Kevin O'connor
- License
- 65297
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Kevin O'connor Inc
- On San Francisco permits
- Feb 2014 to Oct 2026
11 permits since 2000 (engineer on 10 permits, architect on 1 permit): 6 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Collins Construction Inc, Cooke And Mccann Inc, Francisco Zarceno, Green Construction And Electric, Handyman Heroes Inc., Jakcon, Inc, Oarcon Inc, Saint Bridget Construction Inc
- Architects
- Jorge Carbonell, Vincent Labiano Abello, William Pashelinsky
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 27, 2026 | In progress filed Oct 2026, not yet issued | 945 Larkin St | document south property line window at unit 46.to comply with nov 202658137.Details
document south property line window at unit 46.to comply with nov 202658137. | $1,000 | |
| Feb 19, 2026 | In progress issued Feb 2026 | 32 Gough St | Saint Bridget Construction Inc | partial foundation replacement.Details
partial foundation replacement. | $15,000 |
| Aug 7, 2025 | In progress issued Oct 2025 | 1431 31st Av | Handyman Heroes Inc. | revision to pa# 202309196867, to remove welding inspection. custom guardrail replaced with pre-manufactured stem.Details
revision to pa# 202309196867, to remove welding inspection. custom guardrail replaced with pre-manufactured stem. | |
| Oct 11, 2023 | Completed final sign-off Nov 2024 | 3054 Octavia St | Oarcon Inc | add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314.Details
add additional dwelling unit (adu)@ 1st floor by converting rear part of garage. provide new kitchen and bathroom at adu. new adu per state government code sec 66314. | $150,000 |
| Nov 22, 2022 | In progress issued Mar 2025 | 4319 21st St | Jakcon, Inc | at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard.Details
at 1st flr: 1-story horizontal addition in rear yard w/ (n) bedroom & (n) bath. turn (e) bathroom into laundry room. relocate water heater & furnace to garage. at 2nd flr: (n) roof deck above addition w/ (n) stairs down to rear yard. | $75,000 |
| Jul 22, 2021 | Completed final sign-off Aug 2021 | 248 Colon Av | Cooke And Mccann Inc | revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wallDetails
revision to 2019 1031 6030. reduce excavation scope @ rear yard. add wood retaining wall to accommodated access to rear yard. change opening at 1st fire wall | |
| Dec 24, 2019 | Completed final sign-off Jun 2021 | 56 Badger St | ground stroy: transform bedroom into two bedrooms; relocate stairways to upstairs, add three bathrooms. infill 3'x12.5' addition under esisting building. upper story: remodel kitchen and bathroom. remove 2 interior walls.Details
ground stroy: transform bedroom into two bedrooms; relocate stairways to upstairs, add three bathrooms. infill 3'x12.5' addition under esisting building. upper story: remodel kitchen and bathroom. remove 2 interior walls. | $45,000 | |
| Oct 14, 2016 | Completed final sign-off Oct 2017 | 1871 Church St | Collins Construction Inc | installation sequence to accommodate foundation constructionDetails
installation sequence to accommodate foundation construction | |
| Sep 6, 2016 | Completed final sign-off Apr 2021 | 1907 Oak St | Francisco Zarceno | soft story compliance 2012 iebc appendix a-4Details
soft story compliance 2012 iebc appendix a-4 | $50,000 |
| May 27, 2014 | Expired or cancelled cancelled Feb 2021 | 551 45th Av | add new rear deck. | $15,000 | |
| Feb 21, 2014 | Completed final sign-off Oct 2015 | 420 Alvarado St | Green Construction And Electric | to comply w/ nov # 201314441 & 201337261 #201310229876 for purpose dcp notification. installation of (n) deck per plans.Details
to comply w/ nov # 201314441 & 201337261 #201310229876 for purpose dcp notification. installation of (n) deck per plans. |