Tsang Ngai Ho Kent
- Listed as
- authorized agent-others, contractor
- Firm
- O S E Horizon Enterprise
- Based in
- Alameda
- On San Francisco permits
- Oct 2015 to Aug 2024
34 permits since 2000 (contractor on 34 permits, authorized agent-others on 2 permits): 30 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2024 | Completed final sign-off Jan 2025 | 776 Victoria St | O S E Horizon Enterprise | revision to pa# 2024-0320-8213 revised structural drawings due to site conditionDetails
revision to pa# 2024-0320-8213 revised structural drawings due to site condition | |
| Apr 16, 2024 | Completed final sign-off Jan 2025 | 776 Victoria St | O S E Horizon Enterprise | interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet.Details
interior remodel to (e) two story sfr. (e) kitchen remodel, (e) dining remodel. remodel (e) living room, fireplace. (n) lighting and (n) outlet. | $50,000 |
| Jan 17, 2024 | Completed final sign-off Mar 2024 | 872 Lombard St | O S E Horizon Enterprise | renovate existing kitchen, replace cabinets and counter inkind, 70sfDetails
renovate existing kitchen, replace cabinets and counter inkind, 70sf | $12,000 |
| Nov 29, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | O S E Horizon Enterprise | revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundryDetails
revision to 202307202633. modify 1st fl kitchen layout unit 329. remove wall and sister e joists above kitchen (unit 329). add a full bath. relocate laundry | $10,000 |
| Nov 7, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | O S E Horizon Enterprise | repair floor framingDetails
repair floor framing | $5,000 |
| Jul 20, 2023 | Completed final sign-off Oct 2024 | 327 Chestnut St | O S E Horizon Enterprise | renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom.Details
renovate kitchens on 1st and 2nf fl. remove partition on each floor between kitchens and (e) laundry. add shear walls on a wall line. new garage beam. replace fixtures and finishes in first and second floor bathroom. | $130,000 |
| Jul 20, 2023 | Completed final sign-off May 2024 | 199 Burnside Av | O S E Horizon Enterprise | remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system.Details
remodel (e) office & bathroom in-kind on 1/f. add (n) mech/laundry room & office on 1/f.add 2 windows at rear on 1/f. remodel (e) 2/f bathroom & kitchen. reolacate (e) bedroom & living room per plan. install (n) mini-split system. | $85,000 |
| Dec 12, 2022 | Completed final sign-off Mar 2023 | 555 06th Av | O S E Horizon Enterprise | master bath remodel: wall/layout remain with a shower pan.Details
master bath remodel: wall/layout remain with a shower pan. | $11,500 |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 463 Arlington St | O S E Horizon Enterprise | bathroom remodel- in kind ground floor walk in shower, toilet vanity fixture replacementDetails
bathroom remodel- in kind ground floor walk in shower, toilet vanity fixture replacement | $12,000 |
| Aug 19, 2022 | Completed final sign-off Nov 2022 | 49 Hamilton St | O S E Horizon Enterprise | (1) bathroom remodel- in kind- replace vanity toilet & fixtures w/ a walk in showerDetails
(1) bathroom remodel- in kind- replace vanity toilet & fixtures w/ a walk in shower | $10,000 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 479 33rd Av | O S E Horizon Enterprise | for unit #481: remodel (1) full bath and (1) half bath on 2nd floor. replace in kind. no wall removal.Details
for unit #481: remodel (1) full bath and (1) half bath on 2nd floor. replace in kind. no wall removal. | $12,000 |
| Apr 13, 2022 | Completed final sign-off Jul 2022 | 479 33rd Av | O S E Horizon Enterprise | remodel (1) full bath & (1-1/2) bath with tub, vanity & toilet replacement. work on the top floor only.Details
remodel (1) full bath & (1-1/2) bath with tub, vanity & toilet replacement. work on the top floor only. | $13,500 |
| Sep 16, 2021 | Never finaled issued Sep 2021, no final | 477 Vallejo St | O S E Horizon Enterprise | bathroom remodel. no moving walls. lights per cenc 150.0(k).Details
bathroom remodel. no moving walls. lights per cenc 150.0(k). | $10,000 |
| Jun 18, 2021 | Completed final sign-off Jan 2022 | 443 Hazelwood Av | O S E Horizon Enterprise | partition 2nd fl bath into 2 separate baths, add wall bisecting (e) bath. open doorway from adjoined primary bdrm to new bath, remove 1 elec outlet, install toilet,shower,vanity in bath adjoining primary bath.Details
partition 2nd fl bath into 2 separate baths, add wall bisecting (e) bath. open doorway from adjoined primary bdrm to new bath, remove 1 elec outlet, install toilet,shower,vanity in bath adjoining primary bath. | $20,000 |
| Apr 8, 2021 | Never finaled issued Apr 2021, no final | 2827 20th St | O S E Horizon Enterprise | bathroom remodel in kind.Details
bathroom remodel in kind. | $11,000 |
| Mar 22, 2021 | Completed final sign-off Jun 2021 | 600 Upland Dr | O S E Horizon Enterprise | hallway bath in kind remodel. replace existing shower with shower pan. replace toilet, install a vanity and exhaust fan.Details
hallway bath in kind remodel. replace existing shower with shower pan. replace toilet, install a vanity and exhaust fan. | $15,000 |
| Feb 19, 2021 | Completed final sign-off Jun 2021 | 600 Upland Dr | O S E Horizon Enterprise | bathroom remodel in-kind, walk-in shower, tub replacement, vanity replacement, toilet replacementDetails
bathroom remodel in-kind, walk-in shower, tub replacement, vanity replacement, toilet replacement | $10,500 |
| Sep 4, 2020 | Expired or cancelled cancelled Nov 2020 | 680 06th Av | O S E Horizon Enterprise | full bath and 1/2 bath remodel. no wall alterationDetails
full bath and 1/2 bath remodel. no wall alteration | $15,000 |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 1996 Union St | O S E Horizon Enterprise | relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outletDetails
relocate front door to combine 2nd & 3rd fl; replace all hardwood floors; repair (mud)/sand/paint walls & doors; replace light fixtures & damaged electrical outlets/switch covers; frame 2 walls between new 1/2 bath (to meet ada req from initial application) including install new tile and gfci outlet | $55,000 |
| Aug 30, 2019 | Completed final sign-off Feb 2020 | 768 06th Av | O S E Horizon Enterprise | reroofingDetails
reroofing | $6,000 |
| Nov 1, 2018 | Completed final sign-off Mar 2020 | 768 06th Av | O S E Horizon Enterprise | to comply with nov 201855661 item #2 - 1st flr infill pop out at rear to accomodate a bedrm. convert (e) storage into family rm, 1 bedrm, 1 full bathrm and den. add 1 int stairway for connection btw 1st & 2nd. 2nd flr - reconfig layout add 1 powder rm. 3rd flr: convert (e) bedrm into two bedrms.Details
to comply with nov 201855661 item #2 - 1st flr infill pop out at rear to accomodate a bedrm. convert (e) storage into family rm, 1 bedrm, 1 full bathrm and den. add 1 int stairway for connection btw 1st & 2nd. 2nd flr - reconfig layout add 1 powder rm. 3rd flr: convert (e) bedrm into two bedrms. | $60,000 |
| May 24, 2018 | Completed final sign-off Nov 2018 | 300 03rd St | O S E Horizon Enterprise | hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher.Details
hall & master bath remodel. kitchen remodel. replace (e) cabinets & counter top at the same location. n/a for maher. | $31,500 |
| May 24, 2018 | Completed final sign-off Aug 2018 | 77 Dow Pl | O S E Horizon Enterprise | master bath remodel. replace floor & wall tiles w/ new floor & wall tiles. n/a for maher.Details
master bath remodel. replace floor & wall tiles w/ new floor & wall tiles. n/a for maher. | $10,000 |
| May 15, 2018 | Expired or cancelled cancelled Aug 2020 | 768 06th Av | O S E Horizon Enterprise | install an ew wall herater. repair for complaints 201855661 / 201860072 /2018659921Details
install an ew wall herater. repair for complaints 201855661 / 201860072 /2018659921 | $2,500 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 2343 19th Av | O S E Horizon Enterprise | siding replacement at the backDetails
siding replacement at the back | $3,500 |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 1130 Eddy St | O S E Horizon Enterprise | replace three windows and and two sliding doors in kind.Details
replace three windows and and two sliding doors in kind. | $10,000 |
| Jun 27, 2017 | Completed final sign-off Nov 2017 | 1130 Eddy St | O S E Horizon Enterprise | kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles.Details
kitchen and two bathrooms remodel, replace new countertops and cabinets. replace new vanity and toilets. install bathroom and kitchen tiles. | $38,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2017 | 2918 Van Ness Av | O S E Horizon Enterprise | front and rear window replacment. windows at the front will be aluminum in this case fit existing opening.Details
front and rear window replacment. windows at the front will be aluminum in this case fit existing opening. | $7,500 |
| Dec 13, 2016 | Completed final sign-off May 2017 | 699 36th Av | O S E Horizon Enterprise | apt 201: ktichen remodel: replace countertop and cabinet. bathroom remodels (guest & master): tile bathroom floor and west area. replace fanity, tub, and remodel shower. no change on walls.Details
apt 201: ktichen remodel: replace countertop and cabinet. bathroom remodels (guest & master): tile bathroom floor and west area. replace fanity, tub, and remodel shower. no change on walls. | $45,000 |
| Nov 10, 2016 | Completed final sign-off Apr 2017 | 2918 Van Ness Av | O S E Horizon Enterprise | kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath.Details
kitchen remodel - replace kitchen countertop and cabinets, guest bath and master bath remodel - tile bathroom floor, replace vanity and toilet, replace bathtub at master bath. | $35,000 |
| Jul 27, 2016 | Completed final sign-off Dec 2016 | 857 Fell St | O S E Horizon Enterprise | replace 6 street-facing windows with full wood and double panes. windows will be full wood with ogee lugs to match.Details
replace 6 street-facing windows with full wood and double panes. windows will be full wood with ogee lugs to match. | $5,600 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 857 Fell St | O S E Horizon Enterprise | window replacement at the back. not visible from the street.Details
window replacement at the back. not visible from the street. | $5,000 |
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 857 Fell St | O S E Horizon Enterprise | remove (e) tub and reinstall (e) to replace bathroom floor tiles.Details
remove (e) tub and reinstall (e) to replace bathroom floor tiles. | $8,000 |
| Oct 21, 2015 | Completed final sign-off Mar 2016 | 553 Clipper St | O S E Horizon Enterprise | replace bath tub and retile on 553 clipper st. no wall to be tear down or added. no plumbing changes.Details
replace bath tub and retile on 553 clipper st. no wall to be tear down or added. no plumbing changes. | $3,200 |