Permit GraphShortlistSan Francisco building permits since 2000

Block 1449, lot 021B

382 18th Ave

City’s use
Commercial Misc
Built
1925
Stories
3
Units
1
Rooms
4 bathrooms
Building
8,550 sq ft
Lot
3,636 sq ft
Zoning
C2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 19, 2018Never finaled
issued Jan 2018, no final
382 18th Avstreet space
Details
Permit
M878687
Status
issued
Filed
Jan 19, 2018
Permit issued
Jan 19, 2018
Address
382 18th Av

street space

Open the permit page

Mar 24, 2010Never finaled
issued Mar 2010, no final
380 18th AvThorpe Design Incfire sprinkler as-builts, add 14 heads, ref. appl. #2009/0713/2453.
Details
Permit
201003248894
Status
issued
Filed
Mar 24, 2010
Permit issued
Mar 25, 2010
Address
380 18th Av

fire sprinkler as-builts, add 14 heads, ref. appl. #2009/0713/2453.

Open the permit page

Mar 17, 2010Completed
final sign-off May 2010
382 18th AvSan Francisco Fire Protectionrevision to appl. #200910148945. as builts to reflect the removal of the point module for the ansul system that is not there anymore & to add 2-smoke detectors. field verify that type-1 hood in kitchen was removed along with the ansul system.
Details
Permit
201003178419
Status
complete
Filed
Mar 17, 2010
Permit issued
Mar 17, 2010
Final sign-off
May 4, 2010
Declared cost
$300
Address
382 18th Av

revision to appl. #200910148945. as builts to reflect the removal of the point module for the ansul system that is not there anymore & to add 2-smoke detectors. field verify that type-1 hood in kitchen was removed along with the ansul system.

Open the permit page

$300
Dec 9, 2009Completed
final sign-off Apr 2010
380 18th AvL B Commercial Construction Inc.revision to 200801253314-s1, changes to electrical plan, page e2-add receptacles for stage lighting & page e5-new 400 amp main switch board & 2 sub panels
Details
Permit
200912092938
Status
complete
Filed
Dec 9, 2009
Permit issued
Dec 9, 2009
Final sign-off
Apr 8, 2010
Declared cost
$20,000
Address
380 18th Av

revision to 200801253314-s1, changes to electrical plan, page e2-add receptacles for stage lighting & page e5-new 400 amp main switch board & 2 sub panels

Open the permit page

$20,000
Oct 14, 2009Completed
final sign-off May 2010
380 18th AvSan Francisco Fire Protectionfirsy floor. install 1 fire panel, 1 annunciator, 9 smoke detector, 1 manual pull station, 3 input modules, 17 horn/strobes, 12 strobes, and 2 door holders
Details
Permit
200910148945
Status
complete
Filed
Oct 14, 2009
Permit issued
Oct 15, 2009
Final sign-off
May 4, 2010
Declared cost
$13,000
Address
380 18th Av

firsy floor. install 1 fire panel, 1 annunciator, 9 smoke detector, 1 manual pull station, 3 input modules, 17 horn/strobes, 12 strobes, and 2 door holders

Open the permit page

$13,000
Jul 13, 2009Never finaled
issued Jul 2009, no final
380 18th AvThorpe Design Incadd 160 fire sprinkler heads on all floors. pa# 2008.01.25.3314 for arch, struc reference.
Details
Permit
200907132453
Status
issued
Filed
Jul 13, 2009
Permit issued
Jul 14, 2009
Declared cost
$31,000
Address
380 18th Av

add 160 fire sprinkler heads on all floors. pa# 2008.01.25.3314 for arch, struc reference.

Open the permit page

$31,000
May 6, 2009Never finaled
issued Oct 2009, no final
380 18th AvThorpe Design Incunderground for fire sprinkler system. we are installing the underground from the extg city mian to the riser for the assembley hall. over head sprinkler under separate permit. ref pa# 2008.01.25.3314 for arch/struc reference.
Details
Permit
200905067815
Status
issued
Filed
May 6, 2009
Permit issued
Oct 8, 2009
Declared cost
$14,000
Address
380 18th Av

underground for fire sprinkler system. we are installing the underground from the extg city mian to the riser for the assembley hall. over head sprinkler under separate permit. ref pa# 2008.01.25.3314 for arch/struc reference.

Open the permit page

$14,000
Jan 25, 2008Completed
final sign-off Mar 2010
380 18th AvL B Commercial Construction Inc.change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac system
Details
Permit
200801253314
Status
complete
Filed
Jan 25, 2008
Permit issued
Jul 9, 2009
Final sign-off
Mar 25, 2010
Declared cost
$425,000
Address
380 18th Av

change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac system

Open the permit page

$425,000
Oct 18, 2006Never finaled
issued Oct 2006, no final
380 18th Avstreet space and sidewalk permit
Details
Permit
M45384
Status
issued
Filed
Oct 18, 2006
Permit issued
Oct 18, 2006
Address
380 18th Av

street space and sidewalk permit

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Thorpe Design Inc (3), L B Commercial Construction Inc. (2), San Francisco Fire Protection (2)
Architects
Lincoln Lue

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.