Richard E. Calderon
- Listed as
- authorized agent-others, contractor
- Firm
- R. C. Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2023
164 permits since 2000 (contractor on 164 permits, authorized agent-others on 1 permit): 124 completed, 16 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 164.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2023 | Expired or cancelled withdrawn Dec 2024 | 5945 03rd St | Ehj Construction,Inc., R. C. Construction | tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work.Details
tenant improvement: new counseling room at ground floor. new doors adn interior windows at (e) second floor counseling rooms - no structural work. | $26,700 |
| Jan 5, 2023 | Completed final sign-off Mar 2023 | 195 26th Av | R. C. Construction | revision to soft story mitigation 201709148114 to remove accomodations future aduDetails
revision to soft story mitigation 201709148114 to remove accomodations future adu | |
| Nov 22, 2022 | Completed final sign-off Feb 2023 | 206 Harold Av | R. C. Construction | revision to application # 202209263136: sheetrock and insulation for 2 bedrooms, dining room, and laundry room.Details
revision to application # 202209263136: sheetrock and insulation for 2 bedrooms, dining room, and laundry room. | $12,000 |
| Sep 26, 2022 | Completed final sign-off Feb 2023 | 206 Harold Av | R. C. Construction | kitchen and bathroom remode. like foor like for like kind. no walls will be moved or removed.Details
kitchen and bathroom remode. like foor like for like kind. no walls will be moved or removed. | $60,000 |
| Jul 25, 2022 | Never finaled filed Jul 2022, never issued | 727 Madrid St | R. C. Construction | to comply with nov # 202293386. new decks at the rear at 1st & 2nd floors.Details
to comply with nov # 202293386. new decks at the rear at 1st & 2nd floors. | $25,000 |
| Apr 4, 2022 | Never finaled issued Apr 2022, no final | 461 Greenwich St | R. C. Construction | remodel extg bath remodel extg kitchen like for like kind for like kind. add new laundry and add new bathDetails
remodel extg bath remodel extg kitchen like for like kind for like kind. add new laundry and add new bath | $60,000 |
| Jan 27, 2022 | Completed final sign-off Aug 2022 | 944 Vallejo St | R. C. Construction | front building: add wet bar. remodel bathroom in-kind. 944f sleeping room in front building under 2 units.Details
front building: add wet bar. remodel bathroom in-kind. 944f sleeping room in front building under 2 units. | $15,000 |
| Dec 28, 2021 | Completed final sign-off Apr 2022 | 145 Mansell St | R. C. Construction | like kind kitchen remodel. upgrade cabinets, flooring, lighting & plumbing. not removing walls, no new openings.Details
like kind kitchen remodel. upgrade cabinets, flooring, lighting & plumbing. not removing walls, no new openings. | $25,000 |
| Oct 4, 2021 | Completed final sign-off Feb 2022 | 946 Vallejo St | R. C. Construction | convert existing closet to a new half bath. remodel exising bathroom under permit 202109148419. not moving any walls. lighting to comply with cec 150.0(k). replace countertop and backsplash in the existing kitchen. all non-structural.Details
convert existing closet to a new half bath. remodel exising bathroom under permit 202109148419. not moving any walls. lighting to comply with cec 150.0(k). replace countertop and backsplash in the existing kitchen. all non-structural. | $20,000 |
| Sep 14, 2021 | Completed final sign-off Feb 2022 | 946 Vallejo St | R. C. Construction | bath like for like kind. no removal of walls. lighting comply with cec 150.0(k).Details
bath like for like kind. no removal of walls. lighting comply with cec 150.0(k). | $10,000 |
| Aug 3, 2021 | Completed final sign-off Jun 2022 | 98 Estero Av | R. C. Construction | kitchen remodel: replace plumbing fixtures and appliances in (e) locations and move range to north wall. new cabinets counters, tile, flooring. replace 3 windows in-kind (glazing). replacement windows to match in-kind material operation.Details
kitchen remodel: replace plumbing fixtures and appliances in (e) locations and move range to north wall. new cabinets counters, tile, flooring. replace 3 windows in-kind (glazing). replacement windows to match in-kind material operation. | $25,000 |
| Apr 26, 2021 | Completed final sign-off Feb 2023 | 5288 03rd St | R. C. Construction | replacement of damaged rear extension stair.Details
replacement of damaged rear extension stair. | $40,000 |
| Nov 13, 2020 | Completed final sign-off Nov 2020 | 89 Cortland Av | R. C. Construction | 10 windows replacement like kind for like kind. all visible from street. vinyl to vinylDetails
10 windows replacement like kind for like kind. all visible from street. vinyl to vinyl | $3,000 |
| Oct 29, 2020 | Completed final sign-off Mar 2021 | 1781 Oak St | R. C. Construction | unit# 4: kitchen and bathroom remodel, like for like, like kind.Details
unit# 4: kitchen and bathroom remodel, like for like, like kind. | $30,000 |
| Sep 9, 2020 | Completed final sign-off Apr 2021 | 1856 Green St | R. C. Construction | replace kitchen cabinets, fixtures, flooring , countertops. like for like in kind. remodel bath like for likeDetails
replace kitchen cabinets, fixtures, flooring , countertops. like for like in kind. remodel bath like for like | $36,000 |
| Jun 10, 2020 | Completed final sign-off Jan 2022 | 3426 22nd St | R. C. Construction | to comply with dbi nov #01987211 & #201989011 and planning nov 2019-018120 enf. to consolidate, supersede and cancel previously issued building permits. the plans document the full scope of previously permitted & unpermitted work.Details
to comply with dbi nov #01987211 & #201989011 and planning nov 2019-018120 enf. to consolidate, supersede and cancel previously issued building permits. the plans document the full scope of previously permitted & unpermitted work. | $420,000 |
| Oct 29, 2019 | Never finaled issued Dec 2019, no final | 117 Bartlett St | R. C. Construction | comply with nov 201971281, foundation workDetails
comply with nov 201971281, foundation work | $10,000 |
| Sep 17, 2019 | Completed final sign-off Dec 2019 | 1563 Mission St | R. C. Construction | ti @ 2nd fl - remove interior partitions, add new parttions and doorsDetails
ti @ 2nd fl - remove interior partitions, add new parttions and doors | $40,000 |
| Aug 19, 2019 | Completed final sign-off Nov 2020 | 89 Cortland Av | R. C. Construction | remodel kitchen & bathroom. no fixtures to be moved. no walls to be moved.Details
remodel kitchen & bathroom. no fixtures to be moved. no walls to be moved. | $20,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2019 | 22 Beaver St | R. C. Construction | install bronze landmark plaque, top of plaque to be aligned with adjacent midpoint window mullion.Details
install bronze landmark plaque, top of plaque to be aligned with adjacent midpoint window mullion. | $100 |
| May 2, 2019 | Completed final sign-off Jul 2020 | 4024 25th St | R. C. Construction | replace (e) footing at westside 30 ft longDetails
replace (e) footing at westside 30 ft long | $18,000 |
| Feb 20, 2019 | Never finaled issued Feb 2019, no final | 890 Hayes St | R. C. Construction | street spaceDetails
street space | |
| Jan 30, 2019 | Never finaled issued Mar 2019, no final | 3927 24th St | R. C. Construction | barrier removal only to rear yard. remove man door and install patio door 9ft x 7 for access to rear yard from retail space. current door not ada compliant (no change in use nor other tenant improvement work)Details
barrier removal only to rear yard. remove man door and install patio door 9ft x 7 for access to rear yard from retail space. current door not ada compliant (no change in use nor other tenant improvement work) | $5,000 |
| Dec 31, 2018 | Completed final sign-off Mar 2019 | 3927 24th St | R. C. Construction | remodel bath and wet bar sink, new toilet, sink, tile approx 8x10Details
remodel bath and wet bar sink, new toilet, sink, tile approx 8x10 | $25,000 |
| Dec 24, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | R. C. Construction | 1)rebuild required exit deck and stairs at rear due to dryrot. 2)rebuild front step due to dryrot, use front botton concrete step. 3)install 6' fence with 2' trellis on ames alley.Details
1)rebuild required exit deck and stairs at rear due to dryrot. 2)rebuild front step due to dryrot, use front botton concrete step. 3)install 6' fence with 2' trellis on ames alley. | $25,000 |
| Dec 17, 2018 | Completed final sign-off Feb 2019 | 21 Costa St | R. C. Construction | install a 1/2 bathroom at garage level. thehalf bathroom is 25sf with a sink and a toilet and is non-habitiable, nonconditioned space.Details
install a 1/2 bathroom at garage level. thehalf bathroom is 25sf with a sink and a toilet and is non-habitiable, nonconditioned space. | $10,000 |
| Dec 17, 2018 | Never finaled issued Jan 2019, no final | 326 Anderson St | R. C. Construction | 201replacement of two windows in same location at living room. no structural work needed. no plans. facing the street. new windows will be wood. windows face jarboe.Details
201replacement of two windows in same location at living room. no structural work needed. no plans. facing the street. new windows will be wood. windows face jarboe. | $2,500 |
| Nov 29, 2018 | Completed final sign-off Feb 2019 | 264 Precita Av | R. C. Construction | kitchenremodel. all plumbing fixtures to remain at same location. 12'x12"Details
kitchenremodel. all plumbing fixtures to remain at same location. 12'x12" | $30,000 |
| Nov 29, 2018 | Completed final sign-off May 2019 | 1050 North Point St | R. C. Construction | unit #706. kitchen and bathroom remodel. all plumbing fixtures to remain at same location. 7ft x 7ft kitchen, 4'6' x 6ft bathroomDetails
unit #706. kitchen and bathroom remodel. all plumbing fixtures to remain at same location. 7ft x 7ft kitchen, 4'6' x 6ft bathroom | $40,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | R. C. Construction | remodel 3426 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroom @ 1/2 bathDetails
remodel 3426 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroom @ 1/2 bath | $50,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jul 2020 | 3430 22nd St | R. C. Construction | remodel 3430 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroomDetails
remodel 3430 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroom | $50,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jul 2020 | 3428 22nd St | R. C. Construction | remodel 3428 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroomDetails
remodel 3428 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroom | $50,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jul 2020 | 3432 22nd St | R. C. Construction | remodel 3432 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroomDetails
remodel 3432 22nd st interior remodel existing kitchen and bathroom. add a 2nd bathroom | $50,000 |
| Nov 21, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | R. C. Construction | remove modern plywood siding over 2 abandoned window @ garage, replace w/shiplap siding. also remove 2 abandoned door (tiii plywood) and install ship lap siding. reframe existing garage door center at bay above to 8' wideDetails
remove modern plywood siding over 2 abandoned window @ garage, replace w/shiplap siding. also remove 2 abandoned door (tiii plywood) and install ship lap siding. reframe existing garage door center at bay above to 8' wide | $5,000 |
| Aug 20, 2018 | Never finaled issued Aug 2018, no final | 1019 Guerrero St | R. C. Construction | kitchen remodel in kind, no moving wallsDetails
kitchen remodel in kind, no moving walls | $25,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 479 Steiner St | R. C. Construction | kitchen remodel in kind, everything in same location. no moving of walls or doors.Details
kitchen remodel in kind, everything in same location. no moving of walls or doors. | $20,000 |
| Aug 1, 2018 | Completed final sign-off Aug 2018 | 479 Steiner St | R. C. Construction | unit 7: replaced dryrot deck removed for roofing (e) deckDetails
unit 7: replaced dryrot deck removed for roofing (e) deck | $6,000 |
| Aug 1, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | R. C. Construction | replacement of windows (14 front & 6 sides) from aluminum to wood, single-hung upper sash with rounded arch, ogee lugs, within existing openings.Details
replacement of windows (14 front & 6 sides) from aluminum to wood, single-hung upper sash with rounded arch, ogee lugs, within existing openings. | $12,000 |
| Jul 12, 2018 | Expired or cancelled cancelled Jul 2020 | 3426 22nd St | R. C. Construction | remodel kitchen & bathDetails
remodel kitchen & bath | $25,000 |
| Jun 27, 2018 | Completed final sign-off Jul 2018 | 241 Noe St | R. C. Construction | to comply w/dbi n. o.v. #201872481 item #10. repair rear steps not more than 50% removed.Details
to comply w/dbi n. o.v. #201872481 item #10. repair rear steps not more than 50% removed. | $4,000 |
| Dec 29, 2017 | Completed final sign-off Mar 2018 | 284 Douglass St | R. C. Construction | (e) kitchen will be upgrades. wall with fireplace will be replace with kitchen island maher naDetails
(e) kitchen will be upgrades. wall with fireplace will be replace with kitchen island maher na | $20,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2017 | 65 Ora Wy | R. C. Construction | unit 302: convert tub to a shower. no changes on walls.Details
unit 302: convert tub to a shower. no changes on walls. | $10,000 |
| Sep 15, 2017 | Completed final sign-off May 2020 | 88 Castro St | R. C. Construction | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $90,000 |
| Sep 14, 2017 | Completed final sign-off Mar 2023 | 195 26th Av | R. C. Construction | soft story retrofit per 2016 sfebc ch 4d per 2016 cebc ap a4Details
soft story retrofit per 2016 sfebc ch 4d per 2016 cebc ap a4 | $90,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2018 | 944 Vallejo St | R. C. Construction | rear bldg - revision to pa 2017-0420-4444, change location of kitchenDetails
rear bldg - revision to pa 2017-0420-4444, change location of kitchen | |
| Aug 11, 2017 | Completed final sign-off Mar 2018 | 1126 Sanchez St | R. C. Construction | unit 3: renovate (e) kitchen, bathroom & laundry closet, no changes to (e) walls.Details
unit 3: renovate (e) kitchen, bathroom & laundry closet, no changes to (e) walls. | $35,000 |
| Aug 3, 2017 | Completed final sign-off Oct 2017 | 2007 Fulton St | R. C. Construction | kitchen & bath renovations, replace like for likeDetails
kitchen & bath renovations, replace like for like | $35,000 |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 1037 Broadway | R. C. Construction | in unit: renovating (e) kitchen, (e) bathroom. no work on exterior walls. (e) single pane aluminum windows to be relaced with milgard fiberglass windows & doors. replace (e) vinyl floors with tile. addition of shared laundry & shared trash area for building.Details
in unit: renovating (e) kitchen, (e) bathroom. no work on exterior walls. (e) single pane aluminum windows to be relaced with milgard fiberglass windows & doors. replace (e) vinyl floors with tile. addition of shared laundry & shared trash area for building. | $30,000 |
| Jul 7, 2017 | Completed final sign-off Mar 2019 | 46 Portola Dr | Atn Builders Inc, R. C. Construction | remodel kitchen and 2 bathrooms, replace all fixtures, like for like.Details
remodel kitchen and 2 bathrooms, replace all fixtures, like for like. | $40,000 |
| Jun 14, 2017 | Completed final sign-off Jul 2017 | 42 Rebecca Ln | R. C. Construction | window addition totaling 4 new windows, 2 in kitchen 28"x34", 1 in second level bathroom, 36"x12", 1 in first level bathroom 14"x32". new windows. not visible from streetDetails
window addition totaling 4 new windows, 2 in kitchen 28"x34", 1 in second level bathroom, 36"x12", 1 in first level bathroom 14"x32". new windows. not visible from street | $15,000 |
| May 26, 2017 | Completed final sign-off Jun 2017 | 121 Fair Oaks St | R. C. Construction | one bathroom remodel like for like. replace plumbing fixtures and lighting. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
one bathroom remodel like for like. replace plumbing fixtures and lighting. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $10,000 |
| May 11, 2017 | Completed final sign-off Jul 2017 | 336 Castro St | R. C. Construction | kitche & bath remodel replace like for like no plans, al l(e) layout to remain unchanged kitchen lighting to comply with cec 150kDetails
kitche & bath remodel replace like for like no plans, al l(e) layout to remain unchanged kitchen lighting to comply with cec 150k | $30,000 |
| Apr 20, 2017 | Completed final sign-off Mar 2018 | 944 Vallejo St | R. C. Construction | rear bldg: kitchen and bath renovation. add half bathDetails
rear bldg: kitchen and bath renovation. add half bath | $30,000 |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 195 26th Av | R. C. Construction | replacement of windows size for size for entire structure. milgard woodclad essence series.Details
replacement of windows size for size for entire structure. milgard woodclad essence series. | $50,000 |
| Feb 22, 2017 | Completed final sign-off Sep 2017 | 195 26th Av | R. C. Construction | unit #5: renovating kitchen, laundry and bath, addition of 1 full bathroom anbd conversion of kitchen to office/den. no work at exterior walls, all (e) windows to remain except one which is a reducation of glazing, window opening will not change.Details
unit #5: renovating kitchen, laundry and bath, addition of 1 full bathroom anbd conversion of kitchen to office/den. no work at exterior walls, all (e) windows to remain except one which is a reducation of glazing, window opening will not change. | $40,000 |
| Feb 13, 2017 | Completed final sign-off Apr 2017 | 1832 Lyon St | R. C. Construction | kitchen & bathroom remodel. replace like for like. replacing cabinets, countertops & appliances only.Details
kitchen & bathroom remodel. replace like for like. replacing cabinets, countertops & appliances only. | $30,000 |
| Jan 13, 2017 | Completed final sign-off Mar 2017 | 336 Castro St | R. C. Construction | kitchen & bathroom remodel: replace like for like. no plans. no walls moved, removed, added or in-filoled. all (e) layouts to remain unchanged.Details
kitchen & bathroom remodel: replace like for like. no plans. no walls moved, removed, added or in-filoled. all (e) layouts to remain unchanged. | $20,000 |
| Dec 21, 2016 | Completed final sign-off Mar 2017 | 73 Coleridge St | R. C. Construction | kitchen remodel, replace like kind for like kind, unit #73Details
kitchen remodel, replace like kind for like kind, unit #73 | $18,000 |
| Dec 1, 2016 | Completed final sign-off Jun 2017 | 195 26th Av | R. C. Construction | apt 4: renovate kitchen, laundry and bath. addition of 1 full bathroom and conversion of dining room to bedroom.Details
apt 4: renovate kitchen, laundry and bath. addition of 1 full bathroom and conversion of dining room to bedroom. | $47,000 |
| Nov 3, 2016 | Completed final sign-off Nov 2016 | 1298 Treat Av | R. C. Construction | revision to app#201609289022. 2nd bathroom was torn out when property was purchased. we are just putting it back. add bathroom with shower, toilet, and sink.Details
revision to app#201609289022. 2nd bathroom was torn out when property was purchased. we are just putting it back. add bathroom with shower, toilet, and sink. | |
| Sep 28, 2016 | Completed final sign-off Nov 2016 | 1298 Treat Av | R. C. Construction | kitchen upgrade like kind for like kind. 2 bathrooms upgrade, like kind for like kind.Details
kitchen upgrade like kind for like kind. 2 bathrooms upgrade, like kind for like kind. | $32,000 |
| Jul 26, 2016 | Completed final sign-off Jan 2017 | 1856 Green St | R. C. Construction | unit 5 on 1st floor - kitchen and bathroom remodel, remove back fireplace, add concrete footing, add header.Details
unit 5 on 1st floor - kitchen and bathroom remodel, remove back fireplace, add concrete footing, add header. | $35,000 |
| Jul 18, 2016 | Completed final sign-off Aug 2017 | 74 San Jacinto Wy | R. C. Construction | kitchen cabinets replace like kind,remove wall.Details
kitchen cabinets replace like kind,remove wall. | $20,000 |
| Jun 13, 2016 | Completed final sign-off Oct 2016 | 121 Delmar St | R. C. Construction | remodel kitchen: replace like-kind for like kind.Details
remodel kitchen: replace like-kind for like kind. | $20,000 |
| Jun 7, 2016 | Completed final sign-off Oct 2016 | 336 Castro St | R. C. Construction | replace aluminim windows in 2nd and 3rd story with essence series milgard windows. w/historical preservation kit (deeper set reveal and historically accurate trim) 12 bedroom windows to meet pop-out egress requirements per sffd. max u-factor 0.32Details
replace aluminim windows in 2nd and 3rd story with essence series milgard windows. w/historical preservation kit (deeper set reveal and historically accurate trim) 12 bedroom windows to meet pop-out egress requirements per sffd. max u-factor 0.32 | $20,000 |
| May 27, 2016 | Completed final sign-off Jun 2017 | 944 Vallejo St | R. C. Construction | cut concrete to allow for 3 new 1 hr rated windows. provide pressure treated joists & wood finish on the floor. provide new outlets and lights, with a sub panel in the renovated shared laundry space. new windo and door at the entry to replace (e). new hvac system to provide better ventelationDetails
cut concrete to allow for 3 new 1 hr rated windows. provide pressure treated joists & wood finish on the floor. provide new outlets and lights, with a sub panel in the renovated shared laundry space. new windo and door at the entry to replace (e). new hvac system to provide better ventelation | $20,000 |
| May 27, 2016 | Completed final sign-off Mar 2017 | 71 Coleridge St | R. C. Construction | unit #71: kitchen remodel replace like kind for like kind.Details
unit #71: kitchen remodel replace like kind for like kind. | $18,000 |
| May 2, 2016 | Expired or cancelled withdrawn May 2016 | 150 Ellert St | R. C. Construction | revision to app#201603010883 to remove wall.Details
revision to app#201603010883 to remove wall. | $1,000 |
| Apr 7, 2016 | Completed final sign-off May 2016 | 154 Coleridge St | R. C. Construction | replace dry rot siding visible to street. repair wood siding in-kind.Details
replace dry rot siding visible to street. repair wood siding in-kind. | $2,500 |
| Mar 1, 2016 | Completed final sign-off May 2016 | 150 Ellert St | R. C. Construction | remodel kitchen, remodel bathDetails
remodel kitchen, remodel bath | $20,000 |
| Feb 9, 2016 | Completed final sign-off May 2016 | 1547 Dolores St | R. C. Construction | bathroom & kitchen remodel.Details
bathroom & kitchen remodel. | $40,000 |
| Dec 9, 2015 | Completed final sign-off Feb 2016 | 136 Cambridge St | R. C. Construction | kitchen & (1) bathroom renovation. new electrical service.Details
kitchen & (1) bathroom renovation. new electrical service. | $23,000 |
| Sep 23, 2015 | Completed final sign-off Mar 2016 | 459 Greenwich St | R. C. Construction | revision to 201504224301. change to grade beam.Details
revision to 201504224301. change to grade beam. | |
| Aug 21, 2015 | Completed final sign-off Dec 2015 | 1039 Broadway | R. C. Construction | revision to 201507070779; moved bathroom wall.Details
revision to 201507070779; moved bathroom wall. | $2,000 |
| Jul 7, 2015 | Completed final sign-off Dec 2015 | 1039 Broadway | R. C. Construction | kitchen and bathroom remodel. relocate water heater. no wall or structural work.Details
kitchen and bathroom remodel. relocate water heater. no wall or structural work. | $15,000 |
| Jun 12, 2015 | Completed final sign-off Jan 2018 | 1126 Sanchez St | R. C. Construction | revision to 201506027838; relocate unit #1 to 1st flr, expand unit #4 into 2nd level, infill lightwell at 2n/3rd flrs (not visible),reconfigure (e) 1st flr fire sprinklers & add new at (e)entry/exit hall- under separate permit.Details
revision to 201506027838; relocate unit #1 to 1st flr, expand unit #4 into 2nd level, infill lightwell at 2n/3rd flrs (not visible),reconfigure (e) 1st flr fire sprinklers & add new at (e)entry/exit hall- under separate permit. | $115,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 1000 North Point St | Cy Lo Builder, R. C. Construction | new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches.Details
new countertops, sinks, faucets, reinstall pre-existing wall (2 bathrooms and kitchen) all new light fixtures and switches. | $20,000 |
| Jun 2, 2015 | Completed final sign-off Mar 2018 | 1126 Sanchez St | R. C. Construction | renovate unit #4 kitchen, living and bedroom per plan. relocate (e) bath and add new bath at unit 1. replace/reconfigure windows/doors at rear and side. new skylights at unit 4 per plan. no work at front units (2 & 3).Details
renovate unit #4 kitchen, living and bedroom per plan. relocate (e) bath and add new bath at unit 1. replace/reconfigure windows/doors at rear and side. new skylights at unit 4 per plan. no work at front units (2 & 3). | $140,000 |
| Apr 28, 2015 | Completed final sign-off Oct 2015 | 1050 North Point St | R. C. Construction | kitchen and bathroom remodel - existing fan and hood to remain, new can lights in bathroom and kitchen all new led lightDetails
kitchen and bathroom remodel - existing fan and hood to remain, new can lights in bathroom and kitchen all new led light | $25,000 |
| Apr 22, 2015 | Completed final sign-off Mar 2016 | 459 Greenwich St | R. C. Construction | soft storey retrofit ordinance, chapter 34bDetails
soft storey retrofit ordinance, chapter 34b | $10,000 |
| Apr 14, 2015 | Completed final sign-off Apr 2015 | 117 Bartlett St | R. C. Construction | comply with complaints #201532971 & #201534461. repairs stairs, repair window sash frame, install smoke detectors and carbon alarm, strap water heaters, repairs in plaster. stair repair not to exceeed 50%Details
comply with complaints #201532971 & #201534461. repairs stairs, repair window sash frame, install smoke detectors and carbon alarm, strap water heaters, repairs in plaster. stair repair not to exceeed 50% | $3,000 |
| Mar 19, 2015 | Completed final sign-off Apr 2015 | 225 Ashton Av | R. C. Construction | voluntary structural strengthening in accordance sfbc ab-108 (cebc appendix a3).Details
voluntary structural strengthening in accordance sfbc ab-108 (cebc appendix a3). | $3,000 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 1632 Alabama St | R. C. Construction | redo back steps to match (e), replace concrete slab, build french drain with catch basin. repair rear steps in kind not to exceed 50%. call district inspector prior to start of work.Details
redo back steps to match (e), replace concrete slab, build french drain with catch basin. repair rear steps in kind not to exceed 50%. call district inspector prior to start of work. | $5,000 |
| Jan 7, 2015 | Completed final sign-off May 2015 | 944 Vallejo St | R. C. Construction | (rear bldg) pull up existing trex decking replace all waterproofing on concrete storage (deck 1 & 2).Details
(rear bldg) pull up existing trex decking replace all waterproofing on concrete storage (deck 1 & 2). | $8,000 |
| Dec 5, 2014 | Completed final sign-off Mar 2015 | 65 Ora Wy | R. C. Construction | kitchen remodel, all fixtures remain at same location. no alteration of wall, window, door.Details
kitchen remodel, all fixtures remain at same location. no alteration of wall, window, door. | $50,000 |
| Aug 25, 2014 | Completed final sign-off Sep 2014 | 3660 17th St | R. C. Construction | revision of address from 3658 17th street per application # 201408123659 to correct address to 3660 17th street.Details
revision of address from 3658 17th street per application # 201408123659 to correct address to 3660 17th street. | |
| Aug 12, 2014 | Completed final sign-off Sep 2014 | 3658 17th St | R. C. Construction | replaced water damaged sheet rock at ceiling in one unit.Details
replaced water damaged sheet rock at ceiling in one unit. | $3,500 |
| Jan 17, 2014 | Completed final sign-off Jul 2014 | 1535 Leavenworth St | R. C. Construction | to comply with nov 201319702, item # 3 repair stairwell, less than 50%, stairwell located on side of building not visable to street. replace same and kindDetails
to comply with nov 201319702, item # 3 repair stairwell, less than 50%, stairwell located on side of building not visable to street. replace same and kind | $3,500 |
| Dec 24, 2013 | Completed final sign-off Apr 2014 | 1856 Green St | R. C. Construction | unit #4: 2 bathroom remodels, currently 4 light fixtures in each bathroom and 3 plumbing fixtures in each bathroom to stay in placeDetails
unit #4: 2 bathroom remodels, currently 4 light fixtures in each bathroom and 3 plumbing fixtures in each bathroom to stay in place | $20,000 |
| Aug 16, 2013 | Never finaled filed Aug 2013, never issued | 98 Estero Av | R. C. Construction | 15 windows to be replaced size for size, back and side. u factor is 0.40 maxDetails
15 windows to be replaced size for size, back and side. u factor is 0.40 max | |
| Aug 16, 2013 | Completed final sign-off Oct 2013 | 98 Estero Av | R. C. Construction | 15 windows to be replaced size for size, back and side. u factor is 0.40 maxDetails
15 windows to be replaced size for size, back and side. u factor is 0.40 max | $5,000 |
| May 28, 2013 | Completed final sign-off Feb 2014 | 1830 Lyon St | R. C. Construction | kitchen remodel. all remain at same location. replacing cabinets, countertop, and kitchen appliances only.Details
kitchen remodel. all remain at same location. replacing cabinets, countertop, and kitchen appliances only. | $35,000 |
| Apr 16, 2013 | Completed final sign-off May 2013 | 670 41st Av | R. C. Construction | dry rot repair with siding at light well. approximately 32ftDetails
dry rot repair with siding at light well. approximately 32ft | $1,500 |
| Mar 14, 2013 | Completed final sign-off Jun 2013 | 1856 Green St | R. C. Construction | kitchen & bathroom remodel all fixtures & cabinets remainDetails
kitchen & bathroom remodel all fixtures & cabinets remain | $30,000 |
| Mar 5, 2013 | Completed final sign-off Jan 2014 | 1050 North Point St | R. C. Construction | kitchen cabinets, counter top & appliances, plmbg fixtures replacement, all fixtures remains at same location, bathrm: replacement of floor tile, wall tile around bath tub, toilet, tub/shower valve & vanity cabinet,all fixtures remain aat same locationDetails
kitchen cabinets, counter top & appliances, plmbg fixtures replacement, all fixtures remains at same location, bathrm: replacement of floor tile, wall tile around bath tub, toilet, tub/shower valve & vanity cabinet,all fixtures remain aat same location | $30,000 |
| Sep 24, 2012 | Completed final sign-off Nov 2012 | 95 Rudden Av | R. C. Construction | 22 window replacement(size for size). paintable fiberglass at windows that are visible from the street and vinyl windows at rear. u-factor 0.4 maxDetails
22 window replacement(size for size). paintable fiberglass at windows that are visible from the street and vinyl windows at rear. u-factor 0.4 max | $5,000 |
| Aug 16, 2012 | Expired or cancelled withdrawn Oct 2013 | 1251 24th Av | R. C. Construction | repair a deckDetails
repair a deck | $5,000 |
| Mar 22, 2012 | Completed final sign-off Apr 2012 | 5945 03rd St | R. C. Construction | revision to pa# 2012-0309-5756-upgrade (e) ground floor restroom to accessible restroom, upgrade (e) stair guardrails, add 90 minute rated door. relocate (e) entry gate/doorDetails
revision to pa# 2012-0309-5756-upgrade (e) ground floor restroom to accessible restroom, upgrade (e) stair guardrails, add 90 minute rated door. relocate (e) entry gate/door | $19,800 |
| Mar 9, 2012 | Completed final sign-off Apr 2012 | 5945 03rd St | R. C. Construction | #c: change of use: existing office space in "s-2" occupancy change to "b" occupancy and partial s-2Details
#c: change of use: existing office space in "s-2" occupancy change to "b" occupancy and partial s-2 | |
| Sep 29, 2011 | Completed final sign-off Nov 2011 | 1037 Broadway | R. C. Construction | fixing 50% of an extg deck. repair in kind in backDetails
fixing 50% of an extg deck. repair in kind in back | $6,500 |