Brian Shen
- License
- 4961
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Feb 2020 to Jan 2021
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Pacific Coast Trane Service Co., Skyline Capital Builders Llc
- Architects
- Jeff Luney
- Engineers
- Nathan Tremblay, Saul Villanueva
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2021 | Expired or cancelled cancelled Jan 2026 | 16 Jessie St | all work performed on the roof level. install new flashing and parapet coping at northeast elevation. install new steel parapet bracing along northeast elevation.Details
all work performed on the roof level. install new flashing and parapet coping at northeast elevation. install new steel parapet bracing along northeast elevation. | $150,000 | |
| Dec 23, 2020 | Completed final sign-off May 2021 | 1201 Bryant St | Skyline Capital Builders Llc | installation of pre-fabricated radar chamber on level 1.Details
installation of pre-fabricated radar chamber on level 1. | $5,000 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 650 California St | Pacific Coast Trane Service Co. | replace existing 300 ton cooling tower, serving heat pump loop, with new 300 ton cooling tower, associated piping & electrical.Details
replace existing 300 ton cooling tower, serving heat pump loop, with new 300 ton cooling tower, associated piping & electrical. | $369,000 |