Iyer & Associates Iyer & Associates
- Listed as
- architect, authorized agent-others
- Firm
- Iyer & Associates
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Jun 2025
17 permits since 2000 (architect on 16 permits, authorized agent-others on 1 permit): 4 completed, 2 in progress, 8 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 3516 Divisadero St | G A G Construction Co | to correct construction of a stair penthouse as per planning approval 2024007495prj.Details
to correct construction of a stair penthouse as per planning approval 2024007495prj. | $5,000 |
| Jun 16, 2023 | Never finaled filed Jun 2023, never issued | 135 Gough St | main entrance for #135 -for compliance with abe program requesting technical in-feasibility, abe202001070674 due to space constraint.Details
main entrance for #135 -for compliance with abe program requesting technical in-feasibility, abe202001070674 due to space constraint. | $650 | |
| May 19, 2023 | Never finaled filed May 2023, never issued | 465 Grove St | to demolish all of the (e) buildings which includes (36 tourist rooms and 5 sro rooms and adjacent 2 unit residential building) and remove parking lot asphalt to grade level with new building entitlement app under dcp 2016-001059prj.Details
to demolish all of the (e) buildings which includes (36 tourist rooms and 5 sro rooms and adjacent 2 unit residential building) and remove parking lot asphalt to grade level with new building entitlement app under dcp 2016-001059prj. | $20,000 | |
| May 9, 2023 | Completed final sign-off Jul 2024 | 930 Cayuga Av | Meneses Construction (Ck Id) | revise footing of the retaining wall under permit#202209011702 to complt with complaint# 202283694Details
revise footing of the retaining wall under permit#202209011702 to complt with complaint# 202283694 | |
| Dec 29, 2022 | Never finaled filed Dec 2022, never issued | 465 Grove St | abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060640".Details
abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060640". | $1,000 | |
| Dec 28, 2022 | In progress issued Mar 2024 | 2707 Lombard St | abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202208253170"Details
abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202208253170" | $1,000 | |
| Dec 27, 2022 | Never finaled filed Dec 2022, never issued | 2440 Lombard St | abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby. entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060636".Details
abe: to stripe new path of travel as on shown on drawings from sidewalk to front lobby. entrance to meet mandatory san francisco accessible business entrance program. for compliance with the abe program "abe 202001060636". | $1,000 | |
| Dec 8, 2020 | Never finaled issued Nov 2022, no final | 259 07th St | Pars Power Inc | install new ada compliant elevator in existing 3 story building (hotel)Details
install new ada compliant elevator in existing 3 story building (hotel) | $80,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 3516 Divisadero St | G A G Construction Co | interior changes as shown on drawings. ref existing permit #201509106555-s1.Details
interior changes as shown on drawings. ref existing permit #201509106555-s1. | $250,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 259 07th St | convert (e) rooms to 2 ada compliant rooms as shown on drwgs maher naDetails
convert (e) rooms to 2 ada compliant rooms as shown on drwgs maher na | $20,000 | |
| Sep 15, 2016 | Never finaled issued Sep 2018, no final | 465 Grove St | seismic upgrade for soft story building chapter 34b; 2012 iebc appendix a-4.Details
seismic upgrade for soft story building chapter 34b; 2012 iebc appendix a-4. | $10,000 | |
| Nov 5, 2014 | Expired or cancelled cancelled Jan 2026 | 753 Bush St | structural slab repalcement in sidewalkDetails
structural slab repalcement in sidewalk | $4,000 | |
| Nov 20, 2009 | Completed final sign-off Dec 2009 | 608 Geary St | change countertop w/ granite on existing coffee shop. paint walls relocate sink, install (n) outlets, install (n) yogurt machineDetails
change countertop w/ granite on existing coffee shop. paint walls relocate sink, install (n) outlets, install (n) yogurt machine | $2,400 | |
| Nov 10, 2008 | Expired or cancelled cancelled Apr 2012 | 753 Bush St | replace existing entry door, w/ new automatic door, and landing @ steps w/ new ada compliance landing & steps. to comply w/ nov his 200879284.Details
replace existing entry door, w/ new automatic door, and landing @ steps w/ new ada compliance landing & steps. to comply w/ nov his 200879284. | $3,000 | |
| Sep 11, 2008 | Completed final sign-off Oct 2008 | 896 Folsom St | Build Group Inc. | demolition of interior partial height partitions, platform, closet, non compliant stair. exploratory dmeolition at restroom. space to remain vacant until future renovation under sep permit per ab-017.Details
demolition of interior partial height partitions, platform, closet, non compliant stair. exploratory dmeolition at restroom. space to remain vacant until future renovation under sep permit per ab-017. | $3,000 |
| Jul 25, 2008 | Completed final sign-off Aug 2009 | 2123 Funston Av | Occidental Express | building a small room above the (e) garage with skylight. replace (e) sliding doors at deck. add new deck over garage, revision to deck with new structural members, 2007-1012-5268.short deck off new door above existing garage.Details
building a small room above the (e) garage with skylight. replace (e) sliding doors at deck. add new deck over garage, revision to deck with new structural members, 2007-1012-5268.short deck off new door above existing garage. | $70,000 |
| Jul 8, 2003 | Expired or cancelled expired May 2004 | 2707 Lombard St | revise ramp from apprvd set 200112115029- and door swing directionDetails
revise ramp from apprvd set 200112115029- and door swing direction | $500 |