L B Commercial Construction Inc.
- Based in
- Sunnyvale
- On San Francisco permits
- Jan 2008 to Feb 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2022 | Completed final sign-off Feb 2022 | 1770 46th Av | remove damaged railing from decorative non-occupiable balcony @ front of house, remove siding to verify how far tile damage. to comply with bid nov#202286841Details
remove damaged railing from decorative non-occupiable balcony @ front of house, remove siding to verify how far tile damage. to comply with bid nov#202286841 | $1,200 |
| Jan 17, 2018 | Completed final sign-off Aug 2018 | 3251 20th Av | suite 158: t.i. for empty space in stonestown mall. work includes new walls ceilings, finishes, restrooms, mep. fire protection under seperate permits.Details
suite 158: t.i. for empty space in stonestown mall. work includes new walls ceilings, finishes, restrooms, mep. fire protection under seperate permits. | $300,000 |
| Apr 27, 2012 | Completed final sign-off Apr 2012 | 2400 Noriega St | revision to foundation on a line a at sheet s2.1 for existing permit 200912304027Details
revision to foundation on a line a at sheet s2.1 for existing permit 200912304027 | |
| Dec 30, 2009 | Completed final sign-off May 2011 | 2400 Noriega St | demolish a 2 story chruchDetails
demolish a 2 story chruch | $15,000 |
| Dec 30, 2009 | Completed final sign-off Apr 2012 | 2400 Noriega St | new construction of a three-story church ( lutheran church of the holy spirit). demo under separate permit.Details
new construction of a three-story church ( lutheran church of the holy spirit). demo under separate permit. | $3,000,000 |
| Dec 9, 2009 | Completed final sign-off Apr 2010 | 380 18th Av | revision to 200801253314-s1, changes to electrical plan, page e2-add receptacles for stage lighting & page e5-new 400 amp main switch board & 2 sub panelsDetails
revision to 200801253314-s1, changes to electrical plan, page e2-add receptacles for stage lighting & page e5-new 400 amp main switch board & 2 sub panels | $20,000 |
| May 20, 2009 | Completed final sign-off Mar 2010 | 378 18th Av | create communicating opening between subject property(378 18th ave) and adjacent property(380 18th ave). second floor: provide 90 minute fire rated door with magnetic hold open device and ramp to circumvent floor height differences. 3rd floor:provide 90 minute rated door with hold open device.Details
create communicating opening between subject property(378 18th ave) and adjacent property(380 18th ave). second floor: provide 90 minute fire rated door with magnetic hold open device and ramp to circumvent floor height differences. 3rd floor:provide 90 minute rated door with hold open device. | $10,000 |
| Jan 25, 2008 | Completed final sign-off Mar 2010 | 380 18th Av | change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac systemDetails
change use from assembly hall to church and support facilities. 1st fl: 6 bible study rooms, book store, handicapped accessible toilets. 2nd flr: sanctuary, kitchenette, converence room, toilet rooms. 3rd floor meeting room, bathroom, and guest room. update hvac system | $425,000 |