Douglas Deng
- Listed as
- architect, authorized agent-others, engineer
- Firm
- D2 Structural Engineers
- Based in
- Daly City
- On San Francisco permits
- Apr 2014 to Dec 2022
10 permits since 2000 (engineer on 7 permits, architect on 2 permits, authorized agent-others on 1 permit): 7 completed, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 14, 2022 | Never finaled filed Dec 2022, never issued | 2444 San Bruno Av | project is solely for accessibility upgrades per ord 51-16. within an (e) exterior door frame a new accessible door & entrance will be built, with some minor changes to interior walls & moving 4 dryers. a new accessible van parking space will be built within the (e) parking lot. abe #201812283582.Details
project is solely for accessibility upgrades per ord 51-16. within an (e) exterior door frame a new accessible door & entrance will be built, with some minor changes to interior walls & moving 4 dryers. a new accessible van parking space will be built within the (e) parking lot. abe #201812283582. | $507,980 | |
| Sep 20, 2021 | Completed final sign-off Nov 2022 | 1439 Leavenworth St | Apex America Gc Inc | unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units.Details
unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units. | $50,000 |
| Jul 15, 2021 | Completed final sign-off Jan 2023 | 3625 Noriega St | Benkee Construction Co | 1st flr: relocate kitchen & living rm to 1st flr, add half bath on 1st flr. replace extg windows in kind, relocate interior stairs, upgrade electrical main service panel to 200 amp min. 2nd floor: convert (e) kitche/living rm into 2 new bedroom, add 1 full bath, remodel 1 (e) full bath. add skylightDetails
1st flr: relocate kitchen & living rm to 1st flr, add half bath on 1st flr. replace extg windows in kind, relocate interior stairs, upgrade electrical main service panel to 200 amp min. 2nd floor: convert (e) kitche/living rm into 2 new bedroom, add 1 full bath, remodel 1 (e) full bath. add skylight | $50,000 |
| Jan 23, 2020 | Completed final sign-off Jan 2022 | 2774 Mcallister St | John O'donovan | remodel kitchen and bath on 1st fl remodel 1 bath at basement floor. voluntary seismic retrofit at basement floor with plywood shear walls. replace windows. legalize rooms at basement levelDetails
remodel kitchen and bath on 1st fl remodel 1 bath at basement floor. voluntary seismic retrofit at basement floor with plywood shear walls. replace windows. legalize rooms at basement level | $20,000 |
| Feb 28, 2019 | Never finaled issued Sep 2019, no final | 987 Dolores St | revision to 201303202087. revise stair enclosure framing. revise guard rail & glass wood screen detail. add new skylightsDetails
revision to 201303202087. revise stair enclosure framing. revise guard rail & glass wood screen detail. add new skylights | $10,000 | |
| Aug 23, 2018 | Completed final sign-off May 2019 | 239 25th Av | M L S Builder Inc. | ref#201609087095. change/update engineer of record only, for soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. no changes to structural design. same work as pa #201609087095.Details
ref#201609087095. change/update engineer of record only, for soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. no changes to structural design. same work as pa #201609087095. | |
| Nov 3, 2016 | Completed final sign-off Mar 2017 | 309 San Marcos Av | Greatwall Building Construction Inc | voluntary seismic upgrade of bld conforming to iecb a3 brace & bolt reqs. shear panels being added to (e) stud wall at cripple walls.Details
voluntary seismic upgrade of bld conforming to iecb a3 brace & bolt reqs. shear panels being added to (e) stud wall at cripple walls. | $6,000 |
| Feb 8, 2016 | Completed final sign-off Jan 2017 | 2530 Chestnut St | Lindsey Ericksen General Contractor | perform seismic retrofit @ ground floor by installing 2 new steel moment frames, 1 @ garage opening & 1 @ interior. ** maher: n/a **Details
perform seismic retrofit @ ground floor by installing 2 new steel moment frames, 1 @ garage opening & 1 @ interior. ** maher: n/a ** | $30,000 |
| Mar 24, 2015 | Completed final sign-off May 2017 | 3064 Sacramento St | Tony Construction Inc, Greatwall Building Construction Inc | unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchenDetails
unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchen | $150,000 |
| Apr 3, 2014 | Expired or cancelled withdrawn Apr 2014 | 31 28th St | install shear wall and foundtion at front of building. to repair soft story condition. compy sfbc 34b soft storyDetails
install shear wall and foundtion at front of building. to repair soft story condition. compy sfbc 34b soft story | $15,000 |