Joe Gulden
- Listed as
- engineer
- Firm
- Imeg
- Based in
- Sf
- On San Francisco permits
- Apr 2024 to Jul 2026
7 permits since 2000 (engineer on 7 permits): 2 completed, 5 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 451 Pacific Av | Build Group Inc. | deferred stair shop drawing submittal per pa# 202505126265. interior stair, structural detail only.Details
deferred stair shop drawing submittal per pa# 202505126265. interior stair, structural detail only. | |
| Mar 12, 2026 | In progress issued Apr 2026 | 631 Howard St | Richlen Construction | basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existingDetails
basement to ground floor - new interconnecting staircase that connects the basement to the ground floor. ref permit 202512192339, and 202512222436. no slab demolition under this permit, opening is existing | $155,000 |
| Feb 6, 2026 | In progress issued Sep 2026 | 505 Mission Rock St | Swinerton Rubecon Joint Venture | phase ii: mayoral ed 17-02 & 13-01: erect type i-a, a 23-story with 233 residential units with 2-stories above-grade parking.Details
phase ii: mayoral ed 17-02 & 13-01: erect type i-a, a 23-story with 233 residential units with 2-stories above-grade parking. | $67,250,000 |
| Aug 29, 2025 | In progress issued Dec 2025 | 1 Harrison St | Truebeck Construction | defferred curtainwall: structural only submission assocated with approved pa 202410173107Details
defferred curtainwall: structural only submission assocated with approved pa 202410173107 | |
| Oct 8, 2024 | In progress issued May 2025 | 1 Harrison St | Truebeck Construction | phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107.Details
phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107. | $6,545,000 |
| May 22, 2024 | Completed final sign-off Jun 2025 | 178 18th Av | kitchen remodel to remove non structural wall and add (n) non structural wall to create (n) hallway. additon of alcove in kitchen area. merge (e) 2 windows into one window within the same opening in kithcen area.Details
kitchen remodel to remove non structural wall and add (n) non structural wall to create (n) hallway. additon of alcove in kitchen area. merge (e) 2 windows into one window within the same opening in kithcen area. | $25,000 | |
| Apr 26, 2024 | Completed final sign-off Nov 2024 | 178 18th Av | rev 202011108591- to document the legalization of (e) rooms down located on ground floor previously approved to include update to full bath, bedroom, hallway/flex space.Details
rev 202011108591- to document the legalization of (e) rooms down located on ground floor previously approved to include update to full bath, bedroom, hallway/flex space. |