John Klopf
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Klopf Architecture
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Sep 2024
62 permits since 2000 (architect on 57 permits, designer on 2 permits, engineer on 2 permits, authorized agent-others on 1 permit): 47 completed, 6 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2024 | Expired or cancelled withdrawn Aug 2025 | 1459 Florida St | Keycon Inc | replace 3 vinyl windows and one sliding glass door with fiberglass to match size and appearance. remove and replace siding and stucco in kind as needed to waterproof windows and door. 2 of the 3 windows facing front of property. same size, same locations, max u-factor 0.30. repair in kind.Details
replace 3 vinyl windows and one sliding glass door with fiberglass to match size and appearance. remove and replace siding and stucco in kind as needed to waterproof windows and door. 2 of the 3 windows facing front of property. same size, same locations, max u-factor 0.30. repair in kind. | $15,000 |
| Jun 4, 2024 | Completed final sign-off Jun 2024 | 765 Market St | 38 Degress North Latitude Builders Inc. | revision to pa# 202401083580: reduction of scope - to remove (3) bathrooms from scope of work.Details
revision to pa# 202401083580: reduction of scope - to remove (3) bathrooms from scope of work. | |
| Jan 8, 2024 | Completed final sign-off Jun 2024 | 765 Market St | 38 Degress North Latitude Builders Inc. | ph 3d: the work consist of an interior remodel of 3 extg bathrooms and the replacement of an elevator inside of the penthouse.Details
ph 3d: the work consist of an interior remodel of 3 extg bathrooms and the replacement of an elevator inside of the penthouse. | $70,000 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 2488 San Bruno Av | Baytown Construction | filing for building permit requested by inspector for filing records of new installation of front door, mandatory disability access improvement program child care center, abe# 201807231711. no structural.Details
filing for building permit requested by inspector for filing records of new installation of front door, mandatory disability access improvement program child care center, abe# 201807231711. no structural. | |
| Jul 26, 2021 | Completed final sign-off Dec 2021 | 605 Castro St | Hosey Construction Co | interior remodel of bathroom and kitchen, adding laundry machines, and converting a closet to a powder room.Details
interior remodel of bathroom and kitchen, adding laundry machines, and converting a closet to a powder room. | $75,000 |
| Jul 23, 2021 | Completed final sign-off Sep 2021 | 463 Arlington St | Actually Design Build Inc | rev to pa202104078102: underpin of the (e) foundation at rear elevation limited to 15ft starting in the se corner of the structure due to a discovered field condition.Details
rev to pa202104078102: underpin of the (e) foundation at rear elevation limited to 15ft starting in the se corner of the structure due to a discovered field condition. | $10,000 |
| Apr 7, 2021 | Completed final sign-off Sep 2021 | 463 Arlington St | San Francisco Design & Constr. | replace original exterior rear stairs, leading down to the lower level yard. stair structure is no longer stable due to rot.Details
replace original exterior rear stairs, leading down to the lower level yard. stair structure is no longer stable due to rot. | $10,000 |
| Feb 13, 2021 | Completed final sign-off Oct 2024 | 157 Ellsworth St | Northpoint Builders | addition of appox 253 sq ft of liv space to (e) home. remodel 1 bedrm, 2 baths and kitchen. remove (e) fireplace, add 2 skylights, add 1 deck and balcony.Details
addition of appox 253 sq ft of liv space to (e) home. remodel 1 bedrm, 2 baths and kitchen. remove (e) fireplace, add 2 skylights, add 1 deck and balcony. | $150,000 |
| Jan 26, 2021 | Completed final sign-off Aug 2023 | 191 Topaz Wy | Proyecto | revision to app#201906133320/r1. layout update, plumbing changes, window and door changes, reflected ceiling plan update, electrical changes.Details
revision to app#201906133320/r1. layout update, plumbing changes, window and door changes, reflected ceiling plan update, electrical changes. | $50,000 |
| Sep 6, 2019 | Expired or cancelled cancelled Nov 2024 | 5567 Diamond Heights Bl | horizontal addition of 647 sq.ft. of living space. a portion of the space is above a down-slopping grade. the other portion is slab on grade. remodeling (e) lower level. relocate 1 bathroom, add 2 bathrooms, roof deck above addition.Details
horizontal addition of 647 sq.ft. of living space. a portion of the space is above a down-slopping grade. the other portion is slab on grade. remodeling (e) lower level. relocate 1 bathroom, add 2 bathrooms, roof deck above addition. | $225,000 | |
| Jun 13, 2019 | Completed final sign-off Aug 2023 | 191 Topaz Wy | Proyecto | the work consists of an interior remodel and filling in a light well to create a 78.33 sq ft addition to an existing single family residenceDetails
the work consists of an interior remodel and filling in a light well to create a 78.33 sq ft addition to an existing single family residence | $250,000 |
| Oct 29, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | Narrowback Construction Co., T N T Construction | revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuildingDetails
revision to 201806152002 & 201809211034, rear patio design revision and fence replacement and rebuilding | $3,000 |
| Oct 22, 2018 | Completed final sign-off Jan 2020 | 69 Encanto Av | San Francisco Design & Constr. | comply with nov 201898132 revise 201701177229. remove and replace framing at rear facing wall approx 2Details
comply with nov 201898132 revise 201701177229. remove and replace framing at rear facing wall approx 2 | $1,000 |
| Sep 21, 2018 | Completed final sign-off Sep 2020 | 89 Forest Side Av | Narrowback Construction Co., T N T Construction | rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope.Details
rev to pa#201806152002, to add one more bedroom at 1/f within the (e) building envelope. | $5,000 |
| Jun 15, 2018 | Completed final sign-off Dec 2020 | 89 Forest Side Av | Narrowback Construction Co., T N T Construction | horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel.Details
horizontal side addition (63.21 sq ft), kitchen remodel, front porch in kind replacement, garage door& driveway widening, stucco & window in kind replacement at front elevation, (e) pop out (@ kitchen) side, wall will be moved to be 3' clear of side setback. interior remodel. | $95,000 |
| Mar 2, 2018 | Expired or cancelled withdrawn Oct 2018 | 89 Martha Av | interior remodel including all bathrooms, kitchen & the addition of a (n) interior staircase. conversion of (e) crawl spaces to conditioned space & the expansion of garage into hillside. no changes to bldg or massing are proposed. street elevation to be repaired/replaced in kind.Details
interior remodel including all bathrooms, kitchen & the addition of a (n) interior staircase. conversion of (e) crawl spaces to conditioned space & the expansion of garage into hillside. no changes to bldg or massing are proposed. street elevation to be repaired/replaced in kind. | $454,379 | |
| Oct 26, 2017 | Completed final sign-off Sep 2018 | 1750 Taylor St | Wellbuilt Construction Inc | #1702: exploratory demolition of all non-load bearing walls, remodeling of kitchen & 2 bathrooms, new electrical throughout. replacement of windows & (1) new door in existing openings, new fireplace insert., re-surfacing of balcony.Details
#1702: exploratory demolition of all non-load bearing walls, remodeling of kitchen & 2 bathrooms, new electrical throughout. replacement of windows & (1) new door in existing openings, new fireplace insert., re-surfacing of balcony. | $40,000 |
| Aug 9, 2017 | Completed final sign-off Jan 2018 | 35 Amber Dr | Mc Cutcheon Construction Co. | revision to pa 2016-0224-0353 - structural changes on the roof, switch proposed location of sink and shower in master bathroomDetails
revision to pa 2016-0224-0353 - structural changes on the roof, switch proposed location of sink and shower in master bathroom | $32,000 |
| Jun 1, 2017 | Expired or cancelled expired Oct 2024 | 302 Warren Dr | San Francisco Design & Constr. | replace windows, exterior doors & siding throughout the house. demolish a sunroof & install a new window.Details
replace windows, exterior doors & siding throughout the house. demolish a sunroof & install a new window. | $49,828 |
| Jan 17, 2017 | Completed final sign-off Jan 2020 | 69 Encanto Av | San Francisco Design & Constr. | horizontal & vertical addition @ rear. removal of hip roof element, modification of front facade, interior remodel of living spaces, enclosure of bile storage in garage and relocating site stair to garage.Details
horizontal & vertical addition @ rear. removal of hip roof element, modification of front facade, interior remodel of living spaces, enclosure of bile storage in garage and relocating site stair to garage. | $450,000 |
| Nov 2, 2016 | Completed final sign-off Dec 2017 | 882 Geary St | Jeff King And Company Inc | revision to 201205079918, scope is change of use from retail to design office on ground floor. scope includes build out of design office & change to storefront. n/a for maher.Details
revision to 201205079918, scope is change of use from retail to design office on ground floor. scope includes build out of design office & change to storefront. n/a for maher. | $100,000 |
| Feb 24, 2016 | Completed final sign-off Jan 2018 | 35 Amber Dr | Mc Cutcheon Construction Co. | the work consistes of: remodeling 2 bedrooms and 1 bathroom and the addition of 1 bedroom within (e) envelope. add skylight not visible from streetDetails
the work consistes of: remodeling 2 bedrooms and 1 bathroom and the addition of 1 bedroom within (e) envelope. add skylight not visible from street | $50,000 |
| Apr 15, 2015 | Completed final sign-off Dec 2015 | 1355 04th Av | William Pattengill | remodel master bedroom, add bathroom, new lighting in master suite, new electrical in master suite, replace windows in kind at master suite.Details
remodel master bedroom, add bathroom, new lighting in master suite, new electrical in master suite, replace windows in kind at master suite. | $40,000 |
| Nov 5, 2014 | Expired or cancelled cancelled Jan 2026 | 356 Lexington St | install 9' curb wall due to below grade, no structural work, curb wall will be installed in rear side of property.Details
install 9' curb wall due to below grade, no structural work, curb wall will be installed in rear side of property. | $7,000 | |
| Oct 22, 2014 | Completed final sign-off Aug 2015 | 215 Amber Dr | San Francisco Design & Constr. | interior remodel of the kitchen & master suite fixtures & finishes will be replaced @ all (3) bathrooms, window replacement, new exterior siding to match original plans, & new roofing.Details
interior remodel of the kitchen & master suite fixtures & finishes will be replaced @ all (3) bathrooms, window replacement, new exterior siding to match original plans, & new roofing. | $300,000 |
| Apr 15, 2014 | Completed final sign-off Mar 2016 | 1177 De Haro St | Stingray Builders Inc. | horizontal addition deck to existing roof deck at 2nd level. interior remodel of the kitchen & dining room. no modification to street elevation.Details
horizontal addition deck to existing roof deck at 2nd level. interior remodel of the kitchen & dining room. no modification to street elevation. | $30,000 |
| Apr 4, 2014 | Never finaled issued Nov 2015, no final | 264 Dublin St | add second floor to an (e) one story single family house. work includes a second floor addition of 622 g.sf, stairs and minor modification to existing first floor.Details
add second floor to an (e) one story single family house. work includes a second floor addition of 622 g.sf, stairs and minor modification to existing first floor. | $100,000 | |
| Dec 19, 2013 | Completed final sign-off Jun 2014 | 4141 24th St | Hakewill Construction Co. Inc. | installation of a shade structure on an existing overhang.Details
installation of a shade structure on an existing overhang. | $10,000 |
| Dec 2, 2013 | Completed final sign-off Feb 2014 | 20 Newman St | Robert Howard Builders Inc. | revision of original pa# 201206223249 the work consists of re-fenestration of one wall and replacement of entry stairs in kind.Details
revision of original pa# 201206223249 the work consists of re-fenestration of one wall and replacement of entry stairs in kind. | $20,000 |
| Aug 30, 2013 | Never finaled issued Sep 2013, no final | 120 Turquoise Wy | A L Martin Construction | revision to 201304013546, 201307192339: alternate stairway design. exterior sheathing, dryrot repair. safety railing. remove/replace dry rot repair. bond beam/drainage improvements front patioDetails
revision to 201304013546, 201307192339: alternate stairway design. exterior sheathing, dryrot repair. safety railing. remove/replace dry rot repair. bond beam/drainage improvements front patio | $60,000 |
| Apr 17, 2013 | Completed final sign-off May 2015 | 723 Lawton St | Canyon Construction | addition of approximately 350.62 sqft. including expansion of kitchen and adding a master bath.Details
addition of approximately 350.62 sqft. including expansion of kitchen and adding a master bath. | $100,000 |
| Feb 21, 2013 | Completed final sign-off Jun 2014 | 4141 24th St | Hakewill Construction Co. Inc. | residential addition of sunroom 104 sq sf. replacing of exterior wood stair, addition of roof deck off the new sunroom.Details
residential addition of sunroom 104 sq sf. replacing of exterior wood stair, addition of roof deck off the new sunroom. | $30,000 |
| Nov 1, 2012 | Never finaled issued Nov 2012, no final | 301 Mission St | Kasten Builders/Creative Contr.Of Calif | unit 30f - rev. pa#201209060698: interior remodel of the apartment including removing of closet wing walls, replace (2) plumbing fixtures in (e) location, alteration of wall finishes.Details
unit 30f - rev. pa#201209060698: interior remodel of the apartment including removing of closet wing walls, replace (2) plumbing fixtures in (e) location, alteration of wall finishes. | |
| Sep 26, 2012 | Never finaled issued Oct 2012, no final | 301 Mission St | Kasten Builders/Creative Contr.Of Calif | interior remodel of the apartment including: replace of wall fixtures, changing of plumbing fixtures.Details
interior remodel of the apartment including: replace of wall fixtures, changing of plumbing fixtures. | $30,000 |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 195 Santa Ana Av | Saturn Construction Co | kitchen remodel interior work only, replacement of windows in kind at kitchenDetails
kitchen remodel interior work only, replacement of windows in kind at kitchen | $45,000 |
| Aug 27, 2012 | Expired or cancelled expired Feb 2017 | 290 30th Av | Leon Construction Inc | home remodel - kitchen, bath, structural upgrades per plans.Details
home remodel - kitchen, bath, structural upgrades per plans. | $150,000 |
| Jun 21, 2012 | Expired or cancelled withdrawn Feb 2013 | 941 Geary St | to comply with n.o.v #201066335-ces. change of use and related upgrades. change use from auto repair shop to retail space. replace restroom (accessible). demolish (e) non compliant mezzanine. upgrade (2) entrances.Details
to comply with n.o.v #201066335-ces. change of use and related upgrades. change use from auto repair shop to retail space. replace restroom (accessible). demolish (e) non compliant mezzanine. upgrade (2) entrances. | $25,000 | |
| May 11, 2012 | Completed final sign-off Oct 2012 | 208 Caselli Av | Kasten Builders/Creative Contr.Of Calif | conversion of an existing garage to living space including 2 bedrooms, bathroom & laundry room. remodel of ktichen on both units. add interior stair from remodeled garage ot first floor.Details
conversion of an existing garage to living space including 2 bedrooms, bathroom & laundry room. remodel of ktichen on both units. add interior stair from remodeled garage ot first floor. | $90,000 |
| May 7, 2012 | Completed final sign-off Dec 2017 | 882 Geary St | Flmc Development Corp Dba Adamo Campagna | change of use from m-motocycle rep sales to a-3 (art gallery) for 1st floor. build out of 1st floor art gallery space only except for relocation of the stair to basement. voluntary structural upgrades. no work to 2nd floor residence. sprinklers, mep, fire alarm under separate permit.Details
change of use from m-motocycle rep sales to a-3 (art gallery) for 1st floor. build out of 1st floor art gallery space only except for relocation of the stair to basement. voluntary structural upgrades. no work to 2nd floor residence. sprinklers, mep, fire alarm under separate permit. | $100,000 |
| Mar 19, 2012 | Completed final sign-off Sep 2012 | 356 Lexington St | Aaron Gordon Construction Inc | change framing members for floor infill 2x6 to 3/4"x5-1/2" lvl. removing lumiers scope from dining room. revison to pa# 201202234698.Details
change framing members for floor infill 2x6 to 3/4"x5-1/2" lvl. removing lumiers scope from dining room. revison to pa# 201202234698. | |
| Feb 23, 2012 | Completed final sign-off Sep 2012 | 356 Lexington St | Aaron Gordon Construction Inc | interior in-fill 72 net sq ft of lving space with in (e) bldg envelope by turning double height space into 2 single height spaces. new space will be an office room. replace 2 windows in kind, same dimensions. re-roof uppper roofs. add fiber optic skylight systemDetails
interior in-fill 72 net sq ft of lving space with in (e) bldg envelope by turning double height space into 2 single height spaces. new space will be an office room. replace 2 windows in kind, same dimensions. re-roof uppper roofs. add fiber optic skylight system | $55,000 |
| Nov 4, 2011 | Completed final sign-off Dec 2013 | 99 Mendosa Av | horizontal addition to an existing home, adding ~ 340 sqt. including basement & upper floor, alteration of (e) decks @ rear removing decorative roof @ front cosmetic work.Details
horizontal addition to an existing home, adding ~ 340 sqt. including basement & upper floor, alteration of (e) decks @ rear removing decorative roof @ front cosmetic work. | $100,000 | |
| Feb 18, 2011 | Completed final sign-off Oct 2011 | 743 29th Av | Leon Construction Inc | lower /garage floor remodeling to add one new full bathroom, (n) bedroom and (n) office roomDetails
lower /garage floor remodeling to add one new full bathroom, (n) bedroom and (n) office room | $55,000 |
| Aug 5, 2010 | Completed final sign-off Dec 2010 | 969 De Haro St | Stingray Builders Inc. | remodel existing ktichen, opening it to adjacent patio and to exisitng dining room. add railing with gate around patio stair opening.Details
remodel existing ktichen, opening it to adjacent patio and to exisitng dining room. add railing with gate around patio stair opening. | $60,000 |
| Dec 31, 2009 | Completed final sign-off May 2011 | 195 Santa Ana Av | Saturn Construction Co | add a basement level story under (e) home at garage level. interior remodel on the main level including removing a wall between 2 rooms, & providing a new stair to the basement level. addition of bull bath at basement level. window replacement.Details
add a basement level story under (e) home at garage level. interior remodel on the main level including removing a wall between 2 rooms, & providing a new stair to the basement level. addition of bull bath at basement level. window replacement. | $400,000 |
| Mar 12, 2009 | Completed final sign-off Oct 2009 | 195 Bepler St | repair/replace portions of existing rear deck stairway in kind, replace rusted steel rough hardware at exterior. concrete columns and at stair support post bases in eight locations.Details
repair/replace portions of existing rear deck stairway in kind, replace rusted steel rough hardware at exterior. concrete columns and at stair support post bases in eight locations. | $4,500 | |
| Feb 5, 2009 | Completed final sign-off Oct 2009 | 125 Mountain Spring Av | San Francisco Design & Constr. | widen, lengthen, and deepen front deck. new front deck guardrail, alter the garage doors. lower portion of front fence.Details
widen, lengthen, and deepen front deck. new front deck guardrail, alter the garage doors. lower portion of front fence. | $65,000 |
| Nov 21, 2008 | Completed final sign-off Oct 2009 | 125 Mountain Spring Av | remodel bathrm, reconfigure wood-burn fire place surround, remodel stairs, cabinetry, replace door at family rm, remove wall betw kitchn & dining, replace counter & portion cabinetry, replace lavatory & counter top in powder rm, remove free stand partition wall, new walls at storage rm, laundry rm.Details
remodel bathrm, reconfigure wood-burn fire place surround, remodel stairs, cabinetry, replace door at family rm, remove wall betw kitchn & dining, replace counter & portion cabinetry, replace lavatory & counter top in powder rm, remove free stand partition wall, new walls at storage rm, laundry rm. | $85,000 | |
| Sep 30, 2008 | Completed final sign-off Jan 2009 | 5501 California St | connect 2 extg storefronts with an opening in a load bearing interior wall. add exterior trim, install awings, and add one new identifying sign at the exterior. mep on separate permit.Details
connect 2 extg storefronts with an opening in a load bearing interior wall. add exterior trim, install awings, and add one new identifying sign at the exterior. mep on separate permit. | $6,000 | |
| Jul 3, 2008 | Completed final sign-off Dec 2008 | 1426 06th Av | Plath & Company Inc | remove fiberglass handrail above mudroom, build gable roof instead, california framed over permitted flat roof, remove brick facing & walking surfaces at front stairs, use granite for walking surfaces & stucco for facing, revision to pa# 2007-0807-9058Details
remove fiberglass handrail above mudroom, build gable roof instead, california framed over permitted flat roof, remove brick facing & walking surfaces at front stairs, use granite for walking surfaces & stucco for facing, revision to pa# 2007-0807-9058 | |
| Nov 21, 2007 | Never finaled issued Nov 2007, no final | 20 Newman St | revision to app.#2007 10 15 5365/ add cathedral ceiling in great room and master bedroom,install 3 skylights,enlarge window on north facade, replace window in master bedroom with french doors.Details
revision to app.#2007 10 15 5365/ add cathedral ceiling in great room and master bedroom,install 3 skylights,enlarge window on north facade, replace window in master bedroom with french doors. | $15,000 | |
| Oct 15, 2007 | Completed final sign-off Apr 2008 | 20 Newman St | Bay Area General Const | demo existing kitchen and false ceiling on first floor. move kitchen to new location. move toilet and sink within existing bathroom. move water heater to basement. demo non-structural partition wall and two closets. refinish walls with drywall.Details
demo existing kitchen and false ceiling on first floor. move kitchen to new location. move toilet and sink within existing bathroom. move water heater to basement. demo non-structural partition wall and two closets. refinish walls with drywall. | $35,000 |
| Sep 12, 2007 | Completed final sign-off Dec 2007 | 200 Kansas St | 2nd floor-revise app# 200705292446/construct new wheelchair ramp and new stair between floor levels of new suiteDetails
2nd floor-revise app# 200705292446/construct new wheelchair ramp and new stair between floor levels of new suite | $2,500 | |
| Aug 7, 2007 | Completed final sign-off Dec 2008 | 1426 06th Av | remove existing entry stairs, expand and enclose entry landing to become mud room, put in coor compliant entry stairs with stem wall and decorative guard/handrail, replace entry door and ground floor entry door.Details
remove existing entry stairs, expand and enclose entry landing to become mud room, put in coor compliant entry stairs with stem wall and decorative guard/handrail, replace entry door and ground floor entry door. | $75,000 | |
| Feb 21, 2007 | Completed final sign-off May 2007 | 463 Arlington St | demolish (e) power room on lower level. create new full bath and laundry room. update interior finishes. replace 1 window and 1 exterior door not facing the street. wall over 1 window.Details
demolish (e) power room on lower level. create new full bath and laundry room. update interior finishes. replace 1 window and 1 exterior door not facing the street. wall over 1 window. | $55,000 | |
| Jul 13, 2006 | Completed final sign-off Sep 2006 | 365 San Jose Av | repair and reroof flat roof over kitchen, demolish (e) deck over that area of roof and replace it with a smaller deck on sleepers over repaired flat roof, roof line will remain unchanged.Details
repair and reroof flat roof over kitchen, demolish (e) deck over that area of roof and replace it with a smaller deck on sleepers over repaired flat roof, roof line will remain unchanged. | $8,500 | |
| May 9, 2006 | Never finaled issued May 2006, no final | 151 Bonview St | revision to 2005102068. reduce scope of sork in kitchen, bath, and dining room by leaving orig wall largely in place, only opening portions. also patio door with side lights in dining room reduce to patio door only (narrower)Details
revision to 2005102068. reduce scope of sork in kitchen, bath, and dining room by leaving orig wall largely in place, only opening portions. also patio door with side lights in dining room reduce to patio door only (narrower) | ||
| Mar 2, 2006 | Completed final sign-off Aug 2006 | 4339 26th St | revision to permit no. 200502236057-based on new survey showing different property lines from what we assumed, move west wall of addition to east and replace fire rated windows on east wall of dining rm w/non rated operable windwsDetails
revision to permit no. 200502236057-based on new survey showing different property lines from what we assumed, move west wall of addition to east and replace fire rated windows on east wall of dining rm w/non rated operable windws | ||
| Feb 14, 2006 | Completed final sign-off May 2007 | 4301 26th St | Leon & Sons Construction Inc. | remove 12' wide garage door and expand opening of garage to 16'. move gas meter. repave driveway but do not alter apron or curb cut. replace 2 windows in finished basement ads to garage.Details
remove 12' wide garage door and expand opening of garage to 16'. move gas meter. repave driveway but do not alter apron or curb cut. replace 2 windows in finished basement ads to garage. | $18,000 |
| May 10, 2005 | Expired or cancelled expired Oct 2006 | 151 Bonview St | remove interior wall & replace w/beam. remodel kitchen, alter fenertration on 1st /fl of rear wall.Details
remove interior wall & replace w/beam. remodel kitchen, alter fenertration on 1st /fl of rear wall. | $45,000 | |
| Feb 24, 2005 | Completed final sign-off Mar 2005 | 97 Banks St | H And X Builders | revise to app n #2004/03/19/9139 add two windows above (e) window master bedrmDetails
revise to app n #2004/03/19/9139 add two windows above (e) window master bedrm | $1,000 |
| Feb 23, 2005 | Expired or cancelled expired Aug 2006 | 4339 26th St | demolish existing solarium at rear of house and portion of wood deck add 276 sf one story addition with gable roof over concrete foundation. net 94 sq.ft.added.Details
demolish existing solarium at rear of house and portion of wood deck add 276 sf one story addition with gable roof over concrete foundation. net 94 sq.ft.added. | $55,000 |