Liza Pannozzo
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Lapnog Arch.
- On San Francisco permits
- Dec 2017 to Mar 2026
15 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 13 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2026 | In progress issued Apr 2026 | 1193 Noe St | Ideal Builders | addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet..Details
addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet.. | $200,000 |
| Jun 26, 2025 | Completed final sign-off Dec 2025 | 88 Chilton Av | N C P General Contracting Inc | remodel (e) primary bathroom @ 2nd fl; elimiate bathtub & vanity sink; relocate walk-in shower; relace vanity & toilet n (e) locations; new fixtures, finishes and lighting throughout. no change to # of rooms. no changes to exteriorDetails
remodel (e) primary bathroom @ 2nd fl; elimiate bathtub & vanity sink; relocate walk-in shower; relace vanity & toilet n (e) locations; new fixtures, finishes and lighting throughout. no change to # of rooms. no changes to exterior | $35,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 2754 Octavia St | N C P General Contracting Inc | revision to pa# 202406184726: at treads, risers - replace wood deck boards with tile. no changes to guardrails or wood siding. no change to size, profile, or location of stairs.Details
revision to pa# 202406184726: at treads, risers - replace wood deck boards with tile. no changes to guardrails or wood siding. no change to size, profile, or location of stairs. | $4,000 |
| Jun 26, 2024 | Completed final sign-off Feb 2025 | 2465 15th Av | A L Martin Construction | no changes to front of bldg or (e) 2/f. at 1/f: construct new deck less than 10' above grade; repalce rear facing windows. at basement: remodel (e) activity room, new sliding door, wet bar and patio. replce (e) furnace w/ new fancoil and condenser.Details
no changes to front of bldg or (e) 2/f. at 1/f: construct new deck less than 10' above grade; repalce rear facing windows. at basement: remodel (e) activity room, new sliding door, wet bar and patio. replce (e) furnace w/ new fancoil and condenser. | $85,000 |
| Nov 7, 2023 | Completed final sign-off Mar 2024 | 88 Chilton Av | N C P General Contracting Inc | remodel existing 1st flr. family room w/wet bar to include 2nd kitchen per planning code section 102. 2nd kitchen to have 2 burner cooktop, sink, dishwasher, fridge and microwave. new lighting, new cabinets and new flooring. no changes to exterior.Details
remodel existing 1st flr. family room w/wet bar to include 2nd kitchen per planning code section 102. 2nd kitchen to have 2 burner cooktop, sink, dishwasher, fridge and microwave. new lighting, new cabinets and new flooring. no changes to exterior. | $35,000 |
| May 8, 2023 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | revision to pa# 202205174382. add door at entry patio into garage.Details
revision to pa# 202205174382. add door at entry patio into garage. | $5,000 |
| Jan 17, 2023 | Completed final sign-off Jun 2023 | 154 Lombard St | Castillo Family Inc Dba Castle Company | unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughoutDetails
unit 46 - remodel kitchen like for like; remodel half bath, half bath and master bathrm all like for like; a prefabricated shower pan will be used in the master bathroom; upgrade main panel and install new lighting throughout | $58,000 |
| Oct 12, 2022 | Completed final sign-off Jun 2023 | 3440 19th St | Prime Construction & Renovation Inc. | remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building.Details
remodel rear kitchen "nook" in unit 3440 19th st (3rd fl). remove non-structural wall between nook & kitchen. replace existing door + window w/ new sliding glass door; max u val = 0.3. no work to front of building. | $15,000 |
| Sep 15, 2022 | Completed final sign-off Aug 2023 | 225 Mullen Av | remove load bearing wall and replace with beam and posts on 2nd floor. no changes to overall load paths from current structural system.Details
remove load bearing wall and replace with beam and posts on 2nd floor. no changes to overall load paths from current structural system. | $2,000 | |
| Jun 10, 2022 | Completed final sign-off Dec 2022 | 995 Dolores St | A L Martin Construction | remodel kitchen, remove non-structural partition,new appliances and fixtures and finishes replace 3 windows in-kind. remodel 2 (e) bathrooms, new fixtures, finishes and 2 windows in-kind not visible from the street.Details
remodel kitchen, remove non-structural partition,new appliances and fixtures and finishes replace 3 windows in-kind. remodel 2 (e) bathrooms, new fixtures, finishes and 2 windows in-kind not visible from the street. | $125,000 |
| May 17, 2022 | Completed final sign-off Jun 2023 | 3442 19th St | Prime Construction & Renovation Inc. | unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous ownerDetails
unit #3442: remodel 2nd fl. kithcen, new appliances finishes & fixtures, add full bath at 1st fl. storage area adjacent to (e) bedroom, legalize 2nd fl. full bathroom which was remodeled w/out permit by previous owner | $100,000 |
| Apr 8, 2022 | Completed final sign-off Sep 2022 | 2169 Folsom St | Restoration Workshop Ltd | #m205: interior cosmetic remodel of 2nd floor loft. no structural work or changes to exterior walls or windows. replace kitchen cabinets and appliances, replace bathroom fixtures and tile, replace door to unit from hallway, replace l.v. transformers.Details
#m205: interior cosmetic remodel of 2nd floor loft. no structural work or changes to exterior walls or windows. replace kitchen cabinets and appliances, replace bathroom fixtures and tile, replace door to unit from hallway, replace l.v. transformers. | $150,000 |
| Dec 28, 2021 | Completed final sign-off Nov 2022 | 647 Teresita Bl | Fox Brothers Construction Inc | remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard.Details
remodel e kitchen, full bath, master bath.add new full bath adjacent to e bath, repair framing and replace deck boards and guardrails @ 2 existing balconies. replace gas furnace with in floor radiant heating. no work to front facade. new 10'x12' deck at rear yard. | $375,000 |
| Oct 1, 2020 | Never finaled issued Jan 2021, no final | 273 Friedell St | Precise Construction & Design/Dba Precis | add full bathroom on first floor adjacent to existing bedroom. relocate existing laundry closet to other side of new bathroom. add a/c unit at rear patio. no structural. reference to permit application #200912223677Details
add full bathroom on first floor adjacent to existing bedroom. relocate existing laundry closet to other side of new bathroom. add a/c unit at rear patio. no structural. reference to permit application #200912223677 | $40,000 |
| Dec 4, 2017 | Completed final sign-off Feb 2020 | 2016 14th Av | two story addition @ rear of property. approx 220 sf total expand kitchen @ 1st fl. add master bath @ 2nd floorDetails
two story addition @ rear of property. approx 220 sf total expand kitchen @ 1st fl. add master bath @ 2nd floor | $88,000 |