Daniel Chen
- Listed as
- engineer
- Firm
- Innodez
- On San Francisco permits
- Nov 2021 to Jun 2025
7 permits since 2000 (engineer on 7 permits): 3 completed, 2 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2025 | In progress filed Jun 2025, not yet issued | 1448 12th Av | Matalon S F Inc Dba Creation 7 Builders | remove (e) rear deck.construct (n) horizontal extension at rear.(n) rear deck, front facade mods, widen garage,(n) windows and doors, interior renovations and excavation work under buiding.Details
remove (e) rear deck.construct (n) horizontal extension at rear.(n) rear deck, front facade mods, widen garage,(n) windows and doors, interior renovations and excavation work under buiding. | $400,000 |
| May 22, 2025 | In progress issued Mar 2026 | 254 Jules Av | Fertiz Construction Inc. | revision to pa 2023-0117-0234 replace garage concrete slab post footings and beams. new retaining walls in the backyard, building extends 16" in the back, new permeable pavers in the back. 14" of added new foundationDetails
revision to pa 2023-0117-0234 replace garage concrete slab post footings and beams. new retaining walls in the backyard, building extends 16" in the back, new permeable pavers in the back. 14" of added new foundation | $30,000 |
| Mar 6, 2025 | Completed final sign-off Apr 2025 | 286 San Jose Av | Fertiz Construction Inc. | dry rot repair around the garage door. repair sticco as needed. garage openign stays the same. replace header and install new columnsDetails
dry rot repair around the garage door. repair sticco as needed. garage openign stays the same. replace header and install new columns | $19,512 |
| Aug 3, 2023 | Completed final sign-off Mar 2025 | 356 Chester Av | garage expansion includes 1-new bedroom, 1-bathroom, new window @ rear of bldg, all within bldg envelope.Details
garage expansion includes 1-new bedroom, 1-bathroom, new window @ rear of bldg, all within bldg envelope. | $53,000 | |
| Feb 2, 2023 | Never finaled filed Feb 2023, never issued | 2330 Lane St | erect a new one story manufacturing/retail bldg,no dwellings,no basement.type 2-bDetails
erect a new one story manufacturing/retail bldg,no dwellings,no basement.type 2-b | $550,000 | |
| Feb 2, 2023 | Never finaled filed Feb 2023, never issued | 2330 Lane St | demo a 1 story manufaturing/retail building.Details
demo a 1 story manufaturing/retail building. | $1,000 | |
| Nov 18, 2021 | Completed final sign-off Jan 2025 | 400 Teresita Bl | Excel Site Services Inc, Dan Barrett Construction | 1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windowsDetails
1,000 sf remodel with 90 sf lightwell infill at rear of building. build replacement 350 sf gable roof over lightwell infill area and existing rear of building. locate new bedrooms, remodel & expand (e) kitchen, remodel 2 (e) bathrooms and +1 (n) powder room. rear & side facade work: replace windows | $200,000 |