Block 2847, lot 062
200 Portola Dr
- City’s use
- Single Family Residential
- Built
- 1996
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,199 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2022 | Completed final sign-off Sep 2024 | 200 Portola Dr | Community Reconstruction Solutions | exterior renovations: balcony restorations at 10 locations (3201, 101, 202a, 202b, 102a, 102b, 230, 201 garage side, 101 garage side, 270). deni 12" + stucco perimeter, demo deck membrane, install westcoast pro system, install flashings, install deck drain, paint to match. topcoat balconies (7)totalDetails
exterior renovations: balcony restorations at 10 locations (3201, 101, 202a, 202b, 102a, 102b, 230, 201 garage side, 101 garage side, 270). deni 12" + stucco perimeter, demo deck membrane, install westcoast pro system, install flashings, install deck drain, paint to match. topcoat balconies (7)total | $63,368 |
| Dec 26, 2018 | Never finaled issued Dec 2018, no final | 200 Portola Dr | street spaceDetails
street space | ||
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 200 Portola Dr | street spaceDetails
street space | ||
| Oct 4, 2018 | Completed final sign-off Feb 2019 | 200 Portola Dr | Community Reconstruction Solutions | relocating patio. w/ western coating @ #240, #220, #250. western coat alx under tile @ #101 and #201. - 8 locations "not visible from street"Details
relocating patio. w/ western coating @ #240, #220, #250. western coat alx under tile @ #101 and #201. - 8 locations "not visible from street" | $40,000 |
| Feb 10, 2012 | Completed final sign-off Jul 2012 | 200 Portola Dr | Mt Tam Construction | #101:guest bathroom:replace bathtub, mix value, tile tub surround,mirror tile floor , vanity top and sink and faucet and toilet. master bthroom: replace shower pan, mix valve, tile, shower surround,tile floor, mirror vanity top,sink & fuacet & toilet.paint. extg exaust fans remain.Details
#101:guest bathroom:replace bathtub, mix value, tile tub surround,mirror tile floor , vanity top and sink and faucet and toilet. master bthroom: replace shower pan, mix valve, tile, shower surround,tile floor, mirror vanity top,sink & fuacet & toilet.paint. extg exaust fans remain. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Community Reconstruction Solutions (2), Mt Tam Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.