106 permits since 2000 (architect on 92 permits, engineer on 11 permits, authorized agent-others on 3 permits): 79 completed, 10 never finaled, 17 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 106.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2014 | Completed final sign-off Apr 2015 | 2278 19th Av | remodel of 1st floor to include one bedroom with study, 1 bathroom, one family room, 1 storage room within the extg bldg envelope of 1st floor.Details
remodel of 1st floor to include one bedroom with study, 1 bathroom, one family room, 1 storage room within the extg bldg envelope of 1st floor. | $38,000 | |
| Mar 19, 2014 | Expired or cancelled cancelled Nov 2024 | 1310 Kearny St | to document the layout of existing residential building as 4 units. 1 o the 1st floor, 2 units on the 2nd fl, 1 units on the 3rd fl. these plan serve to correct the record from 5 units to 4 units. no construction to be done.Details
to document the layout of existing residential building as 4 units. 1 o the 1st floor, 2 units on the 2nd fl, 1 units on the 3rd fl. these plan serve to correct the record from 5 units to 4 units. no construction to be done. | ||
| Jan 8, 2014 | Completed final sign-off Aug 2014 | 429 Stockton St | Traube Construction Company | extg commercial tea sales and drinking space on 1st floor.remodel public area for boboa sales & drinking. remodel extg toilet room & apply for hardship compliance due to hardship and physical space constraints.provide for drink preparation space and painting facility. storefront/signs under sep.perDetails
extg commercial tea sales and drinking space on 1st floor.remodel public area for boboa sales & drinking. remodel extg toilet room & apply for hardship compliance due to hardship and physical space constraints.provide for drink preparation space and painting facility. storefront/signs under sep.per | $25,000 |
| Nov 20, 2013 | Completed final sign-off Jul 2016 | 1654 43rd Av | remodel part of existing first fl family room and study room, adding single story towards the rear consisting of two bedrooms one bathroom and a lightwell.Details
remodel part of existing first fl family room and study room, adding single story towards the rear consisting of two bedrooms one bathroom and a lightwell. | $78,000 | |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 679 39th Av | Traube Construction Company | 1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rearDetails
1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rear | $125,000 |
| Jul 2, 2013 | Completed final sign-off Aug 2013 | 314 24th Av | Traube Construction Company | 1st floor enlose space under sunroom with new walls for storage, 2nd floor remodel power room in rear of bldg to full bath with shower.Details
1st floor enlose space under sunroom with new walls for storage, 2nd floor remodel power room in rear of bldg to full bath with shower. | $13,500 |
| Apr 18, 2013 | Never finaled issued Apr 2013, no final | 1582 22nd Av | legalize (e) rooms on 1st floor, consisting of laundry room, bathroom, bedroom & study room. gyp board garage walls & ceilingDetails
legalize (e) rooms on 1st floor, consisting of laundry room, bathroom, bedroom & study room. gyp board garage walls & ceiling | $4,000 | |
| Mar 26, 2013 | Never finaled filed Mar 2013, never issued | 659 Guerrero St | 1/fl:add 1 br,1 ba,1 fam rm&stairs to 2/fl. 2/fl:adjust bedrm size&add interior stairs to 1/fl. 3/fl:adjust bedrm size.provide stairs to4/fl addition. 4/fl:new add'n of 2 br, 2ba,liv rm,dining rm. roof:prov hot tub & stairs to lower fls.Details
1/fl:add 1 br,1 ba,1 fam rm&stairs to 2/fl. 2/fl:adjust bedrm size&add interior stairs to 1/fl. 3/fl:adjust bedrm size.provide stairs to4/fl addition. 4/fl:new add'n of 2 br, 2ba,liv rm,dining rm. roof:prov hot tub & stairs to lower fls. | $200,000 | |
| Jan 18, 2013 | Completed final sign-off May 2013 | 3491 19th St | Traube Construction Company | portion of (e) bldg, remodel (e) boba milk tea drinking facility consisting of (e) toilet room, drink preparation area, drinking area for customers. work consists of re-finishing, painting & installation of lighting. all work is within the envelope of (e) facility.Details
portion of (e) bldg, remodel (e) boba milk tea drinking facility consisting of (e) toilet room, drink preparation area, drinking area for customers. work consists of re-finishing, painting & installation of lighting. all work is within the envelope of (e) facility. | $13,300 |
| Jan 2, 2013 | Completed final sign-off Apr 2013 | 1567 33rd Av | 1st fl: remodel of garage area to have 1 famly room and 1 parking space, 2 bedrooms, 1 full bath. at 2nd floor: remove deck from lightwell and provide guardrail at nook sliding doorDetails
1st fl: remodel of garage area to have 1 famly room and 1 parking space, 2 bedrooms, 1 full bath. at 2nd floor: remove deck from lightwell and provide guardrail at nook sliding door | $15,000 | |
| Nov 30, 2012 | Completed final sign-off May 2017 | 95 Middlefield Dr | Traube Construction Company | 1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor.Details
1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor. | $105,000 |
| Nov 30, 2012 | Completed final sign-off Apr 2013 | 816 Ortega St | Traube Construction Company | revision to pa#2012-0731-6155. 1st floor add (n) 1 bedroom, 1 bathroom & 1 family room w/ garage space for single car parking. all interior work.Details
revision to pa#2012-0731-6155. 1st floor add (n) 1 bedroom, 1 bathroom & 1 family room w/ garage space for single car parking. all interior work. | $23,000 |
| Nov 16, 2012 | Completed final sign-off Aug 2019 | 10 De Soto St | Oriental Construction & Metal Corp. | remodeling of (e) interior, 1st floor design kitchen provide opening to dining room and nook. 2nd floor remodel (e) bathroom, provide new master bathroom adjacent to master bedroom when completed this floor is to have 3 bedrooms & 2 baths, provide storage in basementDetails
remodeling of (e) interior, 1st floor design kitchen provide opening to dining room and nook. 2nd floor remodel (e) bathroom, provide new master bathroom adjacent to master bedroom when completed this floor is to have 3 bedrooms & 2 baths, provide storage in basement | $33,000 |
| Aug 20, 2012 | Completed final sign-off Jan 2013 | 1364 46th Av | to complya w/nov #201280453 - to remove the cooking appliance/kitchen installed without permit & add family room at garage level, miscellanous minor work to comply w/code.Details
to complya w/nov #201280453 - to remove the cooking appliance/kitchen installed without permit & add family room at garage level, miscellanous minor work to comply w/code. | $3,000 | |
| Aug 2, 2012 | Completed final sign-off Nov 2012 | 1150 Geneva Av | Perfect Connection Inc. | change of use to convert (e) retail spaces into state licensed foot massage establishment (medicinal purposes). remodel 1 (e) bathroom to comply with ada accessible toilet.Details
change of use to convert (e) retail spaces into state licensed foot massage establishment (medicinal purposes). remodel 1 (e) bathroom to comply with ada accessible toilet. | $8,000 |
| Jun 26, 2012 | Completed final sign-off Aug 2012 | 2580 Geary Bl | convert (e) medical office into state licensed massage therapy establishment.Details
convert (e) medical office into state licensed massage therapy establishment. | $1,000 | |
| Jun 8, 2012 | Completed final sign-off Jun 2014 | 3433 Kirkham St | Great River Construction Inc. | remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom.Details
remodel 1st floor: new family room, 1 bedroom, 1 full bathroom & laundry. remodel (e) 2nd floor bathroom, kitchen & add a new master bathroom. | $70,000 |
| Feb 16, 2012 | Completed final sign-off Jul 2012 | 30 29th St | Radiant Construction Company | convert (e) retail space to foot massage establishment.Details
convert (e) retail space to foot massage establishment. | $800 |
| Feb 8, 2012 | Completed final sign-off Sep 2012 | 283 Fair Oaks St | U A Construction | add 2 bathrooms, provide interior stairs from 2nd floor to 1st floor. add entertainment room, finish entertainment room per plan.Details
add 2 bathrooms, provide interior stairs from 2nd floor to 1st floor. add entertainment room, finish entertainment room per plan. | $47,500 |
| Nov 14, 2011 | Completed final sign-off Jun 2014 | 2031 15th Av | C L Y Incorporated | rear addition of 1st floor 24'x12' consis study room & bedroom.add 3'6" x 11' on 2/fl to enlarge exist living rm. (n) water proof deck over added area on 1st fl. provide 1 (n) conc retaining wall 5' from (n) bldg wall. (n) storage under 1st floorDetails
rear addition of 1st floor 24'x12' consis study room & bedroom.add 3'6" x 11' on 2/fl to enlarge exist living rm. (n) water proof deck over added area on 1st fl. provide 1 (n) conc retaining wall 5' from (n) bldg wall. (n) storage under 1st floor | $65,000 |
| Oct 11, 2011 | Completed final sign-off Jan 2012 | 56 College Av | to comply w/ nov # 201144847 of 6/16/2011 and complaint# 200901621 to remove illegal kitchen on 1st/garage fl.incl. install new inter connecting access from 1st fl lobby to rooms behind garae and the 2nd fl above., remodel bathrm, new bath, new wet bar at forst/ garage floor.Details
to comply w/ nov # 201144847 of 6/16/2011 and complaint# 200901621 to remove illegal kitchen on 1st/garage fl.incl. install new inter connecting access from 1st fl lobby to rooms behind garae and the 2nd fl above., remodel bathrm, new bath, new wet bar at forst/ garage floor. | $22,000 | |
| Jul 5, 2011 | Never finaled issued Aug 2013, no final | 675 33rd Av | 1/flr:remodel garage to park 2 cars.prov stairs bath,storage, family rm within(e)space at rear of bldg within/(e) envelope. 2/flr:add 405 sqft redesign plan to have 2 br,2 bath,kitchen& dining. 3/flr:no wk to be done. work done prev in separate p/a #200611177998.portion of roof become deck.Details
1/flr:remodel garage to park 2 cars.prov stairs bath,storage, family rm within(e)space at rear of bldg within/(e) envelope. 2/flr:add 405 sqft redesign plan to have 2 br,2 bath,kitchen& dining. 3/flr:no wk to be done. work done prev in separate p/a #200611177998.portion of roof become deck. | $158,000 | |
| Jan 25, 2011 | Never finaled issued Mar 2011, no final | 1434 16th Av | remodel existing floor, rooms to have family room, study, bedroom, laundry, office. all rooms within envelope of existing 1st fl space. replace/new windows at gr floorDetails
remodel existing floor, rooms to have family room, study, bedroom, laundry, office. all rooms within envelope of existing 1st fl space. replace/new windows at gr floor | $80,000 | |
| Jan 6, 2011 | Completed final sign-off May 2011 | 2759 35th Av | remodeling of extg 1st floor consisting final rooms of family room,study room,bathroom storage. all work is within the envelope of extg bldgDetails
remodeling of extg 1st floor consisting final rooms of family room,study room,bathroom storage. all work is within the envelope of extg bldg | $45,000 | |
| Nov 9, 2010 | Completed final sign-off Sep 2014 | 414 Myra Wy | to comply w/ complaint# 201039727. remodel (e) basement fam.rm for master br and bath. 1st fl: remodel lv rm, dining kitchen ( in fill light well, no wdw on adj.prop wall) 2nd fl: remodel (e)bath and add new rear deck 8'6" above grade.Details
to comply w/ complaint# 201039727. remodel (e) basement fam.rm for master br and bath. 1st fl: remodel lv rm, dining kitchen ( in fill light well, no wdw on adj.prop wall) 2nd fl: remodel (e)bath and add new rear deck 8'6" above grade. | $60,000 | |
| Aug 2, 2010 | Completed final sign-off Feb 2011 | 218 Jules Av | remodeling of 1st floor: new family room, study room, bathroom, 2 bedrooms & (e) parking space. second floor modified bathroom & kitchen and add one half bath. enlarge (e) windows at rear facadeDetails
remodeling of 1st floor: new family room, study room, bathroom, 2 bedrooms & (e) parking space. second floor modified bathroom & kitchen and add one half bath. enlarge (e) windows at rear facade | $108,000 | |
| May 27, 2010 | Completed final sign-off Nov 2011 | 83 Melrose Av | remodeling of (e) first flr. rooms to have an extra 290 sq.ft. first flr. to have family rm., study, bathroom, powder room & laundry facility. replace front stair with granite. replace cement plaster @ front of resid.Details
remodeling of (e) first flr. rooms to have an extra 290 sq.ft. first flr. to have family rm., study, bathroom, powder room & laundry facility. replace front stair with granite. replace cement plaster @ front of resid. | $60,000 | |
| Mar 18, 2010 | Expired or cancelled cancelled Feb 2021 | 300 Liberty St | unit #3 - addition of a penthouse on top of existing roof of 964 sq ft consisting of bathroom, bedroom, entertainment room, closet & stairs.Details
unit #3 - addition of a penthouse on top of existing roof of 964 sq ft consisting of bathroom, bedroom, entertainment room, closet & stairs. | $200,000 | |
| Mar 2, 2010 | Expired or cancelled cancelled Nov 2012 | 654 29th Av | addition & remodeling of (e) 2-story building. final # of rooms. 1st. flr. to have garage, entry, bathroom, entertaimment rm. & bedrm. 2nd. flr. to have liv. rm. bedrm., dining rm. bathrm., kitchen, fam. rm. mbr./mba. new 3rd. flr., (n) study, (n) bd. & bathrm.Details
addition & remodeling of (e) 2-story building. final # of rooms. 1st. flr. to have garage, entry, bathroom, entertaimment rm. & bedrm. 2nd. flr. to have liv. rm. bedrm., dining rm. bathrm., kitchen, fam. rm. mbr./mba. new 3rd. flr., (n) study, (n) bd. & bathrm. | $128,000 | |
| Dec 30, 2009 | Completed final sign-off May 2011 | 2400 Noriega St | L B Commercial Construction Inc. | demolish a 2 story chruchDetails
demolish a 2 story chruch | $15,000 |
| Dec 2, 2009 | Never finaled issued Jan 2010, no final | 509 Grant Av | T J Constr Inc***Ck Id,Tie Liu Only***** | remodel (e) vacant retail space on 1st fl. remodel entry store front door, retail display area, shelving, counter storage and minor work in unisex toilet. no work in (e) basement to be done.Details
remodel (e) vacant retail space on 1st fl. remodel entry store front door, retail display area, shelving, counter storage and minor work in unisex toilet. no work in (e) basement to be done. | $48,000 |
| Oct 28, 2009 | Completed final sign-off Feb 2010 | 546 20th Av | Kin Construction | 1st floor-remove (e) furnaces & replace with new furnaces for bathroom units on 2nd floor. 2nd floor-remodel kitchn, bathroom, powder & laundry room. 3rd floor-no work to be doneDetails
1st floor-remove (e) furnaces & replace with new furnaces for bathroom units on 2nd floor. 2nd floor-remodel kitchn, bathroom, powder & laundry room. 3rd floor-no work to be done | $38,000 |
| Sep 10, 2009 | Completed final sign-off Jun 2010 | 2514 33rd Av | Alpha Construction & Engineering Inc. | excavate (e) portion of 1st floor to 8'-0" ceiling height. 1st floor-remodeling to have family room, bathroom, bedroom, study room with 2 car tandemn parking space. 2nd floor-remove interconnecting door to 1st floorDetails
excavate (e) portion of 1st floor to 8'-0" ceiling height. 1st floor-remodeling to have family room, bathroom, bedroom, study room with 2 car tandemn parking space. 2nd floor-remove interconnecting door to 1st floor | $90,000 |
| Sep 2, 2009 | Completed final sign-off Jul 2013 | 5735 Mission St | Chiang C M Construction Inc. | add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bathDetails
add to (e) 2 story building converting it to a 3 story senior care home, 1st floor has: multipurpose room, offices, kitchen, h.c. toilets, elevator & machine rooms. 2nd floor has 11 double occupancy bedrooms with bedrooms & staff room.lounge area. 3rd floor has double occupancy bedroom, bath | $1,500,000 |
| Aug 20, 2009 | Expired or cancelled cancelled Dec 2011 | 5642 Mission St | demo existing 2-car garage/carport.Details
demo existing 2-car garage/carport. | $8,000 | |
| Aug 4, 2009 | Completed final sign-off Sep 2012 | 5642 Mission St | T J Constr Inc***Ck Id,Tie Liu Only***** | blk 7098 lots 8 & 9 were merged to become lot 021,old lot #8 now has a storage shed&garage will demo in a sep permit.the (e)bldg on blk 7098 old lot #9 will altered&add on to become a larger building.on 1/fl worship areas,kitchen,multi purpose rm bathrm,bedrm.2/fl to have living bedrm.Details
blk 7098 lots 8 & 9 were merged to become lot 021,old lot #8 now has a storage shed&garage will demo in a sep permit.the (e)bldg on blk 7098 old lot #9 will altered&add on to become a larger building.on 1/fl worship areas,kitchen,multi purpose rm bathrm,bedrm.2/fl to have living bedrm. | $880,000 |
| Jul 20, 2009 | Completed final sign-off Mar 2010 | 1547 22nd Av | remove post beam, conc for footing, furnace to receive new imporvement 1st floor improvement. to have 2 bedrooms, 1 family room and 1 full bath. provide laundry area and new furnace. note 1 of the new bedroom as listed above is under the 2nd floor bedroom. in a new enclosure.Details
remove post beam, conc for footing, furnace to receive new imporvement 1st floor improvement. to have 2 bedrooms, 1 family room and 1 full bath. provide laundry area and new furnace. note 1 of the new bedroom as listed above is under the 2nd floor bedroom. in a new enclosure. | $78,000 | |
| May 27, 2009 | Completed final sign-off Sep 2009 | 1635 34th Av | Zooey Construction Co | revision to 200904106025: 1st floor add 1 bathroom in existing family room space. 2nd floor, remodel bathroom area to have an extra half bath. complaint 200876444Details
revision to 200904106025: 1st floor add 1 bathroom in existing family room space. 2nd floor, remodel bathroom area to have an extra half bath. complaint 200876444 | $3,800 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 1459 45th Av | Green Metro Inc | replace rear stairs and landing in kind, modify railing spacing to comply with codeDetails
replace rear stairs and landing in kind, modify railing spacing to comply with code | $10,500 |
| May 6, 2009 | Completed final sign-off Oct 2012 | 2600 Chestnut St | addition to (e) garage bath & storage room @ 1st fl: new entry, entertainment room, bath &stairs. 2nd fl: kitchen, dining, living rm & bath. 3rd fl; mstr bdrm, bath, 2 bdrms, sunroom, bath. this projected located in newly subdivided lot, application of subdivision in progress.Details
addition to (e) garage bath & storage room @ 1st fl: new entry, entertainment room, bath &stairs. 2nd fl: kitchen, dining, living rm & bath. 3rd fl; mstr bdrm, bath, 2 bdrms, sunroom, bath. this projected located in newly subdivided lot, application of subdivision in progress. | $408,000 | |
| Apr 28, 2009 | Completed final sign-off Feb 2010 | 1501 34th Av | Alpha Construction & Engineering Inc. | remodel existing space on 1st floor: entertainment room, bathroom, laundry area & 2 bedrooms. midlevel combine existing bedroom & bath to become a study room, 2nd floor: widen & remodel kitchen by relocating a wall.Details
remodel existing space on 1st floor: entertainment room, bathroom, laundry area & 2 bedrooms. midlevel combine existing bedroom & bath to become a study room, 2nd floor: widen & remodel kitchen by relocating a wall. | $95,000 |
| Apr 10, 2009 | Completed final sign-off Sep 2009 | 1635 34th Av | comply w/abate complaint #200876444 -first floor improvement: add 2 bedrms,family rm, bathrm. replace (e) furnace. add deck in rear of bldg. second floor: remodel bathrm, kitchen & provide new bathroom. work is within (e) envelope.Details
comply w/abate complaint #200876444 -first floor improvement: add 2 bedrms,family rm, bathrm. replace (e) furnace. add deck in rear of bldg. second floor: remodel bathrm, kitchen & provide new bathroom. work is within (e) envelope. | $60,000 | |
| Mar 30, 2009 | Completed final sign-off Mar 2010 | 2538 28th Av | L.G. Construction Co.,Inc | 1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade.Details
1st. flr.: remodel (2) bedrms., fam. rm. & bathrm. change furn. & w/h. replace dilapidited conc. slab. 2nd. flr.: remodel master bath & master bedrm., re-design location of (2) bedrms, a bathrm., kitchen voluntary seismic upgrading of residence. provide rear deck 3'-5" above grade. | $95,000 |
| Jan 20, 2009 | Completed final sign-off Sep 2009 | 152 Jules Av | W J L Construction Inc | 1st fl: remove interior stairs, computer rm furnace & water heater, improvement stairs, 1 bedrm, 1 bathrm, family rm, toilet rm, study & laundry rm. at 2nd fl: replace stairs & install 3'x3' skylight.Details
1st fl: remove interior stairs, computer rm furnace & water heater, improvement stairs, 1 bedrm, 1 bathrm, family rm, toilet rm, study & laundry rm. at 2nd fl: replace stairs & install 3'x3' skylight. | $80,000 |
| Jan 8, 2009 | Completed final sign-off Mar 2017 | 950 Grant Av | Granite Expo Installation Co Inc | on basement, 1st floor, second floor improve the interior shell of building with handicapped accessible toilets. handicap complaining stairs. handicap accessible new elevator. change exterior windows & store front with like kind as extng porvide fire rated finishes on the interior. sprinkler buildgDetails
on basement, 1st floor, second floor improve the interior shell of building with handicapped accessible toilets. handicap complaining stairs. handicap accessible new elevator. change exterior windows & store front with like kind as extng porvide fire rated finishes on the interior. sprinkler buildg | $200,000 |
| Jan 5, 2009 | Completed final sign-off Jul 2009 | 594 34th Av | remove the illegal use of family room and convert back to original use of garage. also convert full bathroom to powder room. comply with complaint #200883922, 200883923. housing inspection services # 200877973-for notices of violationDetails
remove the illegal use of family room and convert back to original use of garage. also convert full bathroom to powder room. comply with complaint #200883922, 200883923. housing inspection services # 200877973-for notices of violation | $4,000 | |
| Nov 26, 2008 | Completed final sign-off Apr 2009 | 1170 Burrows St | Macro Builder Inc | first floor:behind 2 extg parking spaces, improve 1 family room, 1 bedroom, 1 bath, study and hall way. all work is within the envelope of extg bldgDetails
first floor:behind 2 extg parking spaces, improve 1 family room, 1 bedroom, 1 bath, study and hall way. all work is within the envelope of extg bldg | $35,000 |
| Nov 17, 2008 | Completed final sign-off Mar 2009 | 460 Woolsey St | remodeling of (e) 1st floor to construct a bedroom, exercise room, walk-in closet, bathroom and powder room. keeping (e) 2 car parking spacesDetails
remodeling of (e) 1st floor to construct a bedroom, exercise room, walk-in closet, bathroom and powder room. keeping (e) 2 car parking spaces | $20,000 | |
| Oct 7, 2008 | Expired or cancelled cancelled Dec 2015 | 1227 San Bruno Av | 4th floor vert addition & remodel (e) 3 floors. 1st fl: living, dining, kitchen, 2 baths, bedrooms & study, furnace, laundry. 2nd fl: living, dining, kitchen, 2 bathrms, 2 bedrms, study, furnace & laundry. 3rd fl: living, dining, kitchen, 2 baths, 2 bedrms, study, furn, laundry & 4th floor additionDetails
4th floor vert addition & remodel (e) 3 floors. 1st fl: living, dining, kitchen, 2 baths, bedrooms & study, furnace, laundry. 2nd fl: living, dining, kitchen, 2 bathrms, 2 bedrms, study, furnace & laundry. 3rd fl: living, dining, kitchen, 2 baths, 2 bedrms, study, furn, laundry & 4th floor addition | $200,000 | |
| Sep 10, 2008 | Completed final sign-off Dec 2008 | 1527 21st Av | Valex Construction | ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors.Details
ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors. | $38,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 2546 45th Av | Macro Builder Inc | 1st floor remove existing substandard bedroom & (e) furnace & improve for 1 bedroom, 1 bathroom, 1 study room & 1 family room, install new furnace. refer to pa #200808290371 which will comply with nov 20070701979.Details
1st floor remove existing substandard bedroom & (e) furnace & improve for 1 bedroom, 1 bathroom, 1 study room & 1 family room, install new furnace. refer to pa #200808290371 which will comply with nov 20070701979. | $48,000 |
| Aug 6, 2008 | Never finaled issued Jan 2009, no final | 498 Funston Av | revision to appl#200608280775 raising bldg. 2'6" from approved project maintaining existing footing in conjunction with existing footing, add new footing for reinforcement, enlarging the elevator size to comply with ada with some change to bldg plans.Details
revision to appl#200608280775 raising bldg. 2'6" from approved project maintaining existing footing in conjunction with existing footing, add new footing for reinforcement, enlarging the elevator size to comply with ada with some change to bldg plans. | $8,000 | |
| Jul 17, 2008 | Never finaled issued Jul 2008, no final | 1783 32nd Av | 1) to document ceiling hieght at basement level mechanical room at 8'. 2) add 1/2 bath and relocate laundry room at all three units add redesign basement sprinkler mechancal room. revision to app #200411169328 s1. nov 200842915-bid.Details
1) to document ceiling hieght at basement level mechanical room at 8'. 2) add 1/2 bath and relocate laundry room at all three units add redesign basement sprinkler mechancal room. revision to app #200411169328 s1. nov 200842915-bid. | $20,000 | |
| Jun 11, 2008 | Expired or cancelled withdrawn Dec 2008 | 1173 Plymouth Av | front structure: demolition of one story single family dwelling.Details
front structure: demolition of one story single family dwelling. | ||
| Jun 11, 2008 | Expired or cancelled withdrawn Dec 2008 | 1173 Plymouth Av | rear structure: demolition of single family dwelling one story bldg.Details
rear structure: demolition of single family dwelling one story bldg. | ||
| Jun 11, 2008 | Expired or cancelled withdrawn Jan 2009 | 1173 Plymouth Av | construction of two family dwelling three-story wood frame non-rated bldg.Details
construction of two family dwelling three-story wood frame non-rated bldg. | $500,000 | |
| May 30, 2008 | Expired or cancelled expired Aug 2010 | 490 Post St | B W H Builder Inc. | improve existing vacant space of 568 sq ft. , dental office for dental services with 5 working stations, investing space office and unisex toilet. t.i. improvement in (e) building.Details
improve existing vacant space of 568 sq ft. , dental office for dental services with 5 working stations, investing space office and unisex toilet. t.i. improvement in (e) building. | $60,000 |
| May 30, 2008 | Completed final sign-off Jun 2008 | 3625 Lawton St | indicate on floor plans & exiting plan "existing door to adjacent property is to remain" this door will not be use as exit door and not required. previous permit appl. 200712190882, for reference.Details
indicate on floor plans & exiting plan "existing door to adjacent property is to remain" this door will not be use as exit door and not required. previous permit appl. 200712190882, for reference. | ||
| May 30, 2008 | Completed final sign-off Jul 2008 | 743 Cabrillo St | repair, reconstruction of 4 existing stairs and landing (deck) . present stairs are now serving a 2 story apartment bldg. work is to bring stairs up to code for framing, guardrail & handrails. same location (e) stair is visible from street.Details
repair, reconstruction of 4 existing stairs and landing (deck) . present stairs are now serving a 2 story apartment bldg. work is to bring stairs up to code for framing, guardrail & handrails. same location (e) stair is visible from street. | $8,000 | |
| May 20, 2008 | Completed final sign-off Aug 2009 | 3635 Lawton St | 1st floor: build & relocate men & women handicap toilets to replace (e) toilets, construct new kitchen. remodel west side of bldg for baptistry & storage rms. remodel/enlarge (e) gym & construct new 2nd flr for new storage rooms & associated new stairs. all work within the envelope of existing bldg.Details
1st floor: build & relocate men & women handicap toilets to replace (e) toilets, construct new kitchen. remodel west side of bldg for baptistry & storage rms. remodel/enlarge (e) gym & construct new 2nd flr for new storage rooms & associated new stairs. all work within the envelope of existing bldg. | $500,000 | |
| Apr 15, 2008 | Completed final sign-off Sep 2009 | 2009 14th Av | horizontal addition towards the rear of an (e) residence on 1st floor: family bar, and stairs. and outdoor paved patio on 2nd floor. enlarge (e) living room space by adding towards the rear of the building, adding inter connecting stairs & rear deck.Details
horizontal addition towards the rear of an (e) residence on 1st floor: family bar, and stairs. and outdoor paved patio on 2nd floor. enlarge (e) living room space by adding towards the rear of the building, adding inter connecting stairs & rear deck. | $108,000 | |
| Apr 15, 2008 | Expired or cancelled cancelled Jul 2015 | 411 28th Av | add 2 stories over(e) 2 story s.f.d.convert into 2 units.1st flr: retain 2 car parking,bedrm,fam, bath of unit#1. 2nd flr: 2 bedrm,2 baths,liv rm,kit of unit#1. 3rd flr:3 bedrms,2 baths,1 liv,1 kit,bay window & 4th flr:2 bedrm,2 bath,1 fam,deck of unit #2. relocate frt/entry stairs.Details
add 2 stories over(e) 2 story s.f.d.convert into 2 units.1st flr: retain 2 car parking,bedrm,fam, bath of unit#1. 2nd flr: 2 bedrm,2 baths,liv rm,kit of unit#1. 3rd flr:3 bedrms,2 baths,1 liv,1 kit,bay window & 4th flr:2 bedrm,2 bath,1 fam,deck of unit #2. relocate frt/entry stairs. | $400,000 | |
| Mar 31, 2008 | Completed final sign-off Apr 2008 | 905 Grant Av | installation of anodized silver aluminum glass door in place of aluminum glass non handicapped complying store front which was replace w/ permit#200703227020. obtained previously requested storefront & door replacement as required by dbi see attached notice.Details
installation of anodized silver aluminum glass door in place of aluminum glass non handicapped complying store front which was replace w/ permit#200703227020. obtained previously requested storefront & door replacement as required by dbi see attached notice. | $8,000 | |
| Jan 25, 2008 | Completed final sign-off Mar 2010 | 380 18th Av | L B Commercial Construction Inc. | change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac systemDetails
change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac system | $425,000 |
| Jan 22, 2008 | Completed final sign-off Jan 2009 | 1682 47th Av | 1/f: remove existing bedroom, remove existing furnace & water heater, remove concrete & pad where rooms to be improved. add 1 bedroom, bathroom & family room with ceiling ht. of 8'. 2/f: remodel bathroom, kitchen, change floor to 3/4" t & g strip hardwood flooring.Details
1/f: remove existing bedroom, remove existing furnace & water heater, remove concrete & pad where rooms to be improved. add 1 bedroom, bathroom & family room with ceiling ht. of 8'. 2/f: remodel bathroom, kitchen, change floor to 3/4" t & g strip hardwood flooring. | $60,000 | |
| Jan 22, 2008 | Completed final sign-off Jan 2009 | 4220 Irving St | remodel of 1/f & 2/f. 1/f: remove existing bedroom, existing furnace & water heater, improvement on g/f: 1 bedroom, 1 bath & family room. 2/f: remodel bathroom & kitchen & portion of dining room.Details
remodel of 1/f & 2/f. 1/f: remove existing bedroom, existing furnace & water heater, improvement on g/f: 1 bedroom, 1 bath & family room. 2/f: remodel bathroom & kitchen & portion of dining room. | $65,000 | |
| Jan 9, 2008 | Expired or cancelled cancelled Apr 2012 | 23 Midcrest Wy | construct three-story single family dwelling.Details
construct three-story single family dwelling. | $480,000 | |
| Dec 18, 2007 | Completed final sign-off Aug 2008 | 16 Merced Av | Valex Construction | 1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill windowDetails
1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill window | $105,000 |
| Nov 27, 2007 | Completed final sign-off Dec 2008 | 59 Middlefield Dr | Macro Builder Inc | remodle first floor new family /bathroom bedroom deom existing raised floorDetails
remodle first floor new family /bathroom bedroom deom existing raised floor | $45,000 |
| Oct 10, 2007 | Completed final sign-off Jan 2008 | 1200 38th Av | the existing dilapidated stairs is to be replaced in kind with new redwood/pressure treated stairs with similar design & dimensioning.Details
the existing dilapidated stairs is to be replaced in kind with new redwood/pressure treated stairs with similar design & dimensioning. | $8,000 | |
| Sep 27, 2007 | Completed final sign-off Jan 2008 | 125 Cortland Av | New Era Construction Co. ***Check Id**** | improvement of first floor with 1 bedroom, 1 bathroom and upgrade storage. resurface existing deck surface @ 2nd floor. rebuild stair with same existing foot print / plan.Details
improvement of first floor with 1 bedroom, 1 bathroom and upgrade storage. resurface existing deck surface @ 2nd floor. rebuild stair with same existing foot print / plan. | $45,000 |
| Sep 25, 2007 | Completed final sign-off Sep 2011 | 227 07th Av | work to be done @ unit# 227 only. kitchen revision to previously approved pa# 2006/02/02/3683 on 2nd floor. this permit shows minor expansion of previously approved design.Details
work to be done @ unit# 227 only. kitchen revision to previously approved pa# 2006/02/02/3683 on 2nd floor. this permit shows minor expansion of previously approved design. | $2,000 | |
| Sep 13, 2007 | Completed final sign-off Apr 2008 | 1848 24th Av | Hyan Construction Company | 1st floor-remodeling of unimprove area in garage and bedroom to have family room, 2 baths, bedroom, study and office. on the 2nd floor, remodel ex. kitchen and bathroom. add bathroom. work include excavation of 1st floor to increase ceiling height to 8'-0"Details
1st floor-remodeling of unimprove area in garage and bedroom to have family room, 2 baths, bedroom, study and office. on the 2nd floor, remodel ex. kitchen and bathroom. add bathroom. work include excavation of 1st floor to increase ceiling height to 8'-0" | $100,000 |
| Aug 28, 2007 | Completed final sign-off Sep 2012 | 5646 Mission St | change of use from carpet and drapery sales to religious assembly building. providing 2 ada complying handicapped toilets. redesign entrance door for handicapped access minor interior upgrade.Details
change of use from carpet and drapery sales to religious assembly building. providing 2 ada complying handicapped toilets. redesign entrance door for handicapped access minor interior upgrade. | $35,000 | |
| Jul 20, 2007 | Completed final sign-off May 2008 | 1875 26th Av | first floor. removal of existing bath 1/2 and imporve behind parkiing for 1 car sapce with family room study area, 1 bedroom with bathroom. removal of existing interior inteconnecting stair to upper floor replace with code complying hardwood stairsDetails
first floor. removal of existing bath 1/2 and imporve behind parkiing for 1 car sapce with family room study area, 1 bedroom with bathroom. removal of existing interior inteconnecting stair to upper floor replace with code complying hardwood stairs | $48,000 | |
| Jun 27, 2007 | Completed final sign-off Jul 2007 | 155 Upland Dr | change previous permitted storage to entertainment room and 1/2 bath which was in the architectural drawings but not described in appl#200703025391. as built.Details
change previous permitted storage to entertainment room and 1/2 bath which was in the architectural drawings but not described in appl#200703025391. as built. | $8,000 | |
| Jun 20, 2007 | Completed final sign-off Aug 2007 | 3625 Lawton St | remodeling of existing information & foyer area including 2 offices located at front of bldg. to 4 offices & pastor intern station. all work to be done is internal remodeling. no structural work is involved.Details
remodeling of existing information & foyer area including 2 offices located at front of bldg. to 4 offices & pastor intern station. all work to be done is internal remodeling. no structural work is involved. | $12,800 | |
| Jun 15, 2007 | Expired or cancelled withdrawn Apr 2009 | 1635 34th Av | remodel and addition to existing residence of full unimproved garage, bedrooms, living room, dining room, kitchen. proposted plan is to have living room, kitchen, family room, study room, entertainment room, 4 bedrooms, library office 5 bathroomsDetails
remodel and addition to existing residence of full unimproved garage, bedrooms, living room, dining room, kitchen. proposted plan is to have living room, kitchen, family room, study room, entertainment room, 4 bedrooms, library office 5 bathrooms | $250,000 | |
| May 3, 2007 | Completed final sign-off Feb 2009 | 1352 22nd Av | new second story deck & associated stair and railing at rear of building.Details
new second story deck & associated stair and railing at rear of building. | $8,000 | |
| May 2, 2007 | Completed final sign-off Feb 2008 | 800 South Van Ness Av | change of use r-3/b to a-3/r-3. repair of restaurant and bar on first floor due to fire damaged of unknown origin. upgrade toilets stair and railing to meet handicap ada requirements. no structural work.Details
change of use r-3/b to a-3/r-3. repair of restaurant and bar on first floor due to fire damaged of unknown origin. upgrade toilets stair and railing to meet handicap ada requirements. no structural work. | $80,000 | |
| Feb 28, 2007 | Completed final sign-off Jun 2007 | 491 Rolph St | rectification of nov# 200685435-removal of kitchennette and appliances on ground floor. provide complying with code vertilation for study room. closing off windows, installed within 3ft of property line without benefit of building permit. 1st floor to have 1 bedroom, study and bathroom.Details
rectification of nov# 200685435-removal of kitchennette and appliances on ground floor. provide complying with code vertilation for study room. closing off windows, installed within 3ft of property line without benefit of building permit. 1st floor to have 1 bedroom, study and bathroom. | $5,000 | |
| Feb 16, 2007 | Completed final sign-off May 2007 | 2535 Taraval St | submit plans for correction of violation # 200686655. two doors were installed without the benefit of opbtaining a building permit in a massage facility with 3 treatment rooms, toilet and reception area. permit obtain with prior pa# 200508029169.Details
submit plans for correction of violation # 200686655. two doors were installed without the benefit of opbtaining a building permit in a massage facility with 3 treatment rooms, toilet and reception area. permit obtain with prior pa# 200508029169. | $500 | |
| Feb 2, 2007 | Expired or cancelled expired Oct 2009 | 1773 14th Av | remodeling of extg 2nd floor converting extg master bedroom and study to office/guest room and family room. adding 3rd floor of 495 sq ft consisting of master bedroom, master bath closet and a small office.Details
remodeling of extg 2nd floor converting extg master bedroom and study to office/guest room and family room. adding 3rd floor of 495 sq ft consisting of master bedroom, master bath closet and a small office. | $128,000 | |
| Dec 7, 2006 | Completed final sign-off May 2009 | 555 20th Av | Great River Construction Inc. | remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck.Details
remodel rear of bldg &add towards rear of bldg modify plans to have:1st fl-2 car parking spaces, study room, family room, bedroom,library&bath. 2nd fl-living room, entertainment room, study, office,kitche,deck. 3rd fl,unit #2 - living room, dining room,office,kitchen,bathroom and deck. | $160,000 |
| Dec 6, 2006 | Expired or cancelled cancelled Jan 2015 | 2414 30th Av | add 2 floors on top of(e)bldg. & also horizontal addition towards rear yard. completed building to have: 1/f- 520 sq.ft. of office space & 2 car garage.2/f resident-unit#1 with living room, dining room, kitchen, sutdy room, 2 bedroom, 2 baths.3/f unit#2-living room,ktichen,2 baths & 2 bedrooms.Details
add 2 floors on top of(e)bldg. & also horizontal addition towards rear yard. completed building to have: 1/f- 520 sq.ft. of office space & 2 car garage.2/f resident-unit#1 with living room, dining room, kitchen, sutdy room, 2 bedroom, 2 baths.3/f unit#2-living room,ktichen,2 baths & 2 bedrooms. | $400,000 | |
| Sep 8, 2006 | Completed final sign-off Mar 2007 | 1065 Pacheco St | provide study room in basement space in main floor. remodel bath room and storage to 2 bath rooms, remodeling kchn. replace stair with oakstair. upper floor: remodel bathroom, remdel extg bedroom and study room to master bedroom. replace roofing. repair driveway to garage. provide conc topping toDetails
provide study room in basement space in main floor. remodel bath room and storage to 2 bath rooms, remodeling kchn. replace stair with oakstair. upper floor: remodel bathroom, remdel extg bedroom and study room to master bedroom. replace roofing. repair driveway to garage. provide conc topping to | $48,000 | |
| Aug 28, 2006 | Never finaled issued Jan 2008, no final | 498 Funston Av | bmt: excavate 2 small unexcavated spaces to have a clear ceiling height of 9'. excavate & remodel sunday school rooms from 7'0 to 9' ceiling ht. add new stairs & provide elevator to this level. 1st fl-provide exterior ramp, elevator, stair, remodel kitchen. 2nd floor: in fill deck area for office.Details
bmt: excavate 2 small unexcavated spaces to have a clear ceiling height of 9'. excavate & remodel sunday school rooms from 7'0 to 9' ceiling ht. add new stairs & provide elevator to this level. 1st fl-provide exterior ramp, elevator, stair, remodel kitchen. 2nd floor: in fill deck area for office. | $1,200,000 | |
| Jul 14, 2006 | Completed final sign-off Apr 2007 | 1549 35th Av | 1st floor: remodel laundry room to office, remodel master bathroom & bedroom, add storage room in garage space. 2nd floor: remodel kitchen, remodel bathroom to 2 bathrooms. replace cabinet in breakfast room. in year yard pave & tile upper level of rear yard at (e) grade level.Details
1st floor: remodel laundry room to office, remodel master bathroom & bedroom, add storage room in garage space. 2nd floor: remodel kitchen, remodel bathroom to 2 bathrooms. replace cabinet in breakfast room. in year yard pave & tile upper level of rear yard at (e) grade level. | $70,000 | |
| Jun 22, 2006 | Completed final sign-off Nov 2007 | 2126 27th Av | on 2/f of building: add 1 bedroom, 1 family room and 1 bath and 2 light wells, walls added on 1/f is for structural support only because of inadequate ceiling height for habitable room.Details
on 2/f of building: add 1 bedroom, 1 family room and 1 bath and 2 light wells, walls added on 1/f is for structural support only because of inadequate ceiling height for habitable room. | $50,000 | |
| Jun 16, 2006 | Completed final sign-off Jul 2008 | 1917 Cabrillo St | add a family room & stairs of 3/8 sq.ft. in rear yard. on grade of rear yard and add a master bedroom, bathroom and closet on top of (e) bldg, 3/f as view from street.Details
add a family room & stairs of 3/8 sq.ft. in rear yard. on grade of rear yard and add a master bedroom, bathroom and closet on top of (e) bldg, 3/f as view from street. | $115,000 | |
| Jun 16, 2006 | Expired or cancelled expired Feb 2009 | 70 Elmhurst Dr | 1st floor - add foyer of 79 sq ft. 2nd floor - add study room to replace existing deck. study room area=193 sq.ft.Details
1st floor - add foyer of 79 sq ft. 2nd floor - add study room to replace existing deck. study room area=193 sq.ft. | $35,000 | |
| Dec 14, 2005 | Completed final sign-off Mar 2006 | 3519 Lawton St | remodeling of (e) first floor family room, powder room and laundry area. to have family room, bedroom, bath room storage.Details
remodeling of (e) first floor family room, powder room and laundry area. to have family room, bedroom, bath room storage. | $38,000 | |
| Dec 5, 2005 | Completed final sign-off Dec 2006 | 1459 22nd Av | horizontal addition, add a bedroom to replace & (e) deck, add on the side of the living room & remodeling portion of the residence. modified plans to have on 1st floor; garage, family room, bedroom, bath & study. 2nd floor: 3 bedrooms, 2 baths, kitchen, dining & living & small deck.Details
horizontal addition, add a bedroom to replace & (e) deck, add on the side of the living room & remodeling portion of the residence. modified plans to have on 1st floor; garage, family room, bedroom, bath & study. 2nd floor: 3 bedrooms, 2 baths, kitchen, dining & living & small deck. | $78,000 | |
| Oct 31, 2005 | Completed final sign-off May 2006 | 1677 11th Av | with (e)envelope of 1/f,provide improvement of following rooms.family room,storage room,utility room,bedroom,bathroom,closet & inter-connecting stairs to upper floor-2/fDetails
with (e)envelope of 1/f,provide improvement of following rooms.family room,storage room,utility room,bedroom,bathroom,closet & inter-connecting stairs to upper floor-2/f | $36,000 | |
| Oct 6, 2005 | Completed final sign-off Mar 2006 | 1398 19th Av | All City Builder Corp (Check Lic) | rev.appl#200406075696r1for which permit was issued - rev. on 1st floor is to to add sprinkler room,enclose utility room.revision to 2/f by removal of additional walls.exterior changes along judah,elimination of 2 small windows.Details
rev.appl#200406075696r1for which permit was issued - rev. on 1st floor is to to add sprinkler room,enclose utility room.revision to 2/f by removal of additional walls.exterior changes along judah,elimination of 2 small windows. | $3,000 |
| Oct 5, 2005 | Expired or cancelled cancelled Mar 2006 | 227 07th Av | 1/f-remodel (e) br.& study.2/f,3/f-remodel kitchen,bathroom,add new bathroom(interior remodeling) all work is within (e)envelope of (e)bldg.Details
1/f-remodel (e) br.& study.2/f,3/f-remodel kitchen,bathroom,add new bathroom(interior remodeling) all work is within (e)envelope of (e)bldg. | $70,000 | |
| Jun 15, 2005 | Completed final sign-off Oct 2006 | 5032 Mission St | remodel (e)com'l g/f space used as hair salon & offices on 1/f of (e) bldg.upgrade facility to compl with ada req such as providig handicapped accessible toilets, doors, etc.Details
remodel (e)com'l g/f space used as hair salon & offices on 1/f of (e) bldg.upgrade facility to compl with ada req such as providig handicapped accessible toilets, doors, etc. | $65,000 | |
| Apr 18, 2005 | Completed final sign-off Sep 2005 | 842 44th Av | remodel first fl to have family, study & bathroom.Details
remodel first fl to have family, study & bathroom. | $68,000 | |
| Apr 18, 2005 | Completed final sign-off Mar 2006 | 1680 Post St | expanding (e) hair salon of 539 sq. ft into adjacent vacant office space of 639 sq. ft.Details
expanding (e) hair salon of 539 sq. ft into adjacent vacant office space of 639 sq. ft. | $41,100 | |
| Jan 27, 2005 | Completed final sign-off Jan 2009 | 899 27th Av | Curran & Associates General Contractors | coverting and addition to (e) single family residence.1st/fl-2 bedroom, bath &family room. 2nd/fl- 2 bedrooms, study, 2 bath. kitchen dining room living room. 3rd/fl-master bedroom, 1 bath.Details
coverting and addition to (e) single family residence.1st/fl-2 bedroom, bath &family room. 2nd/fl- 2 bedrooms, study, 2 bath. kitchen dining room living room. 3rd/fl-master bedroom, 1 bath. | $300,000 |