Derrick Roorda
- Listed as
- architect, designer, engineer
- Firm
- Derrick D. Roorda
- Based in
- Alameda
- On San Francisco permits
- Mar 2005 to Jan 2024
29 permits since 2000 (engineer on 28 permits, architect on 1 permit, designer on 1 permit): 21 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 11, 2024 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | Belvoir Construction Inc. | revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location.Details
revise permit# 202208251289: to include kitchen remodel at 2nd floor and remodel bath to remove shower to become powder room. revise plan at 3rd floor bath, closets and bedroom. revise sheawall location. | $60,000 |
| Sep 13, 2022 | Completed final sign-off Nov 2022 | 1465 06th Av | Belvoir Construction Inc. | rev to pa# 2022-0415-2357: remove post at basement, reinfore (e) beam and add footing under post, revisions to deck framingDetails
rev to pa# 2022-0415-2357: remove post at basement, reinfore (e) beam and add footing under post, revisions to deck framing | $2,500 |
| Aug 25, 2022 | Expired or cancelled expired Feb 2026 | 1612 Vallejo St | Christopher Gate Construction Inc | remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor.Details
remodel (e) 2 bathrooms and rconfigure closets at 3/f. install shear wall & posts per structural drawnings. enclose laundry @ ground floor. | $35,000 |
| Mar 15, 2022 | Completed final sign-off Jul 2024 | 105 08th Av | Paul K Vou | remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level.Details
remodel unit 105 to connect to 1st story. convert storage & garage space into 2 bedroom & 2 baths. remodel 2nd story kitchen & bath. add stair to connect to lower level. | $150,000 |
| Mar 29, 2021 | Completed final sign-off Jul 2022 | 350 Bush St | Skyline Construction | floors 2-3: selective demo or removal of (e) non load bearing partitions, interior finishes and light fixtures, and the construction or installation of new non load bearing partitions, doors and frames, light fixtures and finishees on 2nd fl. replace a single storage door with double door on 3rd fl.Details
floors 2-3: selective demo or removal of (e) non load bearing partitions, interior finishes and light fixtures, and the construction or installation of new non load bearing partitions, doors and frames, light fixtures and finishees on 2nd fl. replace a single storage door with double door on 3rd fl. | $120,000 |
| Oct 16, 2019 | Completed final sign-off Nov 2020 | 465 Pine St | Principal Builders Inc. | 15th fl - ti of warm shell to construct new partitions, doors, ceilings, millwork, glazing, finishes and mep systems. fire alarms & sprinklers under separate permitDetails
15th fl - ti of warm shell to construct new partitions, doors, ceilings, millwork, glazing, finishes and mep systems. fire alarms & sprinklers under separate permit | $2,287,530 |
| Sep 5, 2018 | Completed final sign-off Jan 2019 | 506 Banks St | rev to pa201807124386: structural plans to show ceiling framing is new.Details
rev to pa201807124386: structural plans to show ceiling framing is new. | ||
| Mar 23, 2017 | Completed final sign-off Mar 2018 | 722 31st Av | Mcmahon Construction | reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight.Details
reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight. | $91,000 |
| Oct 16, 2015 | Completed final sign-off Sep 2016 | 80 Merced Av | Oak Leaf Construction | remodel attic to create additional living area. add (n) internal stair to attice from 2nd flr. reconfigure 2nd flr master bathroom, create powder room. new windows @ attic north & south facade, new skylights.Details
remodel attic to create additional living area. add (n) internal stair to attice from 2nd flr. reconfigure 2nd flr master bathroom, create powder room. new windows @ attic north & south facade, new skylights. | $95,000 |
| Jul 22, 2015 | Completed final sign-off Dec 2015 | 690 Long Bridge St | revision to appl #2012.0705.4130-s2: structural concrete did not reflect the use of shotcrete. n/a maher ordinanceDetails
revision to appl #2012.0705.4130-s2: structural concrete did not reflect the use of shotcrete. n/a maher ordinance | $250,000 | |
| Apr 22, 2015 | Completed final sign-off Mar 2016 | 459 Greenwich St | R. C. Construction | soft storey retrofit ordinance, chapter 34bDetails
soft storey retrofit ordinance, chapter 34b | $10,000 |
| Dec 17, 2013 | Expired or cancelled withdrawn Feb 2020 | 412 Lombard St | Forsythe General Contractors | revision #2 to pa 2008-11-07-6053. revise south facade: change shape/location of bay window. reduce clacing bit gl 2+3. expand entry vestibule. change rainscreen finish to dark stained cedar.Details
revision #2 to pa 2008-11-07-6053. revise south facade: change shape/location of bay window. reduce clacing bit gl 2+3. expand entry vestibule. change rainscreen finish to dark stained cedar. | |
| Sep 20, 2013 | Completed final sign-off Jul 2015 | 1432 Grove St | Kieran O'carroll Construction | replace (e) brick foundation with new concrete foundationDetails
replace (e) brick foundation with new concrete foundation | $110,000 |
| Aug 30, 2013 | Completed final sign-off Jul 2015 | 1432 Grove St | Kieran O'carroll Construction | soft demolition at vacant building, remove plaster & lathat interior partitions. remove cabinetry 7& fixtures. no change to bearing wall framing. future work under separate permit, include seimic strengthening.Details
soft demolition at vacant building, remove plaster & lathat interior partitions. remove cabinetry 7& fixtures. no change to bearing wall framing. future work under separate permit, include seimic strengthening. | $20,000 |
| Nov 26, 2012 | Completed final sign-off Dec 2015 | 690 Long Bridge St | indicator piles for approved site permit pa #2012.0705.4130s (pending issuance)Details
indicator piles for approved site permit pa #2012.0705.4130s (pending issuance) | ||
| Aug 31, 2012 | Completed final sign-off Jul 2013 | 394 Eureka St | Pegasus Building/Castle Construction | interior remodel of 394 eureka: upper level dwelling unit. add spiral stair to roof. new roof deck. fire sprinkler system under separate permit.Details
interior remodel of 394 eureka: upper level dwelling unit. add spiral stair to roof. new roof deck. fire sprinkler system under separate permit. | $70,000 |
| Feb 24, 2011 | Completed final sign-off Sep 2011 | 829 Castro St | remodel lower level unit #829. relocate kitchen and (e) bathroom. add two bathrooms, master bedroom and living room at lower levelDetails
remodel lower level unit #829. relocate kitchen and (e) bathroom. add two bathrooms, master bedroom and living room at lower level | $95,000 | |
| Feb 22, 2011 | Completed final sign-off Aug 2016 | 412 Lombard St | Forsythe General Contractors | to revise the description of pa# 2008/11/07/6053 as follows: this is a "stand alone" permit that does not revise pa# 2003/04/24/3061 (a cancelled permit). the scope of work of pa# 2008/11/07/6053 is the following: this is an (e) 1 story, type 5b, single family house over an underground garage, withDetails
to revise the description of pa# 2008/11/07/6053 as follows: this is a "stand alone" permit that does not revise pa# 2003/04/24/3061 (a cancelled permit). the scope of work of pa# 2008/11/07/6053 is the following: this is an (e) 1 story, type 5b, single family house over an underground garage, with | |
| Oct 22, 2007 | Completed final sign-off May 2008 | 60 Pearl St | Basic Modular Facilities Inc | chemical grouting under ex. north footing. revise details from pa# 2005/08/17/0549 to keep ex. footing and pour in front as part of staged foundation upgrade.Details
chemical grouting under ex. north footing. revise details from pa# 2005/08/17/0549 to keep ex. footing and pour in front as part of staged foundation upgrade. | $5,000 |
| Oct 22, 2007 | Completed final sign-off May 2008 | 54 Pearl St | Basic Modular Facilities Inc | chemical grouting for approximately 30' along property line due to work at 62 pearl st. ref. ap# 2005/08/17/0549.Details
chemical grouting for approximately 30' along property line due to work at 62 pearl st. ref. ap# 2005/08/17/0549. | $5,000 |
| Oct 22, 2007 | Never finaled issued Oct 2007, no final | 3799 Washington St | Van Acker Const Assoc Inc | revise previously approved appl #200708230646, voluntary seismic upgrade to one story umb grade to now include reframing roof & adding strongbacks.Details
revise previously approved appl #200708230646, voluntary seismic upgrade to one story umb grade to now include reframing roof & adding strongbacks. | $20,000 |
| Apr 12, 2007 | Completed final sign-off May 2007 | 747 Market St | Plant Construction Company Lp | 2nd floor-revisions to approved pa# 200604179169 per field conditions and deletion of details with high strength bolting.Details
2nd floor-revisions to approved pa# 200604179169 per field conditions and deletion of details with high strength bolting. | |
| Mar 13, 2007 | Never finaled issued Mar 2008, no final | 3434 Scott St | seismic upgrade. renovate/remodel existing third floor. add new fourth floor conditioned area w/attendant terrace. add new stair penthouse w/attendant terrance.Details
seismic upgrade. renovate/remodel existing third floor. add new fourth floor conditioned area w/attendant terrace. add new stair penthouse w/attendant terrance. | $250,000 | |
| Mar 7, 2007 | Completed final sign-off Dec 2007 | 760 Dolores St | Sivestrini Construction | remodel to (e) dining room, kitchen & bath on 1/f of unit #1, demo (e) bath and relocate as 1/2 bath, move (e) kitchen/dining room wall to enlarge (e) dining room. install new windows, french doors & sliding doors, reconfigure & move exterior decking to new door locations. remove (e) basement door.Details
remodel to (e) dining room, kitchen & bath on 1/f of unit #1, demo (e) bath and relocate as 1/2 bath, move (e) kitchen/dining room wall to enlarge (e) dining room. install new windows, french doors & sliding doors, reconfigure & move exterior decking to new door locations. remove (e) basement door. | $180,000 |
| Nov 10, 2006 | Completed final sign-off Jun 2007 | 562 Waller St | Kecskemeti Remodeling | replace section of rear east property line, footing & 2 interior post supports. replace in kind. no change to existing foot print.Details
replace section of rear east property line, footing & 2 interior post supports. replace in kind. no change to existing foot print. | $25,000 |
| Sep 1, 2006 | Never finaled issued Sep 2006, no final | 2046 10th Av | voluntary strenthening at garage level & sub-basement. new plywood shearwalls, new moment frame @ garage door, new bolting.Details
voluntary strenthening at garage level & sub-basement. new plywood shearwalls, new moment frame @ garage door, new bolting. | $23,000 | |
| May 2, 2006 | Never finaled issued Mar 2007, no final | 667 41st Av | Module Construction Inc. | res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storagDetails
res' alterations & addition, level 1: demo extg illegal res' unit demo&replace selected foundations&slabs,add new foundation, slabs& structural frames.build new hall, bath utility &recreation room. level 2: remove extg rear bedroom, build new bedroom,deck, spiral stair & master br ext.remove storag | $180,000 |
| Apr 17, 2006 | Completed final sign-off May 2007 | 747 Market St | new slab opening on 3rd floor for future stair. slab demo only. (approx 16'x17')Details
new slab opening on 3rd floor for future stair. slab demo only. (approx 16'x17') | $12,000 | |
| Mar 18, 2005 | Never finaled issued Jul 2005, no final | 1936 Bush St | new foundations & frame @garage level & excavation to provide a 4 car garage,new laundry,storage rm,Details
new foundations & frame @garage level & excavation to provide a 4 car garage,new laundry,storage rm, | $50,000 |