Rachel Lee
- License
- C30041
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Hok
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Jun 2020
10 permits since 2000 (architect on 10 permits): 10 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (5), Ayoob & Peery Plumbing Co Inc (2), Bcci Construction Company, Devcon Construction
- Engineers
- Michael Gemmill (2), Nabin Yousseff Associates
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 19, 2020 | Completed final sign-off Feb 2022 | 185 Berry St | Hathaway Dinwiddie Co. | revision to pa# 201903296675. modification to the interior north south collector plates. this includes changing most of the north -south collector plates from bolted connections to welded connections & moving some collector plates from the underside of the (e) slab to the topside. ** maher: n/a **Details
revision to pa# 201903296675. modification to the interior north south collector plates. this includes changing most of the north -south collector plates from bolted connections to welded connections & moving some collector plates from the underside of the (e) slab to the topside. ** maher: n/a ** | |
| Apr 27, 2020 | Completed final sign-off Feb 2022 | 185 Berry St | Hathaway Dinwiddie Co. | revision to foundation system pa# 2019-0329-6675.**maher n/a**Details
revision to foundation system pa# 2019-0329-6675.**maher n/a** | |
| Dec 23, 2019 | Completed final sign-off Apr 2022 | 185 Berry St | Hathaway Dinwiddie Co. | each of the 5 steel buttresses at the ground floor level will be painted with intunescent paint up to the new ceiling so they could be occupied by people. new finishes will be added to the bottom of the concrete deck along the whole length of the wharf side bldg.Details
each of the 5 steel buttresses at the ground floor level will be painted with intunescent paint up to the new ceiling so they could be occupied by people. new finishes will be added to the bottom of the concrete deck along the whole length of the wharf side bldg. | $1,100,000 |
| Nov 15, 2019 | Completed final sign-off Aug 2021 | 185 Berry St | removal & infill of service elevator & market ready the suite where the elevator is located for lease to tenants, remove all mechanincal, elec, & plumbing system, and cap off the ceiling at the wall boundiary n/a maherDetails
removal & infill of service elevator & market ready the suite where the elevator is located for lease to tenants, remove all mechanincal, elec, & plumbing system, and cap off the ceiling at the wall boundiary n/a maher | $657,000 | |
| Nov 4, 2019 | Completed final sign-off Jun 2021 | 185 Berry St | Hathaway Dinwiddie Co. | renovation of mccarthy cook management office and conference center. renovation of showrs for tenants, renovation of seating area of focaccia restaurant space. addition of bar at focaccia. removal and additoin of new doors at lobby 3 of wharf building and at main lobby at berryDetails
renovation of mccarthy cook management office and conference center. renovation of showrs for tenants, renovation of seating area of focaccia restaurant space. addition of bar at focaccia. removal and additoin of new doors at lobby 3 of wharf building and at main lobby at berry | $3,797,099 |
| Mar 29, 2019 | Completed final sign-off Apr 2022 | 185 Berry St | Hathaway Dinwiddie Co. | voluntary seismic upgrade of existing china basin wharfside building.Details
voluntary seismic upgrade of existing china basin wharfside building. | $54,876,000 |
| Jan 7, 2008 | Completed final sign-off Jul 2008 | 185 Berry St | Devcon Construction | work @ unit# 6500 only. remodel (e) office space with m.e.p. no structural work.Details
work @ unit# 6500 only. remodel (e) office space with m.e.p. no structural work. | $350,000 |
| Aug 6, 2007 | Completed final sign-off Jan 2008 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | relocaste and add sprinkler head per tenant imporvements new heads 15, relocate 203Details
relocaste and add sprinkler head per tenant imporvements new heads 15, relocate 203 | $55,750 |
| Aug 6, 2007 | Completed final sign-off Feb 2008 | 50 Beale St | Ayoob & Peery Plumbing Co Inc | relocate and add sprinklers per tenant imporvements on 14th floor. new heads 40, relocate 223Details
relocate and add sprinklers per tenant imporvements on 14th floor. new heads 40, relocate 223 | $64,000 |
| Feb 2, 2007 | Completed final sign-off Oct 2008 | 185 Berry St | Bcci Construction Company | minor demolition at 2 building lobbies, new store front doors, new finishes, lighting @ new lobbies associated mep for above work. nov #200684251 - bid.Details
minor demolition at 2 building lobbies, new store front doors, new finishes, lighting @ new lobbies associated mep for above work. nov #200684251 - bid. | $1,585,000 |