Permit GraphShortlistSan Francisco building permits since 2000

Block 6596, lot 022

10 29th St

City’s use
Commercial Retail
Built
2004
Stories
2
Units
1
Building
1,657 sq ft
Lot
19,998 sq ft
Zoning
NC3
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 20, 2023Never finaled
issued Apr 2023, no final
10 29th StBay Best Construction Increvision to permit# 202302172245: reducing scope of work. 20 29th st does not complete. revision to allow final inspection at 10 29th st first floor and whole basement.
Details
Permit
202304206114
Status
issued
Filed
Apr 20, 2023
Permit issued
Apr 20, 2023
Address
10 29th St

revision to permit# 202302172245: reducing scope of work. 20 29th st does not complete. revision to allow final inspection at 10 29th st first floor and whole basement.

Open the permit page

Feb 17, 2023Never finaled
issued Mar 2023, no final
10 29th StBay Best Construction Inct.i. to comply with complaint for hand washing sink in basement, painting and extending bar sitting, additional hand washing sink, dishwasher per dph request in dining area (bar station).
Details
Permit
202302172245
Status
issued
Filed
Feb 17, 2023
Permit issued
Mar 16, 2023
Declared cost
$20,000
Address
10 29th St

t.i. to comply with complaint for hand washing sink in basement, painting and extending bar sitting, additional hand washing sink, dishwasher per dph request in dining area (bar station).

Open the permit page

$20,000
Oct 28, 2022Completed
final sign-off Nov 2022
10 29th StL P G Fire Protection Incemergency cpvc repair on 1" cpvc line on rooftop
Details
Permit
202210285365
Status
complete
Filed
Oct 28, 2022
Permit issued
Oct 28, 2022
Final sign-off
Nov 7, 2022
Declared cost
$2,796
Address
10 29th St

emergency cpvc repair on 1" cpvc line on rooftop

Open the permit page

$2,796
Dec 14, 2021Completed
final sign-off Feb 2023
10 29th StSummit Comm Increvision to pa# 202003116711. adding future 5th sector within frp enclosure on roof top, consisting of (3) panel antennas, (5) rrh's and (1) surge suppression.
Details
Permit
202112144349
Status
complete
Filed
Dec 14, 2021
Permit issued
Mar 11, 2022
Final sign-off
Feb 1, 2023
Declared cost
$15,000
Address
10 29th St

revision to pa# 202003116711. adding future 5th sector within frp enclosure on roof top, consisting of (3) panel antennas, (5) rrh's and (1) surge suppression.

Open the permit page

$15,000
Mar 11, 2020Never finaled
issued Sep 2021, no final
10 29th StTot'l Environm'l /Pwer Sym Inc Dba:Tepsinstallation of 4 att sectors with frp enclosures on rooftop install 12 panel antennas 20 rrh's 4 dc surge suppressors, install 1 200a panel
Details
Permit
202003116711
Status
issued
Filed
Mar 11, 2020
Permit issued
Sep 20, 2021
Declared cost
$200,000
Address
10 29th St

installation of 4 att sectors with frp enclosures on rooftop install 12 panel antennas 20 rrh's 4 dc surge suppressors, install 1 200a panel

Open the permit page

$200,000
Aug 13, 2012Never finaled
issued Aug 2012, no final
10 29th Stchange address from 199 tiffany ave. to 10 29th street. block 6596, lot 022.
Details
Permit
M342327
Status
issued
Filed
Aug 13, 2012
Permit issued
Aug 13, 2012
Address
10 29th St

change address from 199 tiffany ave. to 10 29th street. block 6596, lot 022.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Bay Best Construction Inc (2), L P G Fire Protection Inc, Summit Comm Inc, Tot'l Environm'l /Pwer Sym Inc Dba:Teps
Engineers
Wissam Zalzali
Authorized agent-otherss
Azi Bazyar

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.