visable to street, less than 50% repairDetails
1466 a , for (e) roof deck at rear of building, cover (e) railing posts in decoritive wood. replace pickets with wire cable/ add new top cap to railing, no work visable to street, less than 50% repair | $1,500 |
| Aug 3, 2017 | Completed final sign-off Feb 2018 | 3245 Steiner St | Prime Construction & Renovation Inc. | renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245Details
renovate kitchen, reconfigure existing bath, add a new master bath @ 3/f unit #3245 | $50,000 |
| Feb 28, 2017 | Completed final sign-off Feb 2018 | 3247 Steiner St | Prime Construction & Renovation Inc. | convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversionDetails
convert a portion of 1st floor area to conditioned space to include master bedroom & bath; new internal stair, renovate existing kitchen, reconfigure bath & add half bath at 2nd floor, replace windows in-kind, all other work for condo conversion | $100,000 |