Joseph Powell Iii
- Listed as
- architect
- Firm
- Powell Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Jul 2024
8 permits since 2000 (architect on 8 permits): 6 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 31, 2024 | Completed final sign-off Sep 2025 | 1170 Sacramento St | Danziger Builders | unit 10d: relocate select non structural walls. relocated 2 baths, remove 1 powder rm. replace all light fixture, add outlets, replace circuits brealer box w/code complaimte. replace all plumbing fixtures & applicances. new cabinets & fisnies & doors. kitchen remodel. no exterior work &life safety &Details
unit 10d: relocate select non structural walls. relocated 2 baths, remove 1 powder rm. replace all light fixture, add outlets, replace circuits brealer box w/code complaimte. replace all plumbing fixtures & applicances. new cabinets & fisnies & doors. kitchen remodel. no exterior work &life safety & | $450,000 |
| Apr 13, 2022 | Never finaled issued Apr 2022, no final | 2179 44th Av | Actually Design Build Inc | structural upgrade to current code. new rear openings. new interior partitions. upgrade of elec/plumb. insulate. new finishes/ fixtures throughout. no increase in gross area / height.Details
structural upgrade to current code. new rear openings. new interior partitions. upgrade of elec/plumb. insulate. new finishes/ fixtures throughout. no increase in gross area / height. | $500,000 |
| Nov 29, 2021 | In progress issued Nov 2024 | 744 Rhode Island St | Nima Construction | add a 3rd fl w/ roof deck. upgrade all structure & foundation to meet/ exceed current code. complete partially excavated 1st fl basement/garage. upgrade m.e.p. to code. increase permeable area of sidewalk. increase area of solar panels & add gray water system. install sprinkler system per nfpa13r.Details
add a 3rd fl w/ roof deck. upgrade all structure & foundation to meet/ exceed current code. complete partially excavated 1st fl basement/garage. upgrade m.e.p. to code. increase permeable area of sidewalk. increase area of solar panels & add gray water system. install sprinkler system per nfpa13r. | $1,200,000 |
| Sep 26, 2020 | Completed final sign-off Feb 2023 | 1024 Ortega St | remodel of sfd: demolisgh & rebuild downstairs bathroom & bedroom. replce bedroom door to exterior w/ window. relace den window with ext.door.demolish/rebuild interior stair from study to den. build new stair from ext.deck to grade. no change to building area.Details
remodel of sfd: demolisgh & rebuild downstairs bathroom & bedroom. replce bedroom door to exterior w/ window. relace den window with ext.door.demolish/rebuild interior stair from study to den. build new stair from ext.deck to grade. no change to building area. | $90,000 | |
| Feb 2, 2017 | Completed final sign-off Jan 2019 | 782 Wisconsin St | Royal Lyon Construction | revision to 201506017698, addition of rated fire pump room, miscellaneous updates to details; modification to 4th floor guardrail.Details
revision to 201506017698, addition of rated fire pump room, miscellaneous updates to details; modification to 4th floor guardrail. | $5,000 |
| Jun 1, 2015 | Completed final sign-off Jan 2019 | 782 Wisconsin St | Royal Lyon Construction | vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel.Details
vertical addition to 1 story rear unit of 2 unit condo bldg, kitchen remodel. | $150,000 |
| May 20, 2013 | Completed final sign-off Feb 2015 | 915 Ashbury St | Brody Construction | replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall.Details
replace wood decks off of 1st & 2nd floor with new decks & sturcture. replace stair form 1st floor to garden. add convenience stair from 1st to 2nd floor. add small deck at 3rd floor. perform voluntary structural upgrade to rear (west) wall. | $50,000 |
| Feb 20, 2013 | Completed final sign-off Jun 2013 | 782 Wisconsin St | Gil Construction & Assoc Inc. | replace existing rear cantilevered deck off of main living floor with unenclosed column supported deck less than 10' above gradeDetails
replace existing rear cantilevered deck off of main living floor with unenclosed column supported deck less than 10' above grade | $20,000 |