Lucas Ottoboni
- License
- 84234
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Romig Engineers
- Based in
- San Carlos
- On San Francisco permits
- Dec 2016 to Nov 2021
2 permits since 2000 (engineer on 2 permits): 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nima Construction
- Architects
- Greg Klein, Joseph Powell Iii
- Engineers
- Benjamin Lai, Brendan Forslund Beazley, Gasil Aldepulla
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 29, 2021 | In progress issued Nov 2024 | 744 Rhode Island St | Nima Construction | add a 3rd fl w/ roof deck. upgrade all structure & foundation to meet/ exceed current code. complete partially excavated 1st fl basement/garage. upgrade m.e.p. to code. increase permeable area of sidewalk. increase area of solar panels & add gray water system. install sprinkler system per nfpa13r.Details
add a 3rd fl w/ roof deck. upgrade all structure & foundation to meet/ exceed current code. complete partially excavated 1st fl basement/garage. upgrade m.e.p. to code. increase permeable area of sidewalk. increase area of solar panels & add gray water system. install sprinkler system per nfpa13r. | $1,200,000 |
| Dec 21, 2016 | Never finaled issued Apr 2018, no final | 775 Sanchez St | renovation & horizontal & 1-story vertical addition to (e) (2) unit residential structure. one unit will have 1 bedroom & 1 bath. another unit will have 4 bedrooms & 4 baths.Details
renovation & horizontal & 1-story vertical addition to (e) (2) unit residential structure. one unit will have 1 bedroom & 1 bath. another unit will have 4 bedrooms & 4 baths. | $500,000 |