Steven Epple
- Listed as
- architect
- Firm
- Callison Architecture
- Based in
- Seattle
- On San Francisco permits
- Aug 2004 to Aug 2013
19 permits since 2000 (architect on 19 permits): 14 completed, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2013 | Completed final sign-off Dec 2013 | 3251 20th Av | Loder Construction | space #101: new storefront, restroom, reflective ceiling finishes, walls 1705 sq ft retail store got sleepDetails
space #101: new storefront, restroom, reflective ceiling finishes, walls 1705 sq ft retail store got sleep | $350,000 |
| Apr 12, 2012 | Completed final sign-off Nov 2012 | 225 Parker Av | recoat asphalt paving and restripeDetails
recoat asphalt paving and restripe | $5,000 | |
| Oct 6, 2010 | Expired or cancelled withdrawn May 2012 | 1318 Stockton St | modification to planning application #201008038014.Details
modification to planning application #201008038014. | $10,000 | |
| Aug 3, 2010 | Expired or cancelled cancelled Nov 2011 | 1318 Stockton St | site plan application for modification of facade of existing bank use space to relocate atm and install second atm with night depository.Details
site plan application for modification of facade of existing bank use space to relocate atm and install second atm with night depository. | $50,000 | |
| Feb 17, 2010 | Completed final sign-off Jan 2011 | 2500 Mission St | Deb Construction Llc | chase bank. demolition of (e) exterior wall to allow min. 3 ft setback from property line for two new atm openings. all interior work incl. electrical, mech, struc and finishes will be submitted under separate permitDetails
chase bank. demolition of (e) exterior wall to allow min. 3 ft setback from property line for two new atm openings. all interior work incl. electrical, mech, struc and finishes will be submitted under separate permit | $15,000 |
| Nov 18, 2009 | Completed final sign-off Sep 2010 | 700 Market St | Dbsi Inc Dba Design Build Solutions & In | revision to application 200906089953. revised floor and furniture layout, includes tellerline, workroom and relocation of electrical room door. revised electrical and mechanical to accomodate changes work limited to 1st floor. occupant load verification.Details
revision to application 200906089953. revised floor and furniture layout, includes tellerline, workroom and relocation of electrical room door. revised electrical and mechanical to accomodate changes work limited to 1st floor. occupant load verification. | $47,000 |
| Jun 23, 2009 | Expired or cancelled expired Aug 2011 | 98 West Portal Av | Turner Construction Co | interior tenant improvement to an (e) bank branch, new non-structural partitions, furnitures, finishes, relocate supply/return diffusers, relocate power/data, relocate & provide new drinking fountains (hi/lo), new external package receiver thru existing cmv/wall, new atm surround in existing openingDetails
interior tenant improvement to an (e) bank branch, new non-structural partitions, furnitures, finishes, relocate supply/return diffusers, relocate power/data, relocate & provide new drinking fountains (hi/lo), new external package receiver thru existing cmv/wall, new atm surround in existing opening | $96,416 |
| May 15, 2009 | Never finaled issued Jun 2009, no final | 5655 Geary Bl | Reeve-Knight Construction Inc. | t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround.Details
t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround. | $96,416 |
| Apr 3, 2009 | Completed final sign-off Nov 2009 | 4669 Mission St | Richlen Construction | demolition of existing soffits & non-structural partitions & ceiling system. remodel will consist of patching back ceiling where demo occurred, (n) floor patch back & non-structural partitions. involves minor electrical and hvac.Details
demolition of existing soffits & non-structural partitions & ceiling system. remodel will consist of patching back ceiling where demo occurred, (n) floor patch back & non-structural partitions. involves minor electrical and hvac. | $137,092 |
| Jun 25, 2008 | Completed final sign-off Jul 2010 | 3473 California St | Field Construction Inc. | change of use from butcher shop to bank on ground floor, permit for addition of a walk-up atm and night deposit @ ground level set back 3'-0" from property line. structural addition of out-of-plane wall ties.Details
change of use from butcher shop to bank on ground floor, permit for addition of a walk-up atm and night deposit @ ground level set back 3'-0" from property line. structural addition of out-of-plane wall ties. | $184,200 |
| Mar 6, 2008 | Completed final sign-off Sep 2008 | 4669 Mission St | Oakstone Construction Inc. | ti of (e) 4041 sf space. this includes all interior finishes, new electrical, & hvac destination, & underground plumbing and electrical.Details
ti of (e) 4041 sf space. this includes all interior finishes, new electrical, & hvac destination, & underground plumbing and electrical. | $300,000 |
| Sep 10, 2007 | Completed final sign-off Jan 2008 | 360 Bay St | Gidel & Kocal Construction Co Inc | change of use from restaurant to bank. tenant imporvement consisting of build out of a leased space in an existing, one story, muilt tenant building with parking above. work includes non sturctural partitions, ceiling, finishes, restroom, electrical/data rooms, and replacement of store front.Details
change of use from restaurant to bank. tenant imporvement consisting of build out of a leased space in an existing, one story, muilt tenant building with parking above. work includes non sturctural partitions, ceiling, finishes, restroom, electrical/data rooms, and replacement of store front. | $300,000 |
| Oct 25, 2005 | Completed final sign-off Apr 2007 | 865 Market St | Dome Construction Corp | interior remodel of floors n1 & n2 & n5 spa sales floor & dressing rooms,including new interior finishes,non-structural partitions suspended ceilings & new connection to the mall located on floor n1.all non structuralDetails
interior remodel of floors n1 & n2 & n5 spa sales floor & dressing rooms,including new interior finishes,non-structural partitions suspended ceilings & new connection to the mall located on floor n1.all non structural | $3,200,000 |
| Sep 15, 2005 | Expired or cancelled cancelled Mar 2009 | 1500 Polk St | t.i.for training center on 3/f of an (e)3 story bldg., interior work includes non-structural partition ceilings,finishes & casework,related mechanical,plumbing & electrical work included.Details
t.i.for training center on 3/f of an (e)3 story bldg., interior work includes non-structural partition ceilings,finishes & casework,related mechanical,plumbing & electrical work included. | $300,000 | |
| Jun 17, 2005 | Completed final sign-off Aug 2005 | 1720 Fulton St | Pacific Signaling System | install required fire alarm devices to new tenant space.new devices will be connected to (e)fireDetails
install required fire alarm devices to new tenant space.new devices will be connected to (e)fire | $5,500 |
| May 4, 2005 | Completed final sign-off Jun 2005 | 505 Montgomery St | Dpr Construction Inc | new ceiling ht. wall on 14/f & 3 new ceiling lt. walls on 15/f,paint new walls.no change to occupancDetails
new ceiling ht. wall on 14/f & 3 new ceiling lt. walls on 15/f,paint new walls.no change to occupanc | $20,000 |
| Dec 15, 2004 | Completed final sign-off Aug 2006 | 865 Market St | interior remodel of restrooms on floors n1 & n2,restrooms,dressing rooms & partial sales area on n3Details
interior remodel of restrooms on floors n1 & n2,restrooms,dressing rooms & partial sales area on n3 | $3,100,000 | |
| Dec 6, 2004 | Completed final sign-off Apr 2005 | 278 Post St | Herman/Stewart Constr & Devel | tenant improment on the 1st level of an (e) 6 story building. work includes new exterior,entry doorsDetails
tenant improment on the 1st level of an (e) 6 story building. work includes new exterior,entry doors | $150,000 |
| Aug 17, 2004 | Completed final sign-off Mar 2005 | 505 Montgomery St | Dpr Construction Inc | oti-2 19th floor el meDetails
oti-2 19th floor el me | $150,000 |