George Edward Perrenod Jr Martin Fernando Romo
- Listed as
- authorized agent-others, contractor
- Firm
- Community Reconstruction Solutions
- Based in
- Burlingame
- On San Francisco permits
- May 2007 to Jul 2026
178 permits since 2000 (contractor on 178 permits, authorized agent-others on 3 permits): 156 completed, 2 in progress, 14 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 13, 2026 | Completed final sign-off Jul 2026 | 1391 Clayton St | Community Reconstruction Solutions | to obtain final inspection for work approved under pa# 201605066763 & 201606160091. all work is complete.Details
to obtain final inspection for work approved under pa# 201605066763 & 201606160091. all work is complete. | |
| Jan 30, 2026 | Completed final sign-off Jun 2026 | 1904 Lyon St | Community Reconstruction Solutions | exterior renovations. remove & replace deck coating on street facing side with westcoatsystem. remove & replace lap siding and cedar shingles associated with scope. sliding door is (e). install associated metal flashing, slider door pan and metal rail cap. misc wood repair, paint to match. in kind,Details
exterior renovations. remove & replace deck coating on street facing side with westcoatsystem. remove & replace lap siding and cedar shingles associated with scope. sliding door is (e). install associated metal flashing, slider door pan and metal rail cap. misc wood repair, paint to match. in kind, | $11,922 |
| Dec 5, 2025 | Completed final sign-off Mar 2026 | 75 Ora Wy | Community Reconstruction Solutions | remove and replace siding and trims at window outcrop. install hardie siding, replace 4 windows, 3 living room out crop, 1 bedroom. 200 sq ft, non street visible. like for like.u<0.3.Details
remove and replace siding and trims at window outcrop. install hardie siding, replace 4 windows, 3 living room out crop, 1 bedroom. 200 sq ft, non street visible. like for like.u<0.3. | $18,851 |
| Dec 5, 2025 | Completed final sign-off Jul 2026 | 80 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims at window outcrop. install new hardie siding, replace 6 windows, 4 living room, 1 bedroom, 1 loft. 200 sq ft, like for like, non street visible windows. u<0.3.Details
remove and replace exterior siding and trims at window outcrop. install new hardie siding, replace 6 windows, 4 living room, 1 bedroom, 1 loft. 200 sq ft, like for like, non street visible windows. u<0.3. | $23,335 |
| Nov 21, 2025 | Completed final sign-off Mar 2026 | 80 Ora Wy | Community Reconstruction Solutions | units #108, #208 & #308: remove & replace (e) sliding & trims at window outcrop. install (n) hardie siding panels & trims. windows to be replaced @unit 208 (4) total: (3) at outcrop + (1) bedroom & unit 308 (6) windows total @ living room & bedroom. total window in scope (8) windows.Details
units #108, #208 & #308: remove & replace (e) sliding & trims at window outcrop. install (n) hardie siding panels & trims. windows to be replaced @unit 208 (4) total: (3) at outcrop + (1) bedroom & unit 308 (6) windows total @ living room & bedroom. total window in scope (8) windows. | $35,971 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 80 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims at window outcrop. install new hardie panels, new siding material and trims. windows are existing. paint to match existing. 200 sqft total. no size change, like for like, hoa project. not visible from street.Details
remove and replace exterior siding and trims at window outcrop. install new hardie panels, new siding material and trims. windows are existing. paint to match existing. 200 sqft total. no size change, like for like, hoa project. not visible from street. | $4,383 |
| Nov 12, 2025 | Completed final sign-off Mar 2026 | 80 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims at window outcrop. install new hardie panels, new siding material and trims. windows to be replace @ unit 106, 3 windows at outcrop & 1 bedroom window; unit 206 & 306 windows are existing. paint to match existing 500 sqft total. no size change, like forDetails
remove and replace exterior siding and trims at window outcrop. install new hardie panels, new siding material and trims. windows to be replace @ unit 106, 3 windows at outcrop & 1 bedroom window; unit 206 & 306 windows are existing. paint to match existing 500 sqft total. no size change, like for | $19,298 |
| Aug 26, 2025 | Completed final sign-off Mar 2026 | 945 Union St | Community Reconstruction Solutions | exterior renovations and painting. remove and replace deck coating at (2) selected balconies (2w and 3w). misc. wood repair at (2) selected units (3w, 1e). install misc sheet metal. paint to match. like in kind. same size, same locations. common area project by hoa.Details
exterior renovations and painting. remove and replace deck coating at (2) selected balconies (2w and 3w). misc. wood repair at (2) selected units (3w, 1e). install misc sheet metal. paint to match. like in kind. same size, same locations. common area project by hoa. | $36,806 |
| May 23, 2025 | Completed final sign-off Sep 2025 | 3315 Fillmore St | Community Reconstruction Solutions | replace 9 total windows at rear facing elevation. demo stucco around window. patch and paint to match existing. like for like in kind, size same, same location. hoa project, not visible from street.Details
replace 9 total windows at rear facing elevation. demo stucco around window. patch and paint to match existing. like for like in kind, size same, same location. hoa project, not visible from street. | $9,996 |
| Apr 11, 2025 | In progress issued Apr 2025 | 590 06th St | Community Reconstruction Solutions | unit 202: demo select exterior facade. install door pan at exterior door.Details
unit 202: demo select exterior facade. install door pan at exterior door. | $4,000 |
| Apr 11, 2025 | Completed final sign-off Jun 2025 | 590 06th St | Community Reconstruction Solutions | unit 201: demo select exterior facade. install door pan at exterior door.Details
unit 201: demo select exterior facade. install door pan at exterior door. | $4,000 |
| Apr 8, 2025 | Completed final sign-off Nov 2025 | 3250 16th St | Community Reconstruction Solutions | exterior siding left elevation repairs, remove and replace left elevation siding, install weather barrier, rain leader and scupper, paint to match existing, like in kind replacement, no changes to sizes or locationDetails
exterior siding left elevation repairs, remove and replace left elevation siding, install weather barrier, rain leader and scupper, paint to match existing, like in kind replacement, no changes to sizes or location | $15,220 |
| Apr 8, 2025 | Completed final sign-off Nov 2025 | 1839 15th St | Community Reconstruction Solutions | common area. exterior selected stucco elevation repairs and 4 windows remove and replace selected stucco elevation at windows, relace 4 windows water protect around windows patch to match (e) like in kind replacement, no change in size or location not visible from streetDetails
common area. exterior selected stucco elevation repairs and 4 windows remove and replace selected stucco elevation at windows, relace 4 windows water protect around windows patch to match (e) like in kind replacement, no change in size or location not visible from street | $26,390 |
| Mar 26, 2025 | Completed final sign-off Aug 2025 | 921 Bosworth St | Community Reconstruction Solutions | unit #08: exterior window replacement. remove and replace 3rd fl. 3 windows total. (2) 29.5x59.5 f, (1) 47.5 x 59.5 xo. replace siding and trims. paint to match (e) like in kind replacement, no change to size or location. replace with fiberglass.Details
unit #08: exterior window replacement. remove and replace 3rd fl. 3 windows total. (2) 29.5x59.5 f, (1) 47.5 x 59.5 xo. replace siding and trims. paint to match (e) like in kind replacement, no change to size or location. replace with fiberglass. | $6,309 |
| Feb 7, 2025 | Completed final sign-off Apr 2025 | 45 Ora Wy | Community Reconstruction Solutions | unit #103: remove and replace bedroom window (1) 72x60x0, living (1) 90x80x0 slider, (2) 20x60f. - total 4. remove and replace affected shingles and trim. pain to match existing. like in kind. same size, same location. not street facing.Details
unit #103: remove and replace bedroom window (1) 72x60x0, living (1) 90x80x0 slider, (2) 20x60f. - total 4. remove and replace affected shingles and trim. pain to match existing. like in kind. same size, same location. not street facing. | $8,317 |
| Dec 20, 2024 | Completed final sign-off Mar 2025 | 65 Ora Wy | Community Reconstruction Solutions | unit #301: remove and replace bedroom windows (1) 72x60 left (1) 96x35, living room (1) 137x58, (1) 71x58, (1) 19x63 (1) 53x27 - 6 total. (hoa work; remove and replace affected shingles). paint & match existing. like in kind. same size. windows to be milgard ultra c650 fiberglass.Details
unit #301: remove and replace bedroom windows (1) 72x60 left (1) 96x35, living room (1) 137x58, (1) 71x58, (1) 19x63 (1) 53x27 - 6 total. (hoa work; remove and replace affected shingles). paint & match existing. like in kind. same size. windows to be milgard ultra c650 fiberglass. | $7,852 |
| Oct 23, 2024 | Completed final sign-off Dec 2024 | 725 Florida St | Community Reconstruction Solutions | exterior repairs. parapet cap flashing tie in, demo 8"+- stucco assemble, install s.s cap flashing 20 lft.paint to match existingDetails
exterior repairs. parapet cap flashing tie in, demo 8"+- stucco assemble, install s.s cap flashing 20 lft.paint to match existing | $7,202 |
| Aug 2, 2024 | In progress filed Aug 2024, not yet issued | 3315 Fillmore St | Community Reconstruction Solutions | unit #302: perform forensic exploratory demo at rear facing elevation. stucco demo and close up in kind after exploration. approximate 80% of facade (750sf). not visible from street.Details
unit #302: perform forensic exploratory demo at rear facing elevation. stucco demo and close up in kind after exploration. approximate 80% of facade (750sf). not visible from street. | $8,000 |
| Aug 1, 2024 | Completed final sign-off Jan 2025 | 1826 Eddy St | Community Reconstruction Solutions | exterior stucco repair: front of bldg- remove and replace 2/f and 3/f of bldg stucco elevation. 1/f omitted. demo 18" +- stucco around window/door. waterproof around windows and doors, patch to match (e). paint to match (e). like in-kind replacement, no changes to size or location 668sf.Details
exterior stucco repair: front of bldg- remove and replace 2/f and 3/f of bldg stucco elevation. 1/f omitted. demo 18" +- stucco around window/door. waterproof around windows and doors, patch to match (e). paint to match (e). like in-kind replacement, no changes to size or location 668sf. | $24,545 |
| Jul 26, 2024 | Completed final sign-off Sep 2025 | 3315 Fillmore St | Community Reconstruction Solutions | unit #302: perform forensic exploratory demo at street facing elevation. stucco demo and close up in kind after exploration. approximate 80% of front facade (750sf)Details
unit #302: perform forensic exploratory demo at street facing elevation. stucco demo and close up in kind after exploration. approximate 80% of front facade (750sf) | $5,000 |
| Jun 12, 2024 | Completed final sign-off Aug 2024 | 65 Ora Wy | Community Reconstruction Solutions | remove and replace 1 bedroom window. 72*60, remove and replace affected shingles. paint to match existing. like in kind, same size.Details
remove and replace 1 bedroom window. 72*60, remove and replace affected shingles. paint to match existing. like in kind, same size. | $3,252 |
| Jun 5, 2024 | Completed final sign-off Sep 2024 | 55 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims at window outcrop, install new hardie panels and trims, remove and replace (10) windows and (1) slider door total, paint to match (e) 572 sqft total no size change, like in kind hoa projectDetails
remove and replace exterior siding and trims at window outcrop, install new hardie panels and trims, remove and replace (10) windows and (1) slider door total, paint to match (e) 572 sqft total no size change, like in kind hoa project | $19,835 |
| Sep 28, 2023 | Completed final sign-off Mar 2024 | 45 Ora Wy | Community Reconstruction Solutions | remove/replace exterior windows, siding & time, 4 windows. install new hardie panels & trims. paint to match existing. windows are like to like, same location, same size, rear windowDetails
remove/replace exterior windows, siding & time, 4 windows. install new hardie panels & trims. paint to match existing. windows are like to like, same location, same size, rear window | $9,203 |
| Sep 28, 2023 | Completed final sign-off Mar 2024 | 45 Ora Wy | Community Reconstruction Solutions | remove/replace exterior windows, siding & time, 5 windows. install new hardie panels & trims. paint to match existing. windows are like to like, same location, same size, rear windowsDetails
remove/replace exterior windows, siding & time, 5 windows. install new hardie panels & trims. paint to match existing. windows are like to like, same location, same size, rear windows | $9,203 |
| Aug 17, 2023 | Completed final sign-off Jul 2024 | 1310 Fulton St | Community Reconstruction Solutions | remove and replace 8 metal door and frame at ground level. 3 entrance, 5 utilities door and frame. same size, same location. like for like.Details
remove and replace 8 metal door and frame at ground level. 3 entrance, 5 utilities door and frame. same size, same location. like for like. | $28,971 |
| May 8, 2023 | Completed final sign-off Aug 2024 | 1310 Fulton St | Community Reconstruction Solutions | exterior and sliding door replacement: replacement of all residential windows and sliding doors at 2nd and 3rd floor of bldg. 1st floor omitted. total of 18 residential units, units# 201-209 and #301-309. total of 131 windows and 10 slider doors. demo 18" stucco around window/slider doors. replace..Details
exterior and sliding door replacement: replacement of all residential windows and sliding doors at 2nd and 3rd floor of bldg. 1st floor omitted. total of 18 residential units, units# 201-209 and #301-309. total of 131 windows and 10 slider doors. demo 18" stucco around window/slider doors. replace.. | $111,271 |
| Jan 23, 2023 | Completed final sign-off Feb 2023 | 4155 Cesar Chavez St | Community Reconstruction Solutions | to obtain final inspection for work approved under pa# 201607142308. all work is complete.Details
to obtain final inspection for work approved under pa# 201607142308. all work is complete. | |
| Dec 7, 2022 | Completed final sign-off Sep 2024 | 200 Portola Dr | Community Reconstruction Solutions | exterior renovations: balcony restorations at 10 locations (3201, 101, 202a, 202b, 102a, 102b, 230, 201 garage side, 101 garage side, 270). deni 12" + stucco perimeter, demo deck membrane, install westcoast pro system, install flashings, install deck drain, paint to match. topcoat balconies (7)totalDetails
exterior renovations: balcony restorations at 10 locations (3201, 101, 202a, 202b, 102a, 102b, 230, 201 garage side, 101 garage side, 270). deni 12" + stucco perimeter, demo deck membrane, install westcoast pro system, install flashings, install deck drain, paint to match. topcoat balconies (7)total | $63,368 |
| Nov 15, 2022 | Completed final sign-off Mar 2023 | 85 Ora Wy | Community Reconstruction Solutions | remove and replace bedroom window (1) 72" x 60". remove and replace affected shingles. paint to match existing. like in kind. not street visible. max u-factor 0.30.Details
remove and replace bedroom window (1) 72" x 60". remove and replace affected shingles. paint to match existing. like in kind. not street visible. max u-factor 0.30. | $1,957 |
| Jun 21, 2022 | Completed final sign-off Jul 2022 | 590 06th St | Community Reconstruction Solutions | common area: remove and replace (e) 7 skylights in common area roof level. match existing. not visible from street, flat roof. max u-factor = 0.58Details
common area: remove and replace (e) 7 skylights in common area roof level. match existing. not visible from street, flat roof. max u-factor = 0.58 | $1,978 |
| Mar 3, 2022 | Completed final sign-off Sep 2022 | 95 Ora Wy | Community Reconstruction Solutions | remove and replace 1 slider door and 1 single hung window. match existing material. like for kind. thermally aluminum window. visible street. tied to permit #202105190578 for the exterior trims replacement scope.Details
remove and replace 1 slider door and 1 single hung window. match existing material. like for kind. thermally aluminum window. visible street. tied to permit #202105190578 for the exterior trims replacement scope. | $2,314 |
| Feb 15, 2022 | Completed final sign-off Jul 2022 | 1839 15th St | Community Reconstruction Solutions | unit 252: remove and replace bedroom window (1) 30"x60" in kind. remove and replace 12" +-stuco around window paint to matchDetails
unit 252: remove and replace bedroom window (1) 30"x60" in kind. remove and replace 12" +-stuco around window paint to match | $2,268 |
| Jan 28, 2022 | Completed final sign-off Sep 2022 | 45 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims. install new hardie panels and trims. paint to match existing. 500 sq ft total.Details
remove and replace exterior siding and trims. install new hardie panels and trims. paint to match existing. 500 sq ft total. | $5,890 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 1839 15th St | Community Reconstruction Solutions | units: 151, 251, 252, 352, 351, 452, 451: remove and replace kitchen windows (7) 48x42 in-kind. remove and replace wall elevation, siding and trims. paint to match existing. non street facing. max u-factor = 0.58 per cec 141.0(b)2ai exception 1Details
units: 151, 251, 252, 352, 351, 452, 451: remove and replace kitchen windows (7) 48x42 in-kind. remove and replace wall elevation, siding and trims. paint to match existing. non street facing. max u-factor = 0.58 per cec 141.0(b)2ai exception 1 | $17,847 |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 95 Ora Wy | Community Reconstruction Solutions | remove and replace 1 window and 1 fix window. match existing material thermally aluminum window. tied to exterior trims replacement scope.Details
remove and replace 1 window and 1 fix window. match existing material thermally aluminum window. tied to exterior trims replacement scope. | $1,257 |
| Jan 4, 2022 | Completed final sign-off Apr 2022 | 85 Ora Wy | Community Reconstruction Solutions | remove and replace bedroom window (1) 72" x 60". remove and replace affected wood shingles. paint to match existing. like in kind. street visible. max. u-factor = 0.40 (replacement).Details
remove and replace bedroom window (1) 72" x 60". remove and replace affected wood shingles. paint to match existing. like in kind. street visible. max. u-factor = 0.40 (replacement). | $7,110 |
| Jan 4, 2022 | Completed final sign-off Sep 2022 | 95 Ora Wy | Community Reconstruction Solutions | remove and replace exterior siding and trims. install new hardie panels and trims. paint to match existing. 1400 sq ft total. common area.Details
remove and replace exterior siding and trims. install new hardie panels and trims. paint to match existing. 1400 sq ft total. common area. | $6,412 |
| Jun 2, 2021 | Never finaled issued Jun 2021, no final | 95 Ora Wy | Community Reconstruction Solutions | remove and replace 1 slider door and 1 fix window. match existing material thermally aluminum window. visible from street. ( replace in-kind) tied to pa# 202105190578 for teh exterior trims replacement scope.Details
remove and replace 1 slider door and 1 fix window. match existing material thermally aluminum window. visible from street. ( replace in-kind) tied to pa# 202105190578 for teh exterior trims replacement scope. | $1,789 |
| Jun 2, 2021 | Completed final sign-off Oct 2021 | 95 Ora Wy | Community Reconstruction Solutions | remove and replace 1 window and 1 fix window. match existing material thermally aluminum window. visible from street. ( replace in-kind) tied to pa# 202105190578 for teh exterior trims replacement scope.Details
remove and replace 1 window and 1 fix window. match existing material thermally aluminum window. visible from street. ( replace in-kind) tied to pa# 202105190578 for teh exterior trims replacement scope. | $1,257 |
| May 19, 2021 | Completed final sign-off Oct 2021 | 95 Ora Wy | Community Reconstruction Solutions | unit# 107, 207, 307, 109, 209, 307. remove and replace exterior siding and trims. install new hardie panels & trims. paint to match existing 1400 sq ft total.Details
unit# 107, 207, 307, 109, 209, 307. remove and replace exterior siding and trims. install new hardie panels & trims. paint to match existing 1400 sq ft total. | $6,412 |
| Apr 12, 2021 | Never finaled issued Apr 2021, no final | 725 Florida St | Community Reconstruction Solutions | common area: forensic exploratory at east light well unit #2, 10, 18 (aka lb, 2e, 3h). demo existing exterior stucco to exposewaterproofing & source of leak. demo only. 600 sq ft at lightwell only.Details
common area: forensic exploratory at east light well unit #2, 10, 18 (aka lb, 2e, 3h). demo existing exterior stucco to exposewaterproofing & source of leak. demo only. 600 sq ft at lightwell only. | $5,000 |
| Mar 29, 2021 | Completed final sign-off Jul 2021 | 2009 Divisadero St | Community Reconstruction Solutions | unit 3c remove and replace deck coatings and flashings. remove perimeter lap siding. westcoat rcx deck coating. paint to match existing. like in kindDetails
unit 3c remove and replace deck coatings and flashings. remove perimeter lap siding. westcoat rcx deck coating. paint to match existing. like in kind | $6,259 |
| Feb 1, 2021 | Completed final sign-off Apr 2021 | 85 Ora Wy | Community Reconstruction Solutions | remove and replace 1 bedroom window 72" x 60" like for like. and replace affected shingles. paint to match. visible from st. aluminum windows to aluminum windows - that are visible from streetDetails
remove and replace 1 bedroom window 72" x 60" like for like. and replace affected shingles. paint to match. visible from st. aluminum windows to aluminum windows - that are visible from street | $607 |
| Aug 28, 2020 | Completed final sign-off Dec 2020 | 574 Diamond St | Community Reconstruction Solutions | entry landing, drive way and lightwell repairs, remove and replace title surface at entry landing and lightwell, remove and replace driveway concrete, remove and replace plywood substrate at driveway, entry landing and lightwell and apply water proof membrane, remove and replace new metal railing atDetails
entry landing, drive way and lightwell repairs, remove and replace title surface at entry landing and lightwell, remove and replace driveway concrete, remove and replace plywood substrate at driveway, entry landing and lightwell and apply water proof membrane, remove and replace new metal railing at | $21,984 |
| Jul 21, 2020 | Completed final sign-off Oct 2020 | 95 Ora Wy | Community Reconstruction Solutions | remove & replace exterior siding & trims. install new hardie panels & trims. paint to match existing. 700 sq feet.Details
remove & replace exterior siding & trims. install new hardie panels & trims. paint to match existing. 700 sq feet. | $7,110 |
| Jul 20, 2020 | Completed final sign-off Oct 2020 | 1301 Fulton St | Community Reconstruction Solutions | remove & replace siding and trims at south facing wall. install new hardie panels & trims. paint to match existing. not facing street.maher n/a**Details
remove & replace siding and trims at south facing wall. install new hardie panels & trims. paint to match existing. not facing street.maher n/a** | $8,742 |
| Oct 25, 2019 | Completed final sign-off May 2020 | 2801 Jackson St | Community Reconstruction Solutions | deck coating @ 3 decks w/westcoat alx.Details
deck coating @ 3 decks w/westcoat alx. | $4,679 |
| Sep 13, 2019 | Completed final sign-off Jan 2020 | 360 Guerrero St | Community Reconstruction Solutions | unit 302: replace 2 windows and 1 sliding glass door in kind. unit is on 3rd floor, scaffold is required to replace 1 window.Details
unit 302: replace 2 windows and 1 sliding glass door in kind. unit is on 3rd floor, scaffold is required to replace 1 window. | $2,332 |
| Jul 3, 2019 | Completed final sign-off Jul 2019 | 360 Guerrero St | Community Reconstruction Solutions | unit 320: remove & replace 1 bedroom window in like in kind. window facing courtyard. not visible from street. m < 0.58Details
unit 320: remove & replace 1 bedroom window in like in kind. window facing courtyard. not visible from street. m < 0.58 | $300 |
| Jul 3, 2019 | Completed final sign-off Jul 2019 | 360 Guerrero St | Community Reconstruction Solutions | unit 220: remove & replace 1 bedroom window in like in kind. window facing courtyard. not visible from street. m < 0.58Details
unit 220: remove & replace 1 bedroom window in like in kind. window facing courtyard. not visible from street. m < 0.58 | $300 |
| Apr 26, 2019 | Completed final sign-off Nov 2019 | 2790 19th Av | Community Reconstruction Solutions | common area repair to existing stone site retaining wallDetails
common area repair to existing stone site retaining wall | $32,000 |
| Dec 18, 2018 | Completed final sign-off Mar 2019 | 1488 Sanchez St | Community Reconstruction Solutions | deck coating w/west coat alxDetails
deck coating w/west coat alx | $3,473 |
| Nov 2, 2018 | Completed final sign-off May 2019 | 1930 Mission St | Community Reconstruction Solutions | west elevation wall siding replacement in kind, approx 2900 sq ft, and windows replacement. total of 27 @ backDetails
west elevation wall siding replacement in kind, approx 2900 sq ft, and windows replacement. total of 27 @ back | $24,601 |
| Oct 4, 2018 | Completed final sign-off Feb 2019 | 200 Portola Dr | Community Reconstruction Solutions | relocating patio. w/ western coating @ #240, #220, #250. western coat alx under tile @ #101 and #201. - 8 locations "not visible from street"Details
relocating patio. w/ western coating @ #240, #220, #250. western coat alx under tile @ #101 and #201. - 8 locations "not visible from street" | $40,000 |
| Jun 27, 2018 | Completed final sign-off May 2019 | 24 Carnelian Wy | Community Reconstruction Solutions | r/r slider door (10), like in kind for units 2/4/6/8/10/12/14/16/18/20/22/24. all slider doors and/or windows not visible from street.Details
r/r slider door (10), like in kind for units 2/4/6/8/10/12/14/16/18/20/22/24. all slider doors and/or windows not visible from street. | $40,000 |
| Jun 27, 2018 | Completed final sign-off Jul 2019 | 5155 Diamond Heights Bl | Community Reconstruction Solutions | r/r windows (7), like in kind for units 5143/5145/5147/5149/5151/5153/5155 . all windows not visible from street. max u-factor 0.32.Details
r/r windows (7), like in kind for units 5143/5145/5147/5149/5151/5153/5155 . all windows not visible from street. max u-factor 0.32. | $39,382 |
| Jun 27, 2018 | Completed final sign-off Apr 2019 | 5001 Diamond Heights Bl | Community Reconstruction Solutions | r/r windows like in kind (16) for units: 5001/5003/5005/5007/5009/5011/5013/5015/5017/5019/5021/5023/5025/5027/5029/5031. all windows not visible from street.Details
r/r windows like in kind (16) for units: 5001/5003/5005/5007/5009/5011/5013/5015/5017/5019/5021/5023/5025/5027/5029/5031. all windows not visible from street. | $90,017 |
| Apr 13, 2018 | Completed final sign-off Jun 2018 | 920 Harrison St | Community Reconstruction Solutions | replace of 10 windows at units 1 & 8. replacement same size and in kind in front of building. same location and dimensions. n/a maherDetails
replace of 10 windows at units 1 & 8. replacement same size and in kind in front of building. same location and dimensions. n/a maher | $9,800 |
| Feb 27, 2018 | Completed final sign-off Jun 2018 | 5001 Diamond Heights Bl | Community Reconstruction Solutions | remove and replace patio 1 door, 1 windows, 1 1 slider like in kind. not visible from the street.Details
remove and replace patio 1 door, 1 windows, 1 1 slider like in kind. not visible from the street. | $3,278 |
| Jan 16, 2018 | Completed final sign-off Feb 2018 | 65 Ora Wy | Community Reconstruction Solutions | replace one window not visible from street, same size , no framing change, max u.factor 0.32Details
replace one window not visible from street, same size , no framing change, max u.factor 0.32 | $1,200 |
| Jan 16, 2018 | Completed final sign-off Feb 2018 | 85 Ora Wy | Community Reconstruction Solutions | replace windows not visible from street, same size, no framing change, max. u-factor 0.32Details
replace windows not visible from street, same size, no framing change, max. u-factor 0.32 | $8,300 |
| Dec 27, 2017 | Completed final sign-off Jan 2020 | 1135 Francisco St | Community Reconstruction Solutions | administrative permit only: to comply with nov #201714514:separate original application for both buildings into 2: soft story retrofit ordinance 66-13 compliance for 1135 francisco street performaed under pa #201608013809. all work performed in comliance with mandatory soft-story ordinance #66-13.Details
administrative permit only: to comply with nov #201714514:separate original application for both buildings into 2: soft story retrofit ordinance 66-13 compliance for 1135 francisco street performaed under pa #201608013809. all work performed in comliance with mandatory soft-story ordinance #66-13. | |
| Dec 13, 2017 | Completed final sign-off Jun 2018 | 920 Harrison St | Community Reconstruction Solutions | replace windows and sliding door unit 3 and 10 in the front of the building sam location and dimensions - 8 windows and 1 sliding door - wood interior aluminum exterior cladding. maher n/a.Details
replace windows and sliding door unit 3 and 10 in the front of the building sam location and dimensions - 8 windows and 1 sliding door - wood interior aluminum exterior cladding. maher n/a. | $14,233 |
| Dec 5, 2017 | Completed final sign-off Feb 2018 | 45 Ora Wy | Community Reconstruction Solutions | replace 3 windows and one slsiding door. not visible from street. same size, same location. max u-factor 0.32Details
replace 3 windows and one slsiding door. not visible from street. same size, same location. max u-factor 0.32 | $3,600 |
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 1111 Bay St | Community Reconstruction Solutions | repair exterior stucco decay in kind units: 202,204,206,302,304,306,402,404,& 406. these units are not visible from street, outside common area. work to be around rear facing window approx 400 sq ft.Details
repair exterior stucco decay in kind units: 202,204,206,302,304,306,402,404,& 406. these units are not visible from street, outside common area. work to be around rear facing window approx 400 sq ft. | $40,000 |
| Oct 25, 2017 | Completed final sign-off Mar 2018 | 360 Guerrero St | Community Reconstruction Solutions | removed & repair stucco unit 320/420, around 90 sq ft. (repair stucco in kind). common area, courtyard.Details
removed & repair stucco unit 320/420, around 90 sq ft. (repair stucco in kind). common area, courtyard. | $2,500 |
| Oct 25, 2017 | Completed final sign-off Mar 2018 | 1839 15th St | Community Reconstruction Solutions | replaced 2 windows, no seen from street. repair stucco in kind & paint. windows same size as original. ma u factors 0.32Details
replaced 2 windows, no seen from street. repair stucco in kind & paint. windows same size as original. ma u factors 0.32 | $4,300 |
| Sep 21, 2017 | Completed final sign-off Nov 2017 | 161 Gilbert St | Community Reconstruction Solutions | repair stucco front of building around 200 square feet in-kind prime and paint.Details
repair stucco front of building around 200 square feet in-kind prime and paint. | $4,000 |
| Aug 18, 2017 | Completed final sign-off Feb 2018 | 1111 Bay St | Community Reconstruction Solutions | removed and replaced 60 vinyl windows back of building. windows not visible from street. repair sofits. u-factor 0.32 max. replace 1 vinyl sliding doors. all work in-kind. work at common areaDetails
removed and replaced 60 vinyl windows back of building. windows not visible from street. repair sofits. u-factor 0.32 max. replace 1 vinyl sliding doors. all work in-kind. work at common area | $97,000 |
| Jun 23, 2017 | Completed final sign-off Aug 2017 | 161 Gilbert St | Community Reconstruction Solutions | remodel siding & install new paneling siding 2300 sq ft. not visible from street. in kind.Details
remodel siding & install new paneling siding 2300 sq ft. not visible from street. in kind. | $26,000 |
| Jun 16, 2017 | Completed final sign-off Mar 2018 | 360 Guerrero St | Community Reconstruction Solutions | replace (2) windows, in kind. not visible from street. removed and repair 300 sq ft of stucco, back of buildingDetails
replace (2) windows, in kind. not visible from street. removed and repair 300 sq ft of stucco, back of building | $4,500 |
| Jun 16, 2017 | Completed final sign-off Jun 2017 | 58 Whitney St | Community Reconstruction Solutions | removed and installed new plywood, installed new west coat alx deck membrane, 400 sq ft. water proofingDetails
removed and installed new plywood, installed new west coat alx deck membrane, 400 sq ft. water proofing | $12,500 |
| May 19, 2017 | Completed final sign-off Aug 2017 | 1150 Sacramento St | Community Reconstruction Solutions | removed and replaced window in lightwell, in kind. not visible from street. u-factor 0.32 maxDetails
removed and replaced window in lightwell, in kind. not visible from street. u-factor 0.32 max | $8,700 |
| May 19, 2017 | Completed final sign-off Aug 2017 | 63 Lafayette St | Community Reconstruction Solutions | repair balcony deck, & patio deck. membranes. in kind only.Details
repair balcony deck, & patio deck. membranes. in kind only. | $7,300 |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 360 Guerrero St | Community Reconstruction Solutions | inkind repair of approx. 300 sf of stucco on front facade and repair of limited stucco areas on rear facade (common areas); no other workDetails
inkind repair of approx. 300 sf of stucco on front facade and repair of limited stucco areas on rear facade (common areas); no other work | $3,800 |
| Mar 22, 2017 | Completed final sign-off Jun 2017 | 1839 15th St | Community Reconstruction Solutions | replace bedroom window in-kind, not visible from streetDetails
replace bedroom window in-kind, not visible from street | $1,500 |
| Mar 22, 2017 | Completed final sign-off May 2017 | 2506 Leavenworth St | Community Reconstruction Solutions | deck balcony repair & sliding door replacement in-kind, not visible from street, less than 50%Details
deck balcony repair & sliding door replacement in-kind, not visible from street, less than 50% | $3,300 |
| Dec 28, 2016 | Never finaled issued Jan 2017, no final | 10 Iris Av | Community Reconstruction Solutions | voluntary strengthening: install new structural steel moment frame -Details
voluntary strengthening: install new structural steel moment frame - | $28,500 |
| Nov 22, 2016 | Completed final sign-off Apr 2017 | 1880 Jackson St | Community Reconstruction Solutions | remove plaster ceiling and installed sheet rock under common area garageDetails
remove plaster ceiling and installed sheet rock under common area garage | $18,500 |
| Sep 29, 2016 | Never finaled issued Sep 2016, no final | 12 Iris Av | Community Reconstruction Solutions | removed stucco, water proofing and flashing in kind 800sq ft. repair in kind.Details
removed stucco, water proofing and flashing in kind 800sq ft. repair in kind. | $47,000 |
| Sep 9, 2016 | Completed final sign-off Oct 2016 | 747 Natoma St | Community Reconstruction Solutions | repair garage sheet rock ceiling with 5/8 type "x" complaint #201623301Details
repair garage sheet rock ceiling with 5/8 type "x" complaint #201623301 | $900 |
| Sep 1, 2016 | Completed final sign-off Jul 2017 | 1 Baker St | Community Reconstruction Solutions | bldg a - working common area. 12 units form 1a to 4c. replace siding/trim/windows/deck coatings.Details
bldg a - working common area. 12 units form 1a to 4c. replace siding/trim/windows/deck coatings. | $121,346 |
| Sep 1, 2016 | Completed final sign-off Jul 2017 | 1 Baker St | Community Reconstruction Solutions | bldg b - working common area, 6 units form 5a to 6c. replace siding/trim/windows/deck coatings.Details
bldg b - working common area, 6 units form 5a to 6c. replace siding/trim/windows/deck coatings. | $180,898 |
| Aug 1, 2016 | Completed final sign-off Jan 2020 | 1125 Francisco St | Community Reconstruction Solutions | add wood shear walls at parking garage level maher not reqDetails
add wood shear walls at parking garage level maher not req | $100,000 |
| Jul 26, 2016 | Never finaled issued Jul 2016, no final | 4155 Cesar Chavez St | Community Reconstruction Solutions | replace 12 (e) sliding glass doors with (n) fiberglass doors at front of building-will match size and dimensions. recoat deck.Details
replace 12 (e) sliding glass doors with (n) fiberglass doors at front of building-will match size and dimensions. recoat deck. | $37,000 |
| Jul 14, 2016 | Completed final sign-off Jan 2023 | 4155 Cesar Chavez St | Community Reconstruction Solutions | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. additional of wood shear walls and four steel smf at on grade parking level.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. additional of wood shear walls and four steel smf at on grade parking level. | $105,000 |
| Jun 16, 2016 | Expired or cancelled expired Jul 2026 | 1391 Clayton St | Community Reconstruction Solutions | enlarge scope of work finish deck with ceramic tile. revision permit application # 201605066763. entire front of deck 2nd and 3rd floorsDetails
enlarge scope of work finish deck with ceramic tile. revision permit application # 201605066763. entire front of deck 2nd and 3rd floors | $14,500 |
| Jun 16, 2016 | Completed final sign-off Jul 2016 | 755 Florida St | Community Reconstruction Solutions | window replacement, not visible from the street same size and same location. addition to permit # 201604114403.Details
window replacement, not visible from the street same size and same location. addition to permit # 201604114403. | $1,200 |
| May 6, 2016 | Expired or cancelled expired Jul 2026 | 1391 Clayton St | Community Reconstruction Solutions | replaced sliding glass door, install new door pan, same size. repair door & stucco around door and floor in front, in kind.Details
replaced sliding glass door, install new door pan, same size. repair door & stucco around door and floor in front, in kind. | $4,500 |
| May 2, 2016 | Never finaled issued May 2016, no final | 4155 Cesar Chavez St | Community Reconstruction Solutions | garage door header dry rot repair in kind to existing wood frame.Details
garage door header dry rot repair in kind to existing wood frame. | $3,800 |
| Apr 11, 2016 | Completed final sign-off Jul 2016 | 725 Florida St | Community Reconstruction Solutions | waterproof wall and windows. repair stucco, 70 sq ft, at common area around side light well. not visible from street.Details
waterproof wall and windows. repair stucco, 70 sq ft, at common area around side light well. not visible from street. | $900 |
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 4155 Cesar Chavez St | Community Reconstruction Solutions | additional stucco demo arround 800 sq feet. all work below balconies at front.Details
additional stucco demo arround 800 sq feet. all work below balconies at front. | $3,000 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 4155 Cesar Chavez St | Community Reconstruction Solutions | remove and replace sheetrock and stucco at interior & exterior walls, wall coverings at some cornvrs & walls opening & close openings around 200 sq ft. replace with 5/8" type "x" gypsum board.Details
remove and replace sheetrock and stucco at interior & exterior walls, wall coverings at some cornvrs & walls opening & close openings around 200 sq ft. replace with 5/8" type "x" gypsum board. | $1,300 |
| Nov 10, 2015 | Completed final sign-off Aug 2016 | 1301 Fulton St | Community Reconstruction Solutions | revision to 201508255273. change stucco to hardi siding on top0 2 levels of building. visible from the street, common area maher naDetails
revision to 201508255273. change stucco to hardi siding on top0 2 levels of building. visible from the street, common area maher na | |
| Sep 21, 2015 | Completed final sign-off Nov 2015 | 2107 Pierce St | Community Reconstruction Solutions | repair deflected garage door header. maher naDetails
repair deflected garage door header. maher na | $4,500 |
| Sep 21, 2015 | Never finaled issued Sep 2015, no final | 65 Ora Wy | Community Reconstruction Solutions | apt 308: remodel bathroom: replace bath tub for shower pan. new tiles & shower mixed.Details
apt 308: remodel bathroom: replace bath tub for shower pan. new tiles & shower mixed. | $11,000 |
| Aug 25, 2015 | Completed final sign-off Aug 2016 | 1301 Fulton St | Community Reconstruction Solutions | remove stucco, replace windows and new stucco on all levels. work visible from the street. all work are in kind. n/a maher ord. #155-13Details
remove stucco, replace windows and new stucco on all levels. work visible from the street. all work are in kind. n/a maher ord. #155-13 | $292,000 |
| Jul 14, 2015 | Completed final sign-off Oct 2015 | 45 Ora Wy | Community Reconstruction Solutions | (e) lightwell & existing bathroom renovation. (replaced bath tub for shower pan & installed tile on wall). no change to wall location or fixture locations.Details
(e) lightwell & existing bathroom renovation. (replaced bath tub for shower pan & installed tile on wall). no change to wall location or fixture locations. | $4,750 |
| Feb 11, 2015 | Completed final sign-off Aug 2016 | 3699 Clay St | Community Reconstruction Solutions | seismic upgrade per san francisco ordinance 66-13 compliance. design criteria iebc a4Details
seismic upgrade per san francisco ordinance 66-13 compliance. design criteria iebc a4 | $30,000 |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 185 Carnelian Wy | Community Reconstruction Solutions | waterproof deck repair in kind. 50 sq. ft.Details
waterproof deck repair in kind. 50 sq. ft. | $2,700 |