Tradequip Corporation
- Based in
- Newark
- On San Francisco permits
- Mar 2022 to Sep 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2023 | Completed final sign-off Aug 2025 | 240 Shotwell St | renovation of (e) 1820 sq.ft. oshpd-3 dental area. within (e) oshpd clinic including a (n) reception. (n) dental operatories,(n) sterile & lab space & (n) admin team area. (n) electrical panel, (n) lighting, & replacement of (e) rooftop mechanical units w/ (n) attic installed ductwork.Details
renovation of (e) 1820 sq.ft. oshpd-3 dental area. within (e) oshpd clinic including a (n) reception. (n) dental operatories,(n) sterile & lab space & (n) admin team area. (n) electrical panel, (n) lighting, & replacement of (e) rooftop mechanical units w/ (n) attic installed ductwork. | $523,000 |
| Jul 25, 2023 | In progress issued Mar 2024 | 240 Shotwell St | priority process per ab004 - replacement of the mechanical units on the roof & attic space (non oshpd-3) that supply air to the 2nd flr admin offices. new electrical panel, corrective work & new structural supports at the roof.Details
priority process per ab004 - replacement of the mechanical units on the roof & attic space (non oshpd-3) that supply air to the 2nd flr admin offices. new electrical panel, corrective work & new structural supports at the roof. | $400,000 |
| Apr 14, 2022 | Completed final sign-off Apr 2023 | 1600 18th St | install 1 non-electric, single faced wall sign. (cozy dental)Details
install 1 non-electric, single faced wall sign. (cozy dental) | $650 |
| Apr 14, 2022 | Completed final sign-off Apr 2023 | 1600 18th St | install 1 projecting, non-electric, double faced wall sign. (cozy dental)Details
install 1 projecting, non-electric, double faced wall sign. (cozy dental) | $550 |
| Mar 17, 2022 | Completed final sign-off Apr 2023 | 1600 18th St | interior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas.Details
interior t.i. including accessible restroom, non bearing walls, lighting, hvac system ductwork, electrical outlets, four dental chairs. does not include medical gas. | $200,000 |