Brian Shen
- Listed as
- engineer
- On San Francisco permits
- Feb 2020 to Jan 2021
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 29, 2021 | Expired or cancelled cancelled Jan 2026 | 16 Jessie St | all work performed on the roof level. install new flashing and parapet coping at northeast elevation. install new steel parapet bracing along northeast elevation.Details
all work performed on the roof level. install new flashing and parapet coping at northeast elevation. install new steel parapet bracing along northeast elevation. | $150,000 | |
| Dec 23, 2020 | Completed final sign-off May 2021 | 1201 Bryant St | Skyline Capital Builders Llc | installation of pre-fabricated radar chamber on level 1.Details
installation of pre-fabricated radar chamber on level 1. | $5,000 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 650 California St | Pacific Coast Trane Service Co. | replace existing 300 ton cooling tower, serving heat pump loop, with new 300 ton cooling tower, associated piping & electrical.Details
replace existing 300 ton cooling tower, serving heat pump loop, with new 300 ton cooling tower, associated piping & electrical. | $369,000 |