Jay Sungjae Kim
- Listed as
- authorized agent-others, contractor
- Firm
- Super Home Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Aug 2026
60 permits since 2000 (contractor on 57 permits, authorized agent-others on 3 permits): 50 completed, 1 in progress, 8 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 667 London St | Sh Painting And Construction Inc | to comply with nov 202659160: legalize ground floor laundry center and update electrical and plumbing as needed. correct elecrtical and plumbing hook ups as needed. install dryer exhaust and exhaust ducting for dryer.Details
to comply with nov 202659160: legalize ground floor laundry center and update electrical and plumbing as needed. correct elecrtical and plumbing hook ups as needed. install dryer exhaust and exhaust ducting for dryer. | $3,000 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 1585 10th Av | Sh Painting And Construction Inc | unit 4: replace bathroom shower pan, wall tiles, fan, like for like repair.Details
unit 4: replace bathroom shower pan, wall tiles, fan, like for like repair. | $9,000 |
| Apr 14, 2025 | Completed final sign-off Apr 2025 | 64 San Benito Wy | Sh Painting And Construction Inc | replace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure.Details
replace the four 9 ft deck boards on the front side of the balcony due to dry rot damage. repairs less than 50 % of structure. | $1,000 |
| Nov 13, 2023 | Completed final sign-off Mar 2024 | 51 06th St | Super Home Builders Inc. | installation of grab bars at the shower neart room#308 by nov compliant 202311241 issued on 7/28/2023 item #6Details
installation of grab bars at the shower neart room#308 by nov compliant 202311241 issued on 7/28/2023 item #6 | $800 |
| Nov 3, 2023 | In progress issued Dec 2023 | 516 Ofarrell St | Super Home Builders Inc. | unit 204. closing wall and ceiling in unit and hallway to unit 204 for the exhaust fan, ref complaint 202310691. exhaust to terminate at least 3' from property line. to comply with nov 202310691.Details
unit 204. closing wall and ceiling in unit and hallway to unit 204 for the exhaust fan, ref complaint 202310691. exhaust to terminate at least 3' from property line. to comply with nov 202310691. | $3,500 |
| Sep 19, 2023 | Completed final sign-off Sep 2023 | 1210 Connecticut St | Super Home Builders Inc. | partial dry rot wood boards repair at the 4 staircase - less than 50% to comply w/ complaint# 202311198 item #2. repair in kind.Details
partial dry rot wood boards repair at the 4 staircase - less than 50% to comply w/ complaint# 202311198 item #2. repair in kind. | $3,000 |
| Jun 21, 2023 | Completed final sign-off Oct 2023 | 56 Garcia Av | Super Home Builders Inc. | convert existing water closet into bathroom with shower & sink.Details
convert existing water closet into bathroom with shower & sink. | $12,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2023 | 162 Nevada St | Super Home Builders Inc. | siding repair- front- re-stucco: back and 2 sides- install new pre-primed james hardie: plank primey lap fiber cement siding over existing wall.Details
siding repair- front- re-stucco: back and 2 sides- install new pre-primed james hardie: plank primey lap fiber cement siding over existing wall. | $37,000 |
| Dec 19, 2022 | Completed final sign-off Mar 2023 | 627 San Bruno Av | Super Home Builders Inc. | remove windows, change electrical light wiring, change location of sink and toilet, revision of permit #202209011714. windows not visible from street.Details
remove windows, change electrical light wiring, change location of sink and toilet, revision of permit #202209011714. windows not visible from street. | $500 |
| Nov 14, 2022 | Completed final sign-off Jan 2023 | 345 Mansell St | Super Home Builders Inc. | replace 1 window at internal lightwell @ bedroom @ 2nd story. in kindDetails
replace 1 window at internal lightwell @ bedroom @ 2nd story. in kind | $800 |
| Nov 9, 2022 | Never finaled issued Apr 2023, no final | 436 Ofarrell St | Super Home Builders Inc. | no change of use under this permit. existing space is not approved for residential until 2008 permit finaled. 11/9/2022 unit 600: renovation to provide new entry door & new and serpated fire rated door to elevator hoistway. no change to bldg hgt/facade/use. ref bpa#200808058406Details
no change of use under this permit. existing space is not approved for residential until 2008 permit finaled. 11/9/2022 unit 600: renovation to provide new entry door & new and serpated fire rated door to elevator hoistway. no change to bldg hgt/facade/use. ref bpa#200808058406 | $4,600 |
| Sep 28, 2022 | Completed final sign-off Oct 2022 | 175 06th St | Super Home Builders Inc. | install new sheetrock on water damage common area stairwell and hallways walls and ceilings. (partial repair wall total 210 sq ft and ceiling 36 sq ft) 2nd floor to 5th floor.Details
install new sheetrock on water damage common area stairwell and hallways walls and ceilings. (partial repair wall total 210 sq ft and ceiling 36 sq ft) 2nd floor to 5th floor. | $4,000 |
| Sep 1, 2022 | Completed final sign-off Mar 2023 | 627 San Bruno Av | Super Home Builders Inc. | remodel kitchen/bathroom , remove load bearing wall.Details
remodel kitchen/bathroom , remove load bearing wall. | $100,000 |
| Aug 17, 2022 | Completed final sign-off Aug 2022 | 106 06th St | Super Home Builders Inc. | unit #509 only. install sheetrock over existing ceiling.Details
unit #509 only. install sheetrock over existing ceiling. | $3,800 |
| May 19, 2022 | Completed final sign-off Apr 2023 | 245 Chester Av | Super Home Builders Inc. | revision to pa# 202110291440. structural replacement of rotten members per plans. replace and repair siding in kind as required at rear facade.Details
revision to pa# 202110291440. structural replacement of rotten members per plans. replace and repair siding in kind as required at rear facade. | $1,000 |
| Mar 11, 2022 | Completed final sign-off Apr 2023 | 245 Chester Av | Super Home Builders Inc. | rev to pa 202110291440 replace 4 aluminum framed windows in exact opening.Details
rev to pa 202110291440 replace 4 aluminum framed windows in exact opening. | $8,000 |
| Feb 11, 2022 | Completed final sign-off Jun 2022 | 2559 15th Av | Super Home Builders Inc. | 1)front yard modification to address nov 202179017. 2)address landscape and permeable area requirements per planning.Details
1)front yard modification to address nov 202179017. 2)address landscape and permeable area requirements per planning. | $5,500 |
| Jan 6, 2022 | Completed final sign-off Jun 2022 | 887 Castro St | Super Home Builders Inc. | interior renovation of (e) master bathroom, 91sf. new plumbing, electrical, inteiror finisehs and new exhause fan. no change to 9e) area, use, height, structural system, fenestration system.Details
interior renovation of (e) master bathroom, 91sf. new plumbing, electrical, inteiror finisehs and new exhause fan. no change to 9e) area, use, height, structural system, fenestration system. | $16,500 |
| Jan 5, 2022 | Completed final sign-off Jan 2022 | 106 06th St | Super Home Builders Inc. | unit 410: replace existing wall and ceiling sheetrock with new 5/8" type 'x' drywall. approx 490 sf. uit 410 is a residential unit and not a tourist guestroom.Details
unit 410: replace existing wall and ceiling sheetrock with new 5/8" type 'x' drywall. approx 490 sf. uit 410 is a residential unit and not a tourist guestroom. | $5,500 |
| Nov 22, 2021 | Completed final sign-off Nov 2022 | 512 Gellert Dr | Super Home Builders Inc. | kitchen renovation with all existing shearwalls to remain. one new window. no increase of area, change of used, fire-rated wall, mechanical system.Details
kitchen renovation with all existing shearwalls to remain. one new window. no increase of area, change of used, fire-rated wall, mechanical system. | $24,500 |
| Nov 10, 2021 | Completed final sign-off Jan 2022 | 415 Vernon St | Super Home Builders Inc. | revision to pa# 2021-0806-5966; overall length of the concrete wall/foundation to be reducedDetails
revision to pa# 2021-0806-5966; overall length of the concrete wall/foundation to be reduced | |
| Oct 29, 2021 | Completed final sign-off Apr 2023 | 245 Chester Av | Super Home Builders Inc. | interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures.Details
interior renovation. reconfigure stair, relocate partitions. remodel bathroom & kitchen. new finishes & fixtures. | $150,000 |
| Oct 5, 2021 | Completed final sign-off Feb 2022 | 675 Minna St | Super Home Builders Inc. | t.i of an existing office 3272 sf at 3/f to relocate a breakroom that is currently two closed offices. open floor plan with new workstations. new vinyl floor finish except existing restrooms. no change to area, use, structural, lighting, hvac, fire life safety system.Details
t.i of an existing office 3272 sf at 3/f to relocate a breakroom that is currently two closed offices. open floor plan with new workstations. new vinyl floor finish except existing restrooms. no change to area, use, structural, lighting, hvac, fire life safety system. | $27,500 |
| Aug 6, 2021 | Never finaled issued Apr 2022, no final | 436 Ofarrell St | Super Home Builders Inc., C & K Housing Const Co *Ck Id* | revision to p.a. 2008-0805-8406. smoke containment work to an existing 6-stop. no structural work. voluntary accessibility improvement to unit 502.Details
revision to p.a. 2008-0805-8406. smoke containment work to an existing 6-stop. no structural work. voluntary accessibility improvement to unit 502. | $42,800 |
| Aug 6, 2021 | Completed final sign-off Jan 2022 | 415 Vernon St | Super Home Builders Inc. | foundation replacement along southern property line due to improper drainage & bamboo penetration from abutting neighbors. damaged 2x6 to be replaced in kind. restore interior finishes & electrical that are impacted. replace and repair sidings, install bambooo barrier & drainage along south prop.liDetails
foundation replacement along southern property line due to improper drainage & bamboo penetration from abutting neighbors. damaged 2x6 to be replaced in kind. restore interior finishes & electrical that are impacted. replace and repair sidings, install bambooo barrier & drainage along south prop.li | $36,800 |
| May 11, 2021 | Completed final sign-off Jul 2021 | 1421 Golden Gate Av | Super Home Builders Inc. | update one bathroom (replace all fixtures without re-routing the plumbing & electrical lines). no walls moved, demos, added or installed. all existing layouts to remain unchanged.Details
update one bathroom (replace all fixtures without re-routing the plumbing & electrical lines). no walls moved, demos, added or installed. all existing layouts to remain unchanged. | $10,000 |
| Mar 18, 2021 | Never finaled issued Jun 2021, no final | 1 San Pablo Av | Super Home Builders Inc. | driveway widening by relocating (e) low planting wall. new planting wall. new concrete finish. new sewer line.Details
driveway widening by relocating (e) low planting wall. new planting wall. new concrete finish. new sewer line. | $15,400 |
| Mar 4, 2021 | Completed final sign-off May 2021 | 57 Walter St | Super Home Builders Inc. | replace drywlal in storage room. approx 400 sq ft.Details
replace drywlal in storage room. approx 400 sq ft. | $3,000 |
| Jan 12, 2021 | Completed final sign-off Apr 2021 | 106 06th St | Super Home Builders Inc. | repair water damaged drywall at common hallway restroom. comply complaint 202071603, approx 240 sf of dry wall repairDetails
repair water damaged drywall at common hallway restroom. comply complaint 202071603, approx 240 sf of dry wall repair | $5,300 |
| Jul 9, 2020 | Never finaled issued Aug 2020, no final | 338 Hearst Av | Super Home Builders Inc. | rev to pa# 202002255416; replace portion of foundation at garageDetails
rev to pa# 202002255416; replace portion of foundation at garage | $2,000 |
| Feb 25, 2020 | Never finaled issued Feb 2020, no final | 338 Hearst Av | Super Home Builders Inc. | revision to app# 202001232607. extend foundation to property line on left side.Details
revision to app# 202001232607. extend foundation to property line on left side. | |
| Feb 7, 2020 | Never finaled issued Feb 2020, no final | 338 Hearst Av | Super Home Builders Inc. | revision to app#202001232607. replacement of additional foundation. revise foundation detail.Details
revision to app#202001232607. replacement of additional foundation. revise foundation detail. | $5,000 |
| Jan 23, 2020 | Never finaled issued Jan 2020, no final | 338 Hearst Av | Super Home Builders Inc. | replace existing slab foundationDetails
replace existing slab foundation | $12,000 |
| Nov 21, 2019 | Completed final sign-off Dec 2019 | 20 12th St | Super Home Builders Inc. | comply partially with nov 201975621, item no.8 only, repair stairwell hand railings.Details
comply partially with nov 201975621, item no.8 only, repair stairwell hand railings. | $3,000 |
| Oct 25, 2019 | Completed final sign-off Nov 2019 | 3607 Clement St | Super Home Builders Inc. | install new hardi plank siding over (e) plywood siding. side elevation not visible from the street. two side and back. ( not work at front elevation). replacement of t-1111 siding with hardiplank only.Details
install new hardi plank siding over (e) plywood siding. side elevation not visible from the street. two side and back. ( not work at front elevation). replacement of t-1111 siding with hardiplank only. | $15,000 |
| Aug 27, 2019 | Completed final sign-off Dec 2019 | 20 12th St | Super Home Builders Inc. | 2/f hallway common area, 3 shower rooms repair: replace front & middle 2 shower rooms shower pans & shower wall panels, 3 shower rooms floor coverings, rear shower room 1 light fixture.Details
2/f hallway common area, 3 shower rooms repair: replace front & middle 2 shower rooms shower pans & shower wall panels, 3 shower rooms floor coverings, rear shower room 1 light fixture. | $15,000 |
| Jul 31, 2019 | Expired or cancelled expired Jun 2023 | 516 Ofarrell St | Super Home Builders Inc. | unit 202: replace water damage drywall (total 226 sqft)Details
unit 202: replace water damage drywall (total 226 sqft) | $6,500 |
| May 1, 2019 | Completed final sign-off Oct 2019 | 338 Hearst Av | Super Home Builders Inc. | replace 6 existing windows. front two windows will be wood/clad and rear four windows will be vinyl.Details
replace 6 existing windows. front two windows will be wood/clad and rear four windows will be vinyl. | $2,400 |
| Apr 22, 2019 | Completed final sign-off Jun 2019 | 364 Eddy St | Super Home Builders Inc. | to comply with nov#201931701 in it's entirety. replace common area interior middle & rear stairwell hand railings (wood).Details
to comply with nov#201931701 in it's entirety. replace common area interior middle & rear stairwell hand railings (wood). | $3,000 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 1945 Mission St | Super Home Builders Inc. | install new hard plank siding over (e) plywood siding (back side free standing one wall ttl 1250 lt)Details
install new hard plank siding over (e) plywood siding (back side free standing one wall ttl 1250 lt) | $9,800 |
| Mar 27, 2019 | Completed final sign-off Jun 2019 | 364 Eddy St | Super Home Builders Inc. | to comply w/complaint #201931882 dated 2/27/2019, repair damage caused by a fire, work in unit #501, no structural work under this permit per nov. drawings wre not required for this reapair permit per nov.Details
to comply w/complaint #201931882 dated 2/27/2019, repair damage caused by a fire, work in unit #501, no structural work under this permit per nov. drawings wre not required for this reapair permit per nov. | $5,000 |
| Mar 5, 2019 | Completed final sign-off Apr 2019 | 210 Mississippi St | Super Home Builders Inc. | to comply with nov #201917981. remove one unpermitted north facing window. restore one hr fire rated wall assembly.Details
to comply with nov #201917981. remove one unpermitted north facing window. restore one hr fire rated wall assembly. | $2,000 |
| Dec 12, 2018 | Completed final sign-off Dec 2019 | 338 Hearst Av | Super Home Builders Inc. | to comply with nov#200001430. r1)remove walls(interior) at upper floor. 2) re install wall between bedrooms. 3) reconfigure sink a bathroom. 4)reconf. entry stairs. 5) remodel extg kitchen.remodel& repair less than 50%Details
to comply with nov#200001430. r1)remove walls(interior) at upper floor. 2) re install wall between bedrooms. 3) reconfigure sink a bathroom. 4)reconf. entry stairs. 5) remodel extg kitchen.remodel& repair less than 50% | $35,000 |
| Oct 24, 2018 | Completed final sign-off Sep 2019 | 106 06th St | Super Home Builders Inc. | repair 2 (e) balconies at 3rd flr. 2 missing balustrades will be provided. all rotted wood members to be replaced w/ correct waterproofing system. no change to use, height and window. work limited to balconies. less than 25% structural work replacement. maher n/a.Details
repair 2 (e) balconies at 3rd flr. 2 missing balustrades will be provided. all rotted wood members to be replaced w/ correct waterproofing system. no change to use, height and window. work limited to balconies. less than 25% structural work replacement. maher n/a. | $5,400 |
| Oct 9, 2018 | Completed final sign-off Jan 2019 | 1967 34th Av | Super Home Builders Inc. | update batrhoom replace bath tub, shower head & faucet, tiles, toilet, sink, electric outlet & switches. 2nd floor. 5'x8'. the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged.Details
update batrhoom replace bath tub, shower head & faucet, tiles, toilet, sink, electric outlet & switches. 2nd floor. 5'x8'. the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged. | $8,900 |
| Sep 17, 2018 | Completed final sign-off Aug 2019 | 579 Fell St | Super Home Builders Inc. | (n) tankless water heater to replace (e) wather heater, bathroom alteration- reconfigure & add shower stall, widen opening between kitchen & dining, relace rear windows w/sliding door, new skylight at shower, new lighting fixtues at kitchenDetails
(n) tankless water heater to replace (e) wather heater, bathroom alteration- reconfigure & add shower stall, widen opening between kitchen & dining, relace rear windows w/sliding door, new skylight at shower, new lighting fixtues at kitchen | $18,000 |
| Aug 28, 2018 | Never finaled issued Sep 2018, no final | 38 Bryant St | Super Home Builders Inc. | unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanelDetails
unit 709 - remodel kitchen & bathroom. no change to plumbing fixtures. add closet - remove non bearing wall at kitchen. relocate electrical subpanel | $10,000 |
| Aug 22, 2018 | Completed final sign-off Dec 2018 | 57 Walter St | Super Home Builders Inc. | open wall between kitchen and living room at unit 57. reroute kitchen exhaust flues from lower level to roof remoel kitchenDetails
open wall between kitchen and living room at unit 57. reroute kitchen exhaust flues from lower level to roof remoel kitchen | $18,000 |
| Aug 20, 2018 | Completed final sign-off Sep 2018 | 418 Victoria St | Super Home Builders Inc. | remodel bathroom (replace bathtub, shower head, fancet, tiles, toilet, sink, vanity, medicine cabinet, electrial outlets and switches) the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged.Details
remodel bathroom (replace bathtub, shower head, fancet, tiles, toilet, sink, vanity, medicine cabinet, electrial outlets and switches) the job performed without re-routing the plumbing lines. no walls moved, demoed, added or installed. all existing layouts to remain unchanged. | $8,800 |
| Jun 8, 2018 | Completed final sign-off Aug 2018 | 1770 Ofarrell St | Super Home Builders Inc. | update kitchen, replace all fixtures and appliances. no wall removed, demoed, added or installed. all existing layouts to remain unchanged.Details
update kitchen, replace all fixtures and appliances. no wall removed, demoed, added or installed. all existing layouts to remain unchanged. | $13,000 |
| Apr 30, 2018 | Completed final sign-off Sep 2018 | 580 20th Av | Super Home Builders Inc. | update bathroom & kitchen (replace all fixtures & appliances). the job will be performed without re-routing the plumbing lines. no walls, removed, demoed, added or installed. all existing layouts to remain unchanged.Details
update bathroom & kitchen (replace all fixtures & appliances). the job will be performed without re-routing the plumbing lines. no walls, removed, demoed, added or installed. all existing layouts to remain unchanged. | $25,000 |
| Mar 16, 2018 | Completed final sign-off Jun 2018 | 560 Noe St | Super Home Builders Inc. | front stair dry rot repair; 5 treads and risers, 3' x 7' landing boards; 1" x 8" x 3' stair side board. work less than 50%.Details
front stair dry rot repair; 5 treads and risers, 3' x 7' landing boards; 1" x 8" x 3' stair side board. work less than 50%. | $4,500 |
| Mar 7, 2018 | Completed final sign-off Dec 2018 | 92 Coventry Ct | Super Home Builders Inc. | update bathroom (replace bath tub, shower door, shower head and faucet, tiles, toilet, sink, medicine cabinet, electric outlet and switch) the job performed without reouting the plumbing lines. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
update bathroom (replace bath tub, shower door, shower head and faucet, tiles, toilet, sink, medicine cabinet, electric outlet and switch) the job performed without reouting the plumbing lines. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $7,800 |
| Dec 6, 2017 | Completed final sign-off Dec 2017 | 51 06th St | Super Home Builders Inc. | repair, patch the section of the ceiling (4'x5') that has been removed in basement near the back wall in the large room outside the boiler room. to comply with nov #201792251, item #4. maher n/aDetails
repair, patch the section of the ceiling (4'x5') that has been removed in basement near the back wall in the large room outside the boiler room. to comply with nov #201792251, item #4. maher n/a | $1,500 |
| Nov 13, 2017 | Completed final sign-off Dec 2017 | 1821 Cabrillo St | Super Home Builders Inc. | replace siding for back and left side of the building with hardie plank siding. front facade stucco to remain.Details
replace siding for back and left side of the building with hardie plank siding. front facade stucco to remain. | $31,000 |
| Mar 2, 2017 | Completed final sign-off Jun 2017 | 675 Minna St | Super Home Builders Inc. | existing ground floor office in residential bldg to be remodeled with independent iffices requiring new acoustical walls w/altered air registered & lighting. exisitng admin space is remodeled with new partitions. life safety deferred.Details
existing ground floor office in residential bldg to be remodeled with independent iffices requiring new acoustical walls w/altered air registered & lighting. exisitng admin space is remodeled with new partitions. life safety deferred. | $72,000 |
| Jan 18, 2017 | Completed final sign-off Jan 2017 | 51 06th St | Super Home Builders Inc. | provide a fire rated door at the entrance to the basement were there is a screen door now. to comply with notice of viovlation #201642691 - 90 min door with door closer.Details
provide a fire rated door at the entrance to the basement were there is a screen door now. to comply with notice of viovlation #201642691 - 90 min door with door closer. | $1,500 |
| Aug 24, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | Super Home Builders Inc., Nomellini Construction * Ask For Id * | apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl.Details
apt 1401: kitchen & bathroom renovation (new fixtures). no walls changed or removedl. | $20,000 |
| Jul 25, 2016 | Completed final sign-off Jan 2017 | 350 Turk St | Super Home Builders Inc., Nomellini Construction * Ask For Id * | apt 705: kitchen & bathroom remodel. as like, new fixtures.Details
apt 705: kitchen & bathroom remodel. as like, new fixtures. | $20,000 |
| Jul 19, 2016 | Completed final sign-off Sep 2019 | 969 Burnett Av | Super Home Builders Inc. | e lobby renovation with new finishes, lighting and exterior address sign. repair and reconstruct e door in kind. fire alarm panel relocation under deferred submittal.Details
e lobby renovation with new finishes, lighting and exterior address sign. repair and reconstruct e door in kind. fire alarm panel relocation under deferred submittal. | $7,098 |