Darrel Harris
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Hcg Associates, Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2005 to Feb 2026
72 permits since 2000 (engineer on 63 permits, architect on 6 permits, authorized agent-others on 3 permits): 59 completed, 3 in progress, 6 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2026 | In progress issued Jun 2026 | 2670 17th Av | revision to p/a# 2025-1118-9836 to install an on-site subdrain system as the method of preventing hydrostatic pressure behind the previously approved retaining wall.Details
revision to p/a# 2025-1118-9836 to install an on-site subdrain system as the method of preventing hydrostatic pressure behind the previously approved retaining wall. | ||
| Nov 18, 2025 | Completed final sign-off Aug 2026 | 2670 17th Av | Hcg Associates Inc | repair the rear retaining wall for violation notice 202545256. ref pa 202512262633Details
repair the rear retaining wall for violation notice 202545256. ref pa 202512262633 | $10,000 |
| Dec 16, 2024 | Completed final sign-off Jan 2025 | 3337 Clay St | Mcguinness Mccann Group | adminstrative review permit for deletion of jomy ladder and footing that was previously not approved but was left on the plans. pa#: 202310118446Details
adminstrative review permit for deletion of jomy ladder and footing that was previously not approved but was left on the plans. pa#: 202310118446 | |
| Jun 11, 2024 | Completed final sign-off Dec 2024 | 363 Flood Av | 7x7 Construction | revise rear concrete stairs due to existing condition & feasibility revision to pa 202210114042Details
revise rear concrete stairs due to existing condition & feasibility revision to pa 202210114042 | $5,000 |
| Jan 16, 2024 | In progress issued Mar 2026 | 525 29th St | new metal circular stairway from deck @ rear of builindg to backyard grade for rear egress emergency and safety purposesDetails
new metal circular stairway from deck @ rear of builindg to backyard grade for rear egress emergency and safety purposes | $20,000 | |
| Jan 10, 2024 | Completed final sign-off Apr 2026 | 1640 Florida St | Hcg Associates Inc | voluntary seismic strengthening of ground floor by adding new plywood shearwall and foundation elements; new wood braces to rear stairway; no lowering of 1st floor elevation.Details
voluntary seismic strengthening of ground floor by adding new plywood shearwall and foundation elements; new wood braces to rear stairway; no lowering of 1st floor elevation. | $50,000 |
| Oct 30, 2023 | Completed final sign-off May 2025 | 1977 Bush St | Mcguinness Mccann Group | remove (e) rear stairs, walls and windows. replace in kind. repair dry rot. no work to front facadeDetails
remove (e) rear stairs, walls and windows. replace in kind. repair dry rot. no work to front facade | $25,000 |
| Oct 11, 2023 | Completed final sign-off Jan 2025 | 3337 Clay St | Mcguinness Mccann Group | 1) remove and replace 4 balconies 2) remove (e) front fire escape and reaplce at east side 3) repair dry rotted material 4) repair and replace affected stucco in kind replacementDetails
1) remove and replace 4 balconies 2) remove (e) front fire escape and reaplce at east side 3) repair dry rotted material 4) repair and replace affected stucco in kind replacement | $20,000 |
| Oct 11, 2023 | In progress filed Oct 2023, not yet issued | 1405 Sutter St | remove and replace rear stairs in kind.Details
remove and replace rear stairs in kind. | $15,000 | |
| Aug 1, 2023 | Completed final sign-off Nov 2024 | 363 Flood Av | temporary shoring during construction under permit 202210114042.Details
temporary shoring during construction under permit 202210114042. | $7,000 | |
| Jul 24, 2023 | Completed final sign-off Sep 2023 | 1901 Larkin St | Hcg Associates Inc | revision to pa 2023-0331-4838 revise accessibility requirement of commercial space to main entrance. no change to building foot print or exterior appearance. minor revision, no da checklist required.Details
revision to pa 2023-0331-4838 revise accessibility requirement of commercial space to main entrance. no change to building foot print or exterior appearance. minor revision, no da checklist required. | |
| Jun 29, 2023 | Completed final sign-off Sep 2023 | 1901 Larkin St | Hcg Associates Inc | revision to pa 2023-0331-4837 reduce holdown requirement to 1 each location; change collector over garage door to 4x blocking & cmst12 strapDetails
revision to pa 2023-0331-4837 reduce holdown requirement to 1 each location; change collector over garage door to 4x blocking & cmst12 strap | $100 |
| Jun 27, 2023 | Expired or cancelled withdrawn Aug 2023 | 39 Mangels Av | to comply w/nov # 202307820, new 6'-0" high x 19'-8" long concrete retaining wall along east side at rear patio.Details
to comply w/nov # 202307820, new 6'-0" high x 19'-8" long concrete retaining wall along east side at rear patio. | $5,000 | |
| Apr 19, 2023 | Expired or cancelled expired Feb 2026 | 253 05th Av | Michael Mc Nulty Construction***Ask Id | revision to pa# 202212138217, replace north side foundation. misc framing revisions. (excavation not exceeding 18")Details
revision to pa# 202212138217, replace north side foundation. misc framing revisions. (excavation not exceeding 18") | |
| Mar 31, 2023 | Completed final sign-off Sep 2023 | 1901 Larkin St | Hcg Associates Inc | revision to pa# 201710060640, commercial portion- structural details and adaDetails
revision to pa# 201710060640, commercial portion- structural details and ada | $5,000 |
| Mar 31, 2023 | Completed final sign-off Sep 2023 | 1901 Larkin St | Hcg Associates Inc | revision to pa# 201710060639, residential portion- structural details and adaDetails
revision to pa# 201710060639, residential portion- structural details and ada | $5,000 |
| Feb 24, 2023 | Completed final sign-off May 2024 | 538 Chenery St | Art Of Construction Inc | replace existing exterior stairs and all the concrete supporting wall. revision to pa# 201902263814Details
replace existing exterior stairs and all the concrete supporting wall. revision to pa# 201902263814 | $12,000 |
| Feb 10, 2023 | Completed final sign-off Apr 2024 | 639 Spruce St | J S Concrete Co | remove/replace (e) foundation in rear storage room & concrete flooringDetails
remove/replace (e) foundation in rear storage room & concrete flooring | $50,000 |
| Oct 27, 2022 | Completed final sign-off Apr 2023 | 2423 Green St | Mcguinness Mccann Group | add concrete foundation to support kitchen floor joists.Details
add concrete foundation to support kitchen floor joists. | $4,000 |
| Oct 12, 2022 | Completed final sign-off Jan 2023 | 150 Portola Dr | Hcg Associates Inc | 1) repair and replace extg rusted steelpipe column. 2)add new wie flange column. no change to bldg footprintDetails
1) repair and replace extg rusted steelpipe column. 2)add new wie flange column. no change to bldg footprint | $8,000 |
| Oct 11, 2022 | Completed final sign-off Dec 2024 | 363 Flood Av | 7x7 Construction | 1st fl excavate earth to 8'10" max. ceiling high. new living space including bedroom, bathroom, laundry, media room. reconstruct interior stairs & front exterior stairs. expand area under (e) wood deck at rear. enlarge garage door to 8' wide. at 2nd fl, (n) lighting & wiring. (n) insulation.Details
1st fl excavate earth to 8'10" max. ceiling high. new living space including bedroom, bathroom, laundry, media room. reconstruct interior stairs & front exterior stairs. expand area under (e) wood deck at rear. enlarge garage door to 8' wide. at 2nd fl, (n) lighting & wiring. (n) insulation. | $150,000 |
| Aug 8, 2022 | Completed final sign-off Feb 2023 | 83 Apollo St | revision to 2021 1223 4965. add concrete grade beam along line 2 @ 1st fl.Details
revision to 2021 1223 4965. add concrete grade beam along line 2 @ 1st fl. | $5,000 | |
| Jul 22, 2022 | Completed final sign-off Mar 2023 | 701 Congo St | Ubr Construction & Roofing Inc, Hcg Associates Inc | enlarge upper deck to fill space to neighbor. add a hot tub.Details
enlarge upper deck to fill space to neighbor. add a hot tub. | $20,000 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 962 Corbett Av | Xspace Builder | remove balcony & door from 3rd floor,east elevation.Details
remove balcony & door from 3rd floor,east elevation. | $5,000 |
| Dec 3, 2021 | Completed final sign-off Jul 2022 | 1465 05th Av | E F Mcginness And Sons | revise permit #202108166504 to add more foundation and framing.Details
revise permit #202108166504 to add more foundation and framing. | $5,000 |
| Nov 19, 2021 | Never finaled issued Sep 2022, no final | 1781 Church St | Hcg Associates Inc, Qse Construction | rev to pa201708185327 & 201708185329 affecting 1793 church st only. add steel framing & foundations.Details
rev to pa201708185327 & 201708185329 affecting 1793 church st only. add steel framing & foundations. | $20,000 |
| Nov 5, 2021 | Completed final sign-off Aug 2022 | 834 Castro St | S Mc Cann Construction Inc | replace front exterior balconies in-kind.Details
replace front exterior balconies in-kind. | $15,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 98 Clarendon Av | E F Mcginness And Sons | new foundation. partialDetails
new foundation. partial | $25,000 |
| Dec 7, 2020 | Never finaled issued May 2021, no final | 2618 Greenwich St | E F Mcginness And Sons | structural repairs and voluntary seismic retrofit.Details
structural repairs and voluntary seismic retrofit. | $80,000 |
| Aug 28, 2020 | Completed final sign-off Jun 2021 | 2242 15th St | Jdesignbuild, E F Mcginness And Sons | remove and replace (e) stair in-kind.Details
remove and replace (e) stair in-kind. | $20,000 |
| Aug 5, 2020 | Completed final sign-off Nov 2021 | 2577 Sacramento St | E F Mcginness And Sons | additional foundations and wood shear walls at ground floor level, this is ref pa# 201911056475Details
additional foundations and wood shear walls at ground floor level, this is ref pa# 201911056475 | $5,000 |
| Aug 5, 2020 | Completed final sign-off Jan 2022 | 518 06th Av | Hcg Associates Inc | remodel 2 units on 1st fl. reference pa 2017-0914-8225 &b 2019-10222-5233 for structural workDetails
remodel 2 units on 1st fl. reference pa 2017-0914-8225 &b 2019-10222-5233 for structural work | $15,000 |
| Aug 5, 2020 | Completed final sign-off Jul 2022 | 409 Clayton St | E F Mcginness And Sons | structural repairs to front porch and stairs.Details
structural repairs to front porch and stairs. | $5,000 |
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 25 Clover St | E F Mcginness And Sons | foundation and framing upgradeDetails
foundation and framing upgrade | $100,000 |
| Jul 3, 2019 | Completed final sign-off Jul 2022 | 1348 Sacramento St | Strong Builders Construction Inc. | seismic retrofit per san francisco ordinance no. 66-13 seismic strengthening of soft-story, wood frame building. no change to building footprint or exterior appearanceDetails
seismic retrofit per san francisco ordinance no. 66-13 seismic strengthening of soft-story, wood frame building. no change to building footprint or exterior appearance | $1,348 |
| Mar 13, 2019 | Completed final sign-off May 2020 | 551 37th Av | Hcg Associates Inc | revision to pa 201611293652, 201707051049 & 201806192260. replace concrete retaining wall along north property line.Details
revision to pa 201611293652, 201707051049 & 201806192260. replace concrete retaining wall along north property line. | |
| Mar 6, 2019 | Completed final sign-off Sep 2019 | 673 Hamilton St | Terry Mc Daniel Construction | 1) relocate laundry wall to create lightwell. 2)replace external sidingDetails
1) relocate laundry wall to create lightwell. 2)replace external siding | $20,000 |
| Feb 7, 2019 | Completed final sign-off Dec 2019 | 557 04th Av | Balla Construction And Design | revision to bpa# 2015-1216-5281. revert passageway ceiling height back to 7'.Details
revision to bpa# 2015-1216-5281. revert passageway ceiling height back to 7'. | |
| Dec 4, 2018 | Expired or cancelled withdrawn Feb 2019 | 1348 Sacramento St | seismic retrofit per sf ordinance 66-13. no change to exterior appearanceDetails
seismic retrofit per sf ordinance 66-13. no change to exterior appearance | $60,000 | |
| Apr 25, 2018 | Never finaled issued Apr 2018, no final | 4900 Fulton St | E F Mcginness And Sons | rmeove exterior siding dry rot. add new plywood shearwalls at repaired walls. add new plywood covered walls at repaired wall. replace 4 existing wood balconies at east exterior wall in kind.Details
rmeove exterior siding dry rot. add new plywood shearwalls at repaired walls. add new plywood covered walls at repaired wall. replace 4 existing wood balconies at east exterior wall in kind. | $8,000 |
| Dec 15, 2017 | Completed final sign-off Jan 2018 | 371 Noe St | Jasafi Construction Inc | revision to pa #201702240047: revise the reinforced structure shearwalls, holdowns. replace 14 windows and relocate 2. replace siding in back, supplement reinforce (e) footing in front left side.Details
revision to pa #201702240047: revise the reinforced structure shearwalls, holdowns. replace 14 windows and relocate 2. replace siding in back, supplement reinforce (e) footing in front left side. | |
| Aug 23, 2017 | Completed final sign-off Nov 2018 | 1845 Mission St | Hcg Associates Inc | seismic retrofit per sfebc chapter 4d; sf ordinance 54-10, "seismic stregthening of soft-story, wood frame buildings." no change to buiding foot print or exterior appearances. 2016 cebc appendix a-4.Details
seismic retrofit per sfebc chapter 4d; sf ordinance 54-10, "seismic stregthening of soft-story, wood frame buildings." no change to buiding foot print or exterior appearances. 2016 cebc appendix a-4. | $80,000 |
| Aug 23, 2017 | Completed final sign-off Mar 2018 | 150 Portola Dr | Hcg Associates Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appenbdix a-4. seismic retrofit per sf ordinance 66-13, "seismic stregthening of soft-story, wood frame buildings." no change to buiding foot print or exterior appearances. 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appenbdix a-4. seismic retrofit per sf ordinance 66-13, "seismic stregthening of soft-story, wood frame buildings." no change to buiding foot print or exterior appearances. 2016 cebc appendix a-4. | $80,000 |
| Aug 8, 2017 | Completed final sign-off Mar 2018 | 1605 12th Av | Balla Construction And Design | repairs to bldg damages caused by vehicaular collision. this is in response to complaint and nov #201792031.Details
repairs to bldg damages caused by vehicaular collision. this is in response to complaint and nov #201792031. | $4,000 |
| Apr 25, 2017 | Completed final sign-off Jun 2017 | 135 Paraiso Pl | Spryscapes Const Inc. | remove and replace front stairs in kindDetails
remove and replace front stairs in kind | $35,000 |
| Nov 23, 2015 | Completed final sign-off May 2019 | 153 Clipper St | Duggan Development | remodel existing residence, in fill portion of existing lightwell, third floor addition with roof deck. 1 new bedroom, 1 new bathroom.Details
remodel existing residence, in fill portion of existing lightwell, third floor addition with roof deck. 1 new bedroom, 1 new bathroom. | $75,000 |
| Oct 28, 2015 | Completed final sign-off May 2016 | 1728 09th Av | Terry Mc Daniel Construction | kitchen remodel open up wall from kitchen to dining room, open wall from kitchen to hallway, master bath remodel, guest bath remodel, structural work in garage to support center beamDetails
kitchen remodel open up wall from kitchen to dining room, open wall from kitchen to hallway, master bath remodel, guest bath remodel, structural work in garage to support center beam | $150,000 |
| Sep 23, 2015 | Completed final sign-off Dec 2017 | 506 Andover St | Bioneer Builders | remove i beam underpinning from foundation 2 and pour concrete in place per plan. to correct nov #201519002Details
remove i beam underpinning from foundation 2 and pour concrete in place per plan. to correct nov #201519002 | $1,200 |
| Jun 22, 2015 | Completed final sign-off Dec 2015 | 4900 Fulton St | E F Mcginness And Sons | dryrot repair & window replacement along westwall of 2nd, 3rd & 4th floor. replace wood balconies with pre-fab steel. this is a suppliment to pa 201505186546.Details
dryrot repair & window replacement along westwall of 2nd, 3rd & 4th floor. replace wood balconies with pre-fab steel. this is a suppliment to pa 201505186546. | $28,000 |
| Feb 4, 2015 | Completed final sign-off Oct 2016 | 504 Andover St | Bioneer Builders | comply w/ nov #201517551. revision to appl. 2013.1231.5392. add toilet, change size of garage and roof deck from 25'-0"x28'-0" to 23'4"x31'-6".Details
comply w/ nov #201517551. revision to appl. 2013.1231.5392. add toilet, change size of garage and roof deck from 25'-0"x28'-0" to 23'4"x31'-6". | $20,000 |
| Oct 27, 2014 | Completed final sign-off Feb 2016 | 1245 Francisco St | seismic retrofit per pf ord no 54-10. no change to building footprint or exterior appearance. 2012 iebc appendix a-4Details
seismic retrofit per pf ord no 54-10. no change to building footprint or exterior appearance. 2012 iebc appendix a-4 | $60,000 | |
| Oct 27, 2014 | Completed final sign-off Feb 2016 | 1229 Francisco St | seismic retrofit per sf ordinance s4-10 no change to building footprint or exterior appearance. engineering criteria 2012 iebc appendix a-4.Details
seismic retrofit per sf ordinance s4-10 no change to building footprint or exterior appearance. engineering criteria 2012 iebc appendix a-4. | $50,000 | |
| Sep 22, 2014 | Completed final sign-off Jan 2016 | 4900 Fulton St | Hcg Associates Inc | dryrot repair in kind. add new steel columns & foundation at southeast corner.Details
dryrot repair in kind. add new steel columns & foundation at southeast corner. | $15,000 |
| Feb 6, 2014 | Completed final sign-off Jun 2015 | 4205 25th St | Fred Pavlow Co. Inc Dba Add-A-Garage | at (e) first floor garage. modify (e) garage door, remove (e) garage door & install 2 separate 8'-0" garage door. for residential use. compliance with ordinance #155-13 not requiredDetails
at (e) first floor garage. modify (e) garage door, remove (e) garage door & install 2 separate 8'-0" garage door. for residential use. compliance with ordinance #155-13 not required | $4,000 |
| Jul 1, 2013 | Completed final sign-off May 2015 | 4218 26th St | Britannia Construction, Inc. | fire damage restoration within approx. 390 sq.ft. on 2/f & 3/f of a 3-story building. remove & replace charred or damaged material & replace per current building code to comply with nov# 201383771. revision & additional information to pa# 201301157972Details
fire damage restoration within approx. 390 sq.ft. on 2/f & 3/f of a 3-story building. remove & replace charred or damaged material & replace per current building code to comply with nov# 201383771. revision & additional information to pa# 201301157972 | $10,000 |
| Jun 20, 2013 | Completed final sign-off Jul 2013 | 200 Brannan St | Justin Farrelly Incorporated | replace stair rail and mezz guardrail with glass rail and guardrail.Details
replace stair rail and mezz guardrail with glass rail and guardrail. | $4,000 |
| Mar 20, 2013 | Completed final sign-off Sep 2013 | 4201 21st St | Pascal Liope | kitchen remodeling: non bearing wall remodel. replace 3 extg windows, wood & aluminum clad, double hung, u-factor 0.40 max. no change in wondow size location.Details
kitchen remodeling: non bearing wall remodel. replace 3 extg windows, wood & aluminum clad, double hung, u-factor 0.40 max. no change in wondow size location. | $21,625 |
| May 17, 2012 | Completed final sign-off May 2012 | 3400 Clay St | E F Mcginness And Sons | foundation repair, support to be added to front section of foundation, approx 12' long, new small 'l' shape shoe foundation dowled & epoxied to existing as per drawings.Details
foundation repair, support to be added to front section of foundation, approx 12' long, new small 'l' shape shoe foundation dowled & epoxied to existing as per drawings. | $7,000 |
| May 13, 2011 | Completed final sign-off Feb 2012 | 639 Spruce St | Hcg Associates Inc | remove and replace extg garage foundation wall. close in exterior door and add window. add new washer & dryer hook up. jack 2nd floor to level position, add new floor framing.Details
remove and replace extg garage foundation wall. close in exterior door and add window. add new washer & dryer hook up. jack 2nd floor to level position, add new floor framing. | $50,000 |
| Feb 11, 2011 | Completed final sign-off Jan 2012 | 2017 14th Av | Pascal Liope | construct a new deck 8' x 15' and landing and stair in back of house on 2nd floor. new landing and stairs.Details
construct a new deck 8' x 15' and landing and stair in back of house on 2nd floor. new landing and stairs. | $47,000 |
| Dec 23, 2008 | Completed final sign-off Feb 2009 | 2650 17th Av | partial structural strengthening upgrade of ground floorDetails
partial structural strengthening upgrade of ground floor | $12,000 | |
| Jul 24, 2008 | Expired or cancelled expired May 2011 | 460 Day St | new interior common stair to provide access to new common laundry room. remodel existing bathrooms and voluntary building strengthening. no exterior work.Details
new interior common stair to provide access to new common laundry room. remodel existing bathrooms and voluntary building strengthening. no exterior work. | $75,000 | |
| Dec 17, 2007 | Completed final sign-off Jul 2008 | 75 Curtis St | W & J Plumbing Co. | construct 1 level deck and stair at rear yardDetails
construct 1 level deck and stair at rear yard | $7,000 |
| Dec 5, 2007 | Completed final sign-off May 2008 | 75 Curtis St | construct new shower room @ (e) pantry area, new wet bar @ (e) living room.Details
construct new shower room @ (e) pantry area, new wet bar @ (e) living room. | $10,000 | |
| Sep 10, 2007 | Never finaled issued Sep 2007, no final | 1419 16th Av | revision to pa# 2006/05/17/1821 s-1-r-1. relocate steel frame in garage 6' from previously approved location.Details
revision to pa# 2006/05/17/1821 s-1-r-1. relocate steel frame in garage 6' from previously approved location. | $1,500 | |
| Sep 4, 2007 | Completed final sign-off Sep 2008 | 1680 08th Av | structural improvement: add plywood shearwall @ garage and basement levels. add concrete piers and grade beams at rear and side foundations.Details
structural improvement: add plywood shearwall @ garage and basement levels. add concrete piers and grade beams at rear and side foundations. | $30,000 | |
| Aug 10, 2007 | Completed final sign-off Jul 2008 | 2122 Kirkham St | remodel existing house, cosntruction of 3 rooms and a bathroom at ground level.Details
remodel existing house, cosntruction of 3 rooms and a bathroom at ground level. | $50,000 | |
| May 30, 2006 | Never finaled issued Feb 2007, no final | 528 Stanyan St | Terence Mcmahon Construction | for site permit only: construct two level deck at the back of the existing three story dwellingDetails
for site permit only: construct two level deck at the back of the existing three story dwelling | $20,000 |
| Apr 20, 2006 | Completed final sign-off Mar 2007 | 96 Miraloma Dr | Wyatt Construction | voluntary earthquake reinforcement. anchor bolts, holdowns, shearwalls, 1 new post & beam structure.Details
voluntary earthquake reinforcement. anchor bolts, holdowns, shearwalls, 1 new post & beam structure. | $30,000 |
| Nov 17, 2005 | Completed final sign-off Jan 2006 | 2977 21st St | Terry Mc Daniel Construction | rmove12 section of (e) center wall. add new hardware to (e) framing, build new partion wall at rear of space for storage. sheetrock mud tape + paint change (e) entry door to new handicap accesible door w/new hardware.Details
rmove12 section of (e) center wall. add new hardware to (e) framing, build new partion wall at rear of space for storage. sheetrock mud tape + paint change (e) entry door to new handicap accesible door w/new hardware. | $18,000 |
| Aug 8, 2005 | Completed final sign-off Dec 2005 | 2101 45th Av | Young Kim Builders Inc | remove (e) fence. retaining wall w/cmu block. w/ grout.Details
remove (e) fence. retaining wall w/cmu block. w/ grout. | $9,500 |
| May 23, 2005 | Completed final sign-off Nov 2005 | 60 Retiro Wy | structural details to (e) permit#200505031485 (additional work to permit).Details
structural details to (e) permit#200505031485 (additional work to permit). | $15,000 |