Douglas Fong
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Design & Build
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Aug 2023
30 permits since 2000 (architect on 27 permits, authorized agent-others on 2 permits, engineer on 1 permit): 16 completed, 6 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2023 | Completed final sign-off May 2024 | 345 California St | Peacock Construction | interior alteration of 488 sqft office space no mech, no lightng no structural no plumbing 18th fl.Details
interior alteration of 488 sqft office space no mech, no lightng no structural no plumbing 18th fl. | $50,000 |
| Dec 10, 2020 | Completed final sign-off Jun 2023 | 251 Dorantes Av | R R A Construction Inc | replace (e) wood-framed exterior front porch w/ (n) concrete porch. remove side yard exterior stair.Details
replace (e) wood-framed exterior front porch w/ (n) concrete porch. remove side yard exterior stair. | $25,000 |
| Sep 16, 2020 | Never finaled issued Jun 2021, no final | 1446 42nd Av | revision to pa #2018-1010-2775: make existing rear yard cottage into an adu. work is limited to basement of main building to increase headroom in exitway previously reviewed by plan checker on 2/24/20.Details
revision to pa #2018-1010-2775: make existing rear yard cottage into an adu. work is limited to basement of main building to increase headroom in exitway previously reviewed by plan checker on 2/24/20. | $10,000 | |
| Mar 11, 2019 | Never finaled issued Mar 2021, no final | 620 Precita Av | alteration of single family dwelling at rear of parcel.Details
alteration of single family dwelling at rear of parcel. | $150,000 | |
| Nov 29, 2018 | Completed final sign-off Jan 2020 | 1446 42nd Av | Bay Counties Construction & Maint. | interiorremodel of residential unit. nostructural work. exterior relocation of entry door.Details
interiorremodel of residential unit. nostructural work. exterior relocation of entry door. | $168,000 |
| Oct 10, 2018 | Never finaled issued Dec 2019, no final | 1446 42nd Av | Rra Construction | rear building. renovation of existing rear yard cottage to be an accessory dweling unit per ordinance 95-17Details
rear building. renovation of existing rear yard cottage to be an accessory dweling unit per ordinance 95-17 | $15,000 |
| Sep 24, 2018 | Completed final sign-off Sep 2018 | 620 Precita Av | administrative permit to verify legal use and occupancy of this building as a 2 story single family dwelling. based on site visit and city records (dbi, assesors + water dept (rear building) no workDetails
administrative permit to verify legal use and occupancy of this building as a 2 story single family dwelling. based on site visit and city records (dbi, assesors + water dept (rear building) no work | ||
| Sep 24, 2018 | Completed final sign-off Sep 2018 | 622 Precita Av | administrative permit to verify legal use and occupancy of this building as a 2 unit, residential buildind. based on site visit and city records (dbi, assesors + water dept (front building) no workDetails
administrative permit to verify legal use and occupancy of this building as a 2 unit, residential buildind. based on site visit and city records (dbi, assesors + water dept (front building) no work | ||
| Aug 27, 2018 | Completed final sign-off Jul 2019 | 1446 42nd Av | Rra Construction | new half bathroom & laundry area in existing lower level interior, no exterior work. no structural work.Details
new half bathroom & laundry area in existing lower level interior, no exterior work. no structural work. | $20,000 |
| Nov 22, 2017 | Completed final sign-off Dec 2020 | 851 Greenwich St | R R A Construction Inc | soft story retrofit per sfebc chapter 4d: asce 41-13Details
soft story retrofit per sfebc chapter 4d: asce 41-13 | $30,000 |
| Oct 5, 2017 | Never finaled filed Oct 2017, never issued | 176 Jordan Av | two story rear addition, one story over basement.Details
two story rear addition, one story over basement. | $184,500 | |
| Oct 5, 2017 | Expired or cancelled withdrawn Oct 2019 | 176 Jordan Av | demolition one story deteched garage at rear of buildingDetails
demolition one story deteched garage at rear of building | $10,000 | |
| Jul 7, 2017 | Expired or cancelled withdrawn Mar 2019 | 620 Precita Av | demolish two story single family dwelling.Details
demolish two story single family dwelling. | $20,000 | |
| Jul 7, 2017 | Expired or cancelled withdrawn Mar 2019 | 620 Precita Av | erect a two story type 5 construction single family dwelling.Details
erect a two story type 5 construction single family dwelling. | $286,000 | |
| Jul 17, 2015 | Expired or cancelled cancelled Jan 2026 | 544 Los Palmos Dr | revise pa#201502138392 for deck repair, add architects drawings, repaired more than 50% of decking.Details
revise pa#201502138392 for deck repair, add architects drawings, repaired more than 50% of decking. | ||
| Jul 11, 2012 | Expired or cancelled cancelled Mar 2020 | 2131 Castro St | reconstruct (e) deteriorated upper level exterior deck.Details
reconstruct (e) deteriorated upper level exterior deck. | $10,000 | |
| May 10, 2011 | Completed final sign-off Sep 2012 | 555 09th St | Howard S. Wright Constructors Lp | #83 - add new walk up atm to 9th street & mall concourse storefronts.Details
#83 - add new walk up atm to 9th street & mall concourse storefronts. | $20,000 |
| Dec 6, 2010 | Completed final sign-off Feb 2011 | 1160 Battery St | Bcci Construction Company | 2nd floor-tenant improvement including new walls & finishes. mechanical, electrical, sprinkler & life safety under seperate permitDetails
2nd floor-tenant improvement including new walls & finishes. mechanical, electrical, sprinkler & life safety under seperate permit | $75,000 |
| Aug 13, 2010 | Completed final sign-off Feb 2011 | 791 San Bruno Av | to demolish garage building.Details
to demolish garage building. | $2,000 | |
| Mar 10, 2010 | Completed final sign-off Feb 2011 | 1160 Battery St | Bcci Construction Company | 1st floor - new lighting & furniture layout, no mechanical work.Details
1st floor - new lighting & furniture layout, no mechanical work. | $31,800 |
| Nov 5, 2008 | Expired or cancelled expired Feb 2011 | 791 San Bruno Av | revision to bpa# 2005/0404/9074. modify configuration to entry porch retaining walls and 20th. st. setback grading. all work within public street space.Details
revision to bpa# 2005/0404/9074. modify configuration to entry porch retaining walls and 20th. st. setback grading. all work within public street space. | ||
| Oct 31, 2006 | Completed final sign-off Nov 2006 | 105 Grant Av | renew demo pa# 2005/12/22/0897.Details
renew demo pa# 2005/12/22/0897. | ||
| Oct 12, 2006 | Never finaled issued Oct 2006, no final | 105 Grant Av | Retail Construction Services | revising approved permits 200604038125, 200607146632, 200607318096 to revise guardrail connection detail. structural addendum only. connection detail with special inspection.Details
revising approved permits 200604038125, 200607146632, 200607318096 to revise guardrail connection detail. structural addendum only. connection detail with special inspection. | |
| Jul 31, 2006 | Never finaled issued Sep 2006, no final | 105 Grant Av | Retail Construction Services | revision to 1st, 2nd & 3rd floors of bldg prevously permitted under 200604038125. reference plans attached.Details
revision to 1st, 2nd & 3rd floors of bldg prevously permitted under 200604038125. reference plans attached. | $50,000 |
| Nov 1, 2005 | Expired or cancelled cancelled Feb 2009 | 1274 23rd Av | rear yard addition to basement & 1st floor (architect. new deck space on 2nd floor. rxterior front yard modifications.Details
rear yard addition to basement & 1st floor (architect. new deck space on 2nd floor. rxterior front yard modifications. | $50,000 | |
| Apr 4, 2005 | Completed final sign-off Feb 2011 | 791 San Bruno Av | demolish 1 story, single family dwelling.Details
demolish 1 story, single family dwelling. | ||
| Apr 4, 2005 | Completed final sign-off Feb 2011 | 791 San Bruno Av | erect 3-story, single family dwelling.Details
erect 3-story, single family dwelling. | $6,000,000 | |
| Feb 25, 2005 | Completed final sign-off Jan 2008 | 1214 Palou Av | horizontal two level addition to the rear. grading in rear yard.Details
horizontal two level addition to the rear. grading in rear yard. | $70,000 | |
| Sep 17, 2004 | Completed final sign-off Jan 2005 | 129 Ashton Av | emergency stabilization work to comply with nov#200453690.Details
emergency stabilization work to comply with nov#200453690. | $500 | |
| Sep 27, 2002 | Expired or cancelled expired Jul 2007 | 634 18th Av | Greg Kempton Construction | horizontal addition to make a 2 unit buildingDetails
horizontal addition to make a 2 unit building | $150,000 |