Mehdi Mousavi-Nazari
- Listed as
- authorized agent-others, contractor
- Firm
- Bay Best Construction Inc
- Based in
- Danville
- On San Francisco permits
- May 2018 to Aug 2026
17 permits since 2000 (contractor on 17 permits, authorized agent-others on 2 permits): 11 completed, 4 in progress, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 140 Noe St | Bay Best Construction Inc | removing non-bearing wall between the unit & storage. relocating the water-heater from storage to exterior tankless(plumbing). installation of new recess lights(electrical). new flooring & paint. converting storage to closet.Details
removing non-bearing wall between the unit & storage. relocating the water-heater from storage to exterior tankless(plumbing). installation of new recess lights(electrical). new flooring & paint. converting storage to closet. | $35,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1441 Taylor St | Bay Best Construction Inc | unit 301 & 303: general improvement (painting & flooring), relocate kitchen to living rm, repurposing e) kitchen as bedroom, framing laundry closet w/ exhaust fan. no exterior workDetails
unit 301 & 303: general improvement (painting & flooring), relocate kitchen to living rm, repurposing e) kitchen as bedroom, framing laundry closet w/ exhaust fan. no exterior work | $30,000 |
| May 27, 2026 | Completed final sign-off Aug 2026 | 1441 Taylor St | Bay Best Construction Inc | unit 402 - new laundry closet outside the kitchen. to comply with nov 202656584.Details
unit 402 - new laundry closet outside the kitchen. to comply with nov 202656584. | $21,000 |
| May 15, 2026 | Completed final sign-off Aug 2026 | 2315 Bush St | Bay Best Construction Inc | units 1 and 2: bathroom remodel, plumbing insulation, new accesories, and shower valves, kitche drywall repairs. no change in layout.Details
units 1 and 2: bathroom remodel, plumbing insulation, new accesories, and shower valves, kitche drywall repairs. no change in layout. | $25,000 |
| Apr 30, 2026 | In progress issued May 2026 | 70 Crestline Dr | Bay Best Construction Inc | units 2,3,5,6,11- kitchen and bathroom remodel to include replace painting, flooring, add washer and dryer hookups in (e) closet, replace shower valve. all work in kind like for like no wall removal or layout change.Details
units 2,3,5,6,11- kitchen and bathroom remodel to include replace painting, flooring, add washer and dryer hookups in (e) closet, replace shower valve. all work in kind like for like no wall removal or layout change. | $15,000 |
| Dec 31, 2025 | In progress issued Jul 2026 | 1000 Van Ness Av | Bay Best Construction Inc | apple cinemas: existing 14 screen reseat including new finishes and decorative lighting. new concessions on level 2. new bar on level 4.Details
apple cinemas: existing 14 screen reseat including new finishes and decorative lighting. new concessions on level 2. new bar on level 4. | $1,000,000 |
| Oct 12, 2023 | Completed final sign-off Feb 2024 | 750 Great Hy | Bay Best Construction Inc | unit #1: complete remodel of hallway bathroom and master bath. replace bathtub, new vanity, new toilet, flooring and shower walls. remodel in kind, non structuralDetails
unit #1: complete remodel of hallway bathroom and master bath. replace bathtub, new vanity, new toilet, flooring and shower walls. remodel in kind, non structural | $20,000 |
| Jun 8, 2023 | Completed final sign-off Jan 2024 | 20 29th St | Bay Best Construction Inc | based on health inspector, we advised to add undercounter dishwasher machine & handwashing sink inside drinking station in diningDetails
based on health inspector, we advised to add undercounter dishwasher machine & handwashing sink inside drinking station in dining | $3,000 |
| Apr 20, 2023 | Never finaled issued Apr 2023, no final | 10 29th St | Bay Best Construction Inc | revision to permit# 202302172245: reducing scope of work. 20 29th st does not complete. revision to allow final inspection at 10 29th st first floor and whole basement.Details
revision to permit# 202302172245: reducing scope of work. 20 29th st does not complete. revision to allow final inspection at 10 29th st first floor and whole basement. | |
| Feb 17, 2023 | Never finaled issued Mar 2023, no final | 10 29th St | Bay Best Construction Inc | t.i. to comply with complaint for hand washing sink in basement, painting and extending bar sitting, additional hand washing sink, dishwasher per dph request in dining area (bar station).Details
t.i. to comply with complaint for hand washing sink in basement, painting and extending bar sitting, additional hand washing sink, dishwasher per dph request in dining area (bar station). | $20,000 |
| Sep 20, 2022 | Completed final sign-off Sep 2022 | 128 King St | Bay Best Construction Inc | 4/f - suite 400: existing ahu,vav boxes & ductwork to be reused.add one diffuser to (e) ductwork in new wellness room.rebalance outdoor air to specified volume per t24 report. mechanical work only.Details
4/f - suite 400: existing ahu,vav boxes & ductwork to be reused.add one diffuser to (e) ductwork in new wellness room.rebalance outdoor air to specified volume per t24 report. mechanical work only. | |
| Apr 18, 2022 | Completed final sign-off Sep 2022 | 128 King St | Bay Best Construction Inc | 4th fl: interior tenant improvement includes: demo of non-load bearing walls. no add or removed existing sqft under this permit. no structural. construction of non-load bearing walls, etc. deferred submittal: mep & fire protection to be design build.Details
4th fl: interior tenant improvement includes: demo of non-load bearing walls. no add or removed existing sqft under this permit. no structural. construction of non-load bearing walls, etc. deferred submittal: mep & fire protection to be design build. | $540,000 |
| May 13, 2021 | Completed final sign-off Sep 2021 | 198 Dolores St | Bay Best Construction Inc | remove existing windows from the building and marvin fiberglass windows installation. u factor 0.30 street facing.Details
remove existing windows from the building and marvin fiberglass windows installation. u factor 0.30 street facing. | $45,000 |
| Mar 6, 2020 | Completed final sign-off Jun 2020 | 1395 Lyon St | Bay Best Construction Inc | change 8 doors with vinyl in front and back. no change in windows per app#202002134383. admin permit to document no window replacement.Details
change 8 doors with vinyl in front and back. no change in windows per app#202002134383. admin permit to document no window replacement. | |
| Feb 13, 2020 | Completed final sign-off Feb 2020 | 1395 Lyon St | Bay Best Construction Inc | reroofingDetails
reroofing | $18,000 |
| Feb 13, 2020 | Completed final sign-off May 2020 | 1395 Lyon St | Bay Best Construction Inc | replace eight double single-lite french doors on front and rear elevation and windows above with new fiberglass windows and doors and stucco repair. approved otc.Details
replace eight double single-lite french doors on front and rear elevation and windows above with new fiberglass windows and doors and stucco repair. approved otc. | $48,000 |
| May 2, 2018 | Completed final sign-off Jul 2018 | 1890 Jefferson St | Bay Best Construction Inc | unit 302 - dividing 1 bathroom to 2 bathroomsDetails
unit 302 - dividing 1 bathroom to 2 bathrooms | $15,000 |