Block 6596, lot 023
20 29th St
- City’s use
- Commercial Retail
- Built
- 2004
- Stories
- 2
- Units
- 1
- Building
- 2,084 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
3 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 8, 2023 | Completed final sign-off Jan 2024 | 20 29th St | Bay Best Construction Inc | based on health inspector, we advised to add undercounter dishwasher machine & handwashing sink inside drinking station in diningDetails
based on health inspector, we advised to add undercounter dishwasher machine & handwashing sink inside drinking station in dining | $3,000 |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 20 29th St | change address from 199 tiffany ave. to 20 29th street. block 6596, lot 023.Details
change address from 199 tiffany ave. to 20 29th street. block 6596, lot 023. | ||
| Aug 13, 2012 | Completed final sign-off Nov 2012 | 20 29th St | Schneller Electric | create new handicap unisex toilet (restrooms) at ground floor (1st floor), commerical space (restaurant). barrier removal to provide restroom on ground floor. per rudy prada no need route to health dept.Details
create new handicap unisex toilet (restrooms) at ground floor (1st floor), commerical space (restaurant). barrier removal to provide restroom on ground floor. per rudy prada no need route to health dept. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Best Construction Inc, Schneller Electric
- Architects
- Suheil Shatara
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.