32 permits since 2000 (contractor on 32 permits, designer on 2 permits): 19 completed, 7 in progress, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2026 | Completed final sign-off Sep 2026 | 223 Fair Oaks St | Cma Development Inc | to obtain final inspection for work approved under pa#202507221365. all work is complete.Details
to obtain final inspection for work approved under pa#202507221365. all work is complete. | |
| Aug 6, 2026 | In progress issued Aug 2026 | 81 Manchester St | Cma Development Inc | revision to approved permit 202506118433. replacement of e roof framing above living area. partial replacment of e floor framing below kitchen area.Details
revision to approved permit 202506118433. replacement of e roof framing above living area. partial replacment of e floor framing below kitchen area. | $40,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 69 Aloha Av | Cma Development Inc | remove (e) failing wood deck, fencing and retaining walls in rear yard construct (n) concrete retaining walls, steps, low planters walls, and deck. install (n) fencing, pergola, and outdoor kitchen.Details
remove (e) failing wood deck, fencing and retaining walls in rear yard construct (n) concrete retaining walls, steps, low planters walls, and deck. install (n) fencing, pergola, and outdoor kitchen. | $30,000 |
| Jun 15, 2026 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | front building: existing stairs & brige from existing front house to the existing rear house to be waterproofed & refinished. the existing bridge structure is to remain. only new drainage, water proofing, deck, & guardrails are proposed. stairs rebuilt in kind.Details
front building: existing stairs & brige from existing front house to the existing rear house to be waterproofed & refinished. the existing bridge structure is to remain. only new drainage, water proofing, deck, & guardrails are proposed. stairs rebuilt in kind. | $5,000 |
| May 26, 2026 | In progress issued May 2026 | 210 Laidley St | Cma Development Inc | (e) building to remain adding a electrical dumbwaiter from the ground floor to the 3rd floor of the (e) building. use to remain the same.Details
(e) building to remain adding a electrical dumbwaiter from the ground floor to the 3rd floor of the (e) building. use to remain the same. | $5,000 |
| Apr 20, 2026 | Expired or cancelled cancelled Sep 2026 | 69 Aloha Av | Cma Development Inc | interior renovation. new windows and doors at rear yard. replacement of all (e) windows and doors in kind, and replace of (e) siding. no sqft change, no vertical or horizontal addition.Details
interior renovation. new windows and doors at rear yard. replacement of all (e) windows and doors in kind, and replace of (e) siding. no sqft change, no vertical or horizontal addition. | $100,000 |
| Apr 20, 2026 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | revision to previous permit pa#202509256084, the existing legal bedroom has 7'4" ceiling height due to sagging and changing the name from "bedroom" to "legal non conforming bedroom". (ref permit: 8708720)Details
revision to previous permit pa#202509256084, the existing legal bedroom has 7'4" ceiling height due to sagging and changing the name from "bedroom" to "legal non conforming bedroom". (ref permit: 8708720) | |
| Mar 13, 2026 | In progress issued Mar 2026 | 1501 Diamond St | Cma Development Inc | convert an existing powder room to a full bath and add a new laundryDetails
convert an existing powder room to a full bath and add a new laundry | $10,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 210 Laidley St | Cma Development Inc | recommencement and completion of work approved under pa#201401287293 & 202101162850Details
recommencement and completion of work approved under pa#201401287293 & 202101162850 | |
| Feb 9, 2026 | In progress issued Sep 2026 | 687 12th Av | Cma Development Inc | add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel .Details
add (n) balcony at (e) sunroom and perform interior renmovation within (e) residence to include 3.5x bathroom and kitchen remodel . | $200,000 |
| Jan 30, 2026 | Completed final sign-off Sep 2026 | 223 Fair Oaks St | Cma Development Inc | structural modification, revision to 202509256084Details
structural modification, revision to 202509256084 | $1,000 |
| Jan 1, 2026 | In progress issued May 2026 | 81 Manchester St | Cma Development Inc | level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundryDetails
level 1:adu convertion per state prgm include: partition for separate entrance from garage.level 2: replace siding @ street & backyard facade & replace window @ street facade in kind.removal (e) fireplace. (n) en-suite bathrm & closet in master bedrm.reconfiguration of existing bathroom and laundry | $180,000 |
| Dec 22, 2025 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | front building: rebuild the existing deck within the same perimeter as existing and structurally reinforce it.Details
front building: rebuild the existing deck within the same perimeter as existing and structurally reinforce it. | $1,500 |
| Sep 25, 2025 | Completed final sign-off Sep 2026 | 223 Fair Oaks St | Cma Development Inc | interior remodel of the lower unit, including remodel of staircase from level 1 to level 2.Details
interior remodel of the lower unit, including remodel of staircase from level 1 to level 2. | $5,000 |
| Sep 25, 2025 | Completed final sign-off Aug 2026 | 223 Fair Oaks St | Cma Development Inc | (front building) modification and replacement of (e) side and rear windows at the lower and level 1 (unit 1). windows will be replaced with new wood fixed and casement windows. (e) wood fixed and casement windows. (n) windows minic (e) windows. replacement of siding in kind where impacted fur outDetails
(front building) modification and replacement of (e) side and rear windows at the lower and level 1 (unit 1). windows will be replaced with new wood fixed and casement windows. (e) wood fixed and casement windows. (n) windows minic (e) windows. replacement of siding in kind where impacted fur out | $4,000 |
| Sep 23, 2025 | Completed final sign-off Jul 2026 | 709 Broderick St | Cma Development Inc | 2/f: replacement of rear patio door and window with slight modification to rough opening. replacement of rear patio door at level 3 and level 1 in kind. no change to rough opening.Details
2/f: replacement of rear patio door and window with slight modification to rough opening. replacement of rear patio door at level 3 and level 1 in kind. no change to rough opening. | $10,000 |
| Sep 23, 2025 | Completed final sign-off Jul 2026 | 709 Broderick St | Cma Development Inc | 2nd/f unit: interior remodel w/ minor structural adjustments on 1st/f to support 2nd/f. no footage added. kitchen renovation, and relocation of a powder room.Details
2nd/f unit: interior remodel w/ minor structural adjustments on 1st/f to support 2nd/f. no footage added. kitchen renovation, and relocation of a powder room. | $200,000 |
| Jul 22, 2025 | Expired or cancelled expired Aug 2026 | 223 Fair Oaks St | Cma Development Inc | demolition of fireplaces and chimneys in both units. replace one with a gas fireplace insert (1). not visible from the street. front bldg.Details
demolition of fireplaces and chimneys in both units. replace one with a gas fireplace insert (1). not visible from the street. front bldg. | $2,000 |
| Jun 6, 2025 | Completed final sign-off Aug 2025 | 227 Fair Oaks St | Cma Development Inc | rear building: in kind 5x8 bathroom remodel. remove (e) tub and replace shower. replace toilet, vanity. all work is in the rear.Details
rear building: in kind 5x8 bathroom remodel. remove (e) tub and replace shower. replace toilet, vanity. all work is in the rear. | $20,000 |
| Sep 11, 2024 | Completed final sign-off Feb 2025 | 63 Carmel St | Cma Development Inc | to obtain final inspection for work approved under pa# 202202077504, 202206166494, and 202210275345. all work is complete.Details
to obtain final inspection for work approved under pa# 202202077504, 202206166494, and 202210275345. all work is complete. | |
| Mar 7, 2024 | Completed final sign-off Feb 2025 | 63 Carmel St | Cma Development Inc | revision to 201507010460. remove elevator use as storage, wine, laundry closet. add 4 skylights with parapet.Details
revision to 201507010460. remove elevator use as storage, wine, laundry closet. add 4 skylights with parapet. | $5,000 |
| Oct 27, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | rev to pa# 2022-0616-6494, 2022-0207-7504, 2015-0701-0460 s1,s2: basement - storage to omedia room (n) wet bar, 1st fl. windows/glass doors, recesed to provied 3ft protection clearance at rear, 2nd & 3rd fl. reconfigure layout and stair, roof-remove access stairDetails
rev to pa# 2022-0616-6494, 2022-0207-7504, 2015-0701-0460 s1,s2: basement - storage to omedia room (n) wet bar, 1st fl. windows/glass doors, recesed to provied 3ft protection clearance at rear, 2nd & 3rd fl. reconfigure layout and stair, roof-remove access stair | $5,000 |
| Aug 1, 2022 | Completed final sign-off Jan 2023 | 125 Lundys Ln | Cma Development Inc | install new fence along north and south sides of property. fence to be 6ft above top of (e) retaining walls.Details
install new fence along north and south sides of property. fence to be 6ft above top of (e) retaining walls. | $18,000 |
| Jun 16, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | revision to pa# 201507010460 s1 & 202202077504. revision to foundation design, shoring design and basement layout.Details
revision to pa# 201507010460 s1 & 202202077504. revision to foundation design, shoring design and basement layout. | |
| Feb 7, 2022 | Expired or cancelled expired Feb 2025 | 63 Carmel St | Cma Development Inc | revision to pa 2015-0701-0460-s1 to create basement storage areaDetails
revision to pa 2015-0701-0460-s1 to create basement storage area | $52,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 3201 Mission St | Cma Development Inc | to comply with nov 202183481 item #2: provide handrail to rear exterior staircase. fix selectirve dryrot areas on same staircase. less than 50% of stair will be altered.Details
to comply with nov 202183481 item #2: provide handrail to rear exterior staircase. fix selectirve dryrot areas on same staircase. less than 50% of stair will be altered. | $5,000 |
| Oct 15, 2021 | Expired or cancelled cancelled Sep 2022 | 59 Carmel St | Cma Development Inc | underpin foundation on west side only adjacent to 63 carmel st.Details
underpin foundation on west side only adjacent to 63 carmel st. | $25,000 |
| Jun 1, 2021 | Completed final sign-off Feb 2022 | 78 Malta Dr | Cma Development Inc | full kitchen remodel to include demo & replacement of all (e) cabinet fixtures, appliances. full remodel of 2 f full & 1 half bath. (n) gas fireplace (n) 42"h glass guardrail @ entry stair (n) interior doorsDetails
full kitchen remodel to include demo & replacement of all (e) cabinet fixtures, appliances. full remodel of 2 f full & 1 half bath. (n) gas fireplace (n) 42"h glass guardrail @ entry stair (n) interior doors | $50,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2021 | 1748 Leavenworth St | Cma Development Inc | full kitchen remodel to include demo of all (e) lathe & plaster on walls & ceiling, cabinets, appliances, flooring. replace with (n) sheetrock walls, cabinets, fixtures, appliances, recessed lighting. replace 2 kitchen windows in kind. remove 3rd window. install (n) skylight.Details
full kitchen remodel to include demo of all (e) lathe & plaster on walls & ceiling, cabinets, appliances, flooring. replace with (n) sheetrock walls, cabinets, fixtures, appliances, recessed lighting. replace 2 kitchen windows in kind. remove 3rd window. install (n) skylight. | $25,000 |
| Apr 24, 2019 | Completed final sign-off Mar 2023 | 830 Rhode Island St | Cma Development Inc | to demolish a 2-story, type 5b, single family bldg. new bldg under pa# 2019-0424-8812.Details
to demolish a 2-story, type 5b, single family bldg. new bldg under pa# 2019-0424-8812. | $25,000 |
| Apr 24, 2019 | Completed final sign-off Mar 2023 | 830 Rhode Island St | Cma Development Inc | to erect a 4-story, type 3b, residential bldg w/ 3 units.Details
to erect a 4-story, type 3b, residential bldg w/ 3 units. | $975,000 |
| Feb 19, 2019 | Completed final sign-off Mar 2023 | 125 Lundy's Ln | Cma Development Inc | compliance with the planning enforcement complain#: 2019-004617enf in reference to issued permits 201710040417 & 201807315995 interior remodel within approved building boundary.Details
compliance with the planning enforcement complain#: 2019-004617enf in reference to issued permits 201710040417 & 201807315995 interior remodel within approved building boundary. | $500,000 |