Ken Yamauchi
- Listed as
- architect
- On San Francisco permits
- Jan 2017 to Sep 2023
5 permits since 2000 (architect on 5 permits): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2023 | Completed final sign-off Aug 2025 | 240 Shotwell St | Tradequip Corporation | renovation of (e) 1820 sq.ft. oshpd-3 dental area. within (e) oshpd clinic including a (n) reception. (n) dental operatories,(n) sterile & lab space & (n) admin team area. (n) electrical panel, (n) lighting, & replacement of (e) rooftop mechanical units w/ (n) attic installed ductwork.Details
renovation of (e) 1820 sq.ft. oshpd-3 dental area. within (e) oshpd clinic including a (n) reception. (n) dental operatories,(n) sterile & lab space & (n) admin team area. (n) electrical panel, (n) lighting, & replacement of (e) rooftop mechanical units w/ (n) attic installed ductwork. | $523,000 |
| Nov 1, 2022 | Completed final sign-off Jun 2025 | 4836 Mission St | new 9,670 sqft ground floor tenant improvement for the mission neighborhood health center (mnhc): 11 exam room primary care facilities. 6 operatory dental clinics. administrative space. base pa# 201903195605 s.Details
new 9,670 sqft ground floor tenant improvement for the mission neighborhood health center (mnhc): 11 exam room primary care facilities. 6 operatory dental clinics. administrative space. base pa# 201903195605 s. | $1,100,000 | |
| Sep 10, 2018 | Completed final sign-off Nov 2019 | 1199 Bush St | Mar Con Builders Inc Dba Mar Con Co | expansion of 1 restroom (one wall to be moved) new plumbing, fixtures. lighting & finishes. in two restroom. modification of (e) drinking fountains for accessible water flow reqs, new suite signage on all floors, additional pull-latch to elevate cab. reverse swing of one (e) door maher naDetails
expansion of 1 restroom (one wall to be moved) new plumbing, fixtures. lighting & finishes. in two restroom. modification of (e) drinking fountains for accessible water flow reqs, new suite signage on all floors, additional pull-latch to elevate cab. reverse swing of one (e) door maher na | $50,000 |
| Sep 10, 2018 | Completed final sign-off Nov 2019 | 909 Hyde St | Mar Con Builders Inc Dba Mar Con Co | expansion of 1 restroom (one wall to be moved) new plumbing, fixtures. lighting & finishes in restroom. modification of (e) drinking fountains for accessible rated water height reqs. new signage & door schedule maher naDetails
expansion of 1 restroom (one wall to be moved) new plumbing, fixtures. lighting & finishes in restroom. modification of (e) drinking fountains for accessible rated water height reqs. new signage & door schedule maher na | $50,000 |
| Jan 11, 2017 | Completed final sign-off Sep 2019 | 460 Stanyan St | City Building Inc. | ada barrier removal at mri building. ** maher: n/a **Details
ada barrier removal at mri building. ** maher: n/a ** | $33,018 |