Gary Varum
- Listed as
- architect, attorney, engineer
- Firm
- Telesis Engineers
- Based in
- Berkeley
- On San Francisco permits
- Feb 2006 to Dec 2024
89 permits since 2000 (engineer on 86 permits, architect on 2 permits, attorney on 1 permit): 57 completed, 29 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2024 | Completed final sign-off May 2025 | 565 Page St | Manzyuk Enterprises Inc | unit 6: remodel of kitchen & 1 bathroom. construct 1 new full bathroom. replace e) windows w/ double glazed vinyl window in kind. all windows at rearDetails
unit 6: remodel of kitchen & 1 bathroom. construct 1 new full bathroom. replace e) windows w/ double glazed vinyl window in kind. all windows at rear | $47,500 |
| Sep 13, 2021 | Expired or cancelled withdrawn Apr 2022 | 1664 Fell St | construct two adus in the rear area of the1 st floor currently used for storage.remove 4 brick chimneys and fireplaces.relocation of kitchen,remodel of bathroom,constrcution of new bathroom (units 1664,1666,1668), enclosure of portion rear stair(1664 2nd fl & 1666 3rd fl).reconstruct rear stairs.Details
construct two adus in the rear area of the1 st floor currently used for storage.remove 4 brick chimneys and fireplaces.relocation of kitchen,remodel of bathroom,constrcution of new bathroom (units 1664,1666,1668), enclosure of portion rear stair(1664 2nd fl & 1666 3rd fl).reconstruct rear stairs. | $170,000 | |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 50 Chumasero Dr | Surber Construction | voluntary upgrade of basement non bearing partition walls.Details
voluntary upgrade of basement non bearing partition walls. | $15,000 |
| Apr 26, 2012 | Completed final sign-off Jul 2012 | 405 Serrano Dr | Surber Construction | voluntary upgrade of basement non bearing partition walls.Details
voluntary upgrade of basement non bearing partition walls. | $15,000 |
| Jun 23, 2009 | Completed final sign-off May 2010 | 875 Howard St | Plant Construction Company Lp | remove existing escalator between 5 and 6th floor levels and infill floor slab openings (escalator previously abandoned) existing building is vacant all levels - ada per ab.17. no exterior modifications/no increase in office space.Details
remove existing escalator between 5 and 6th floor levels and infill floor slab openings (escalator previously abandoned) existing building is vacant all levels - ada per ab.17. no exterior modifications/no increase in office space. | $24,500 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 16 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.12 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.12 for scope of work. | $14,150 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 117 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 320 Garces Dr | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 423 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.10 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.10 for scope of work. | $11,270 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 314 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 114 Crespi Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 23 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.12 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.12 for scope of work. | $14,150 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 112 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 318 Garces Dr | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $20,500 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 112 Cambon Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 15 Diaz Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 16 Fuente Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 16 Josepha Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 114 Garces Dr | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 112 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 425 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.10 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.10 for scope of work. | $11,270 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 9 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $12,450 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 16 Diaz Av | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $13,350 | |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 18 Higuera Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $20,500 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 18 Josepha Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 114 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 823 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 414 Vidal Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.7 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.7 for scope of work. | $10,560 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 15 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $11,390 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 214 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 115 Crespi Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 121 Tapia Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Mar 2009 | 17 Josepha Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Mar 2009 | 117 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $13,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 17 Rivas Av | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 216 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 117 Crespi Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 114 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 517 Vidal Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.8 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.8 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 114 Cambon Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $16,875 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 14 Diaz Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Mar 2011 | 17 Fuente Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 519 Vidal Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.8 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.8 for scope of work. | $12,350 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 419 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $11,390 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 223 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.3 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.3 for scope of work. | $19,950 |
| Nov 16, 2006 | Completed final sign-off Jun 2009 | 312 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 420 Serrano Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 315 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 15 Rivas Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 433 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $11,550 |
| Nov 16, 2006 | Completed final sign-off Mar 2009 | 225 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.3 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.3 for scope of work. | $18,740 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 515 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Feb 2008 | 23 Acevedo Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 19 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 319 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.8 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.8 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 518 Vidal Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.6 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.6 for scope of work. | $12,940 |
| Nov 16, 2006 | Completed final sign-off Mar 2009 | 235 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.6 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.6 for scope of work. | $17,890 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 15 Fuente Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 23 Pinto Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 821 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $20,500 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 435 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $11,550 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 107 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.1 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.1 for scope of work. | $18,700 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 517 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 21 Acevedo Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $20,500 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 115 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 416 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 20 Higuera Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $12,350 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 17 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $17,950 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 317 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.8 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.8 for scope of work. | $12,350 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 516 Vidal Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.6 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.6 for scope of work. | $12,940 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 219 Garces Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.6 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.6 for scope of work. | $17,890 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 14 Fuente Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 123 Tapia Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 21 Pinto Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.9 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.9 for scope of work. | $20,500 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 25 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.12 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.12 for scope of work. | $14,150 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 112 Garces Dr | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 | |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 22 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.13 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.13 for scope of work. | $15,150 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 417 Gonzalez Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.4 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.4 for scope of work. | $14,400 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 17 Diaz Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 418 Serrano Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2 for scope of work. | $20,500 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 19 Josepha Av | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Mar 2008 | 14 Grijalva Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.12 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.12 for scope of work. | $14,150 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 115 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 24 Bucareli Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.13 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.13 for scope of work. | $15,150 |
| Nov 16, 2006 | Completed final sign-off Sep 2007 | 414 Font Bl | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Nov 16, 2006 | Never finaled issued Feb 2007, no final | 112 Crespi Dr | Northern Sun Associates | voluntary seismic upgrade refer to sheet s2.2 for scope of work.Details
voluntary seismic upgrade refer to sheet s2.2 for scope of work. | $12,250 |
| Oct 6, 2006 | Never finaled issued Aug 2007, no final | 550 California St | calculations to verify conformance of existing building to sfbc section 1605.4.3 (former section 104f). drawing for original construction copied from files @ dbi. no construction under this permit.Details
calculations to verify conformance of existing building to sfbc section 1605.4.3 (former section 104f). drawing for original construction copied from files @ dbi. no construction under this permit. | ||
| Jul 12, 2006 | Expired or cancelled expired Mar 2009 | 635 Sacramento St | Fine Line Group Inc | demolition of existing building entrance and construct a new entrance, including vetrical lift at 635 sacramento st. for ada handicap accesability access to bldg.Details
demolition of existing building entrance and construct a new entrance, including vetrical lift at 635 sacramento st. for ada handicap accesability access to bldg. | $40,000 |
| Feb 17, 2006 | Expired or cancelled expired Mar 2007 | 635 Sacramento St | Webcor Construction Lp | revision to appl#200405123680 "work description"only to states as follows: seismic upgrade to section 1605.4.3 of sfbc 2002 edition,install conc. shear wall & steel braces.Details
revision to appl#200405123680 "work description"only to states as follows: seismic upgrade to section 1605.4.3 of sfbc 2002 edition,install conc. shear wall & steel braces. |