6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 3 completed, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2016 | Never finaled issued Nov 2016, no final | 360 Post St | Accurate Contracting Inc.Dba Unispace Co | 3/f- new furniture, new paint, make 2 (e) office smaller, new finishes in lobby.Details
3/f- new furniture, new paint, make 2 (e) office smaller, new finishes in lobby. | $70,000 |
| May 18, 2015 | Completed final sign-off Nov 2015 | 201 California St | Turner Construction Co | minor alteration to 10th floor men accessible restroom stall to apply for technical infesible request per ref. pa# 201503181201. n/a ordinance #155-13Details
minor alteration to 10th floor men accessible restroom stall to apply for technical infesible request per ref. pa# 201503181201. n/a ordinance #155-13 | |
| Apr 28, 2015 | Expired or cancelled cancelled Mar 2018 | 832 Folsom St | Accurate Contracting Inc.Dba Unispace Co | 8th floor - vacant suite preperation including demolition of existing offices, suspended ceiling, floor finishes w/minor wall finishes & demolition of non-bearing walls per sfab-017. n/a maher ordinanceDetails
8th floor - vacant suite preperation including demolition of existing offices, suspended ceiling, floor finishes w/minor wall finishes & demolition of non-bearing walls per sfab-017. n/a maher ordinance | $100,000 |
| Mar 18, 2015 | Completed final sign-off Oct 2015 | 201 California St | Turner Construction Co | flrs: 10/11, 11 flr demo under 201502178438; partial remodel of 0th & 11th flrs (e) wall, ceiling, lighting elec & finishes. (n) non load bearing walls, doors ceiling etc.meps /ls & sprinklers under separate permit if needed (bldg fully sprinklered); maher n/aDetails
flrs: 10/11, 11 flr demo under 201502178438; partial remodel of 0th & 11th flrs (e) wall, ceiling, lighting elec & finishes. (n) non load bearing walls, doors ceiling etc.meps /ls & sprinklers under separate permit if needed (bldg fully sprinklered); maher n/a | $890,000 |
| Dec 13, 2013 | Completed final sign-off Mar 2015 | 720 Market St | Accurate Contracting Inc.Dba Unispace Co | suite#1000-10th fl. demolition of interior non load bearing walls & some ceiling grid, construction of new non load bearing partitions, new ceiling, new electrical (under seperate permit) and new finishes. fire sprinklers, fire alarm and mechanical changes under separate applications.Details
suite#1000-10th fl. demolition of interior non load bearing walls & some ceiling grid, construction of new non load bearing partitions, new ceiling, new electrical (under seperate permit) and new finishes. fire sprinklers, fire alarm and mechanical changes under separate applications. | $92,679 |
| Mar 12, 2010 | Expired or cancelled expired Feb 2013 | 3580 21st St | Jongejan/Schaadt Construction | replace property line wall (stepped with stairs) between 2ft. to 4ft., approx. 53ft.Details
replace property line wall (stepped with stairs) between 2ft. to 4ft., approx. 53ft. | $8,000 |