Sam Hamood Aloudi
- Listed as
- contractor, designer
- Firm
- Oudi Construction Dba Audi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jul 2026
26 permits since 2000 (contractor on 26 permits, designer on 1 permit): 13 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 3895 Clay St | Oudi Construction Dba Audi Construction | total kitchen remodeling and total bathroom remodeling in kind. new cabinets, new counter tops & new flooring. for the bathroom new flooring, new fixturesDetails
total kitchen remodeling and total bathroom remodeling in kind. new cabinets, new counter tops & new flooring. for the bathroom new flooring, new fixtures | $25,000 |
| Jun 9, 2026 | In progress issued Sep 2026 | 1199 South Van Ness Av | Oudi Construction Dba Audi Construction | to comply with nov# 202657272: interior cosmetic remodel to existing coffee shope. disabled access upgrades.Details
to comply with nov# 202657272: interior cosmetic remodel to existing coffee shope. disabled access upgrades. | $20,000 |
| Dec 1, 2025 | Completed final sign-off Jun 2026 | 163 Moffitt St | Oudi Construction Dba Audi Construction | legalize 1st fl office to be converted to master bed. install new master closet & master bath at 1st fl. remove (e) wall between kitchen & living room. rehabilitate existing kitchen.Details
legalize 1st fl office to be converted to master bed. install new master closet & master bath at 1st fl. remove (e) wall between kitchen & living room. rehabilitate existing kitchen. | $60,000 |
| Oct 22, 2025 | Completed final sign-off Feb 2026 | 3250 Mission St | Oudi Construction Dba Audi Construction | installation walk-in cooler and installation of display case and prep room.Details
installation walk-in cooler and installation of display case and prep room. | |
| Sep 22, 2025 | In progress issued Mar 2026 | 555 Fulton St | Oudi Construction Dba Audi Construction | prop h: ti into a coffee cafe w/ front seating area. demo portions of concrete slab to provide under-slab plumbing. new work consist interior walls to build commercial kitchen, storage area, & accessible customer restroom. (n) ceiling soffit service counter area & drop ceiling @ rear kitchen/storageDetails
prop h: ti into a coffee cafe w/ front seating area. demo portions of concrete slab to provide under-slab plumbing. new work consist interior walls to build commercial kitchen, storage area, & accessible customer restroom. (n) ceiling soffit service counter area & drop ceiling @ rear kitchen/storage | $480,000 |
| Jul 18, 2025 | In progress issued Oct 2025 | 155 Moffitt St | Oudi Construction Dba Audi Construction | demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairwayDetails
demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairway | $75,000 |
| Apr 18, 2025 | In progress issued Apr 2025 | 781 11th Av | Oudi Construction Dba Audi Construction | revision to permit 202503101937 to include patch sheet rpck & tile to hallway, living room, dining room, bedrooms. perform drywall patch & replace throughout hallway, kitchen, bathrooms, living room, dining room, bedrooms. complete remodel of bathrooms and kitchen countertops, cabinets, appliances.Details
revision to permit 202503101937 to include patch sheet rpck & tile to hallway, living room, dining room, bedrooms. perform drywall patch & replace throughout hallway, kitchen, bathrooms, living room, dining room, bedrooms. complete remodel of bathrooms and kitchen countertops, cabinets, appliances. | $10,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 781 11th Av | Oudi Construction Dba Audi Construction | patch, sheetrock, and retile: bathroom and kitchen.Details
patch, sheetrock, and retile: bathroom and kitchen. | $19,000 |
| Feb 18, 2025 | Completed final sign-off Oct 2025 | 101 Otsego Av | Oudi Construction Dba Audi Construction | 1)comply w/ enf2024-005956enf: removal of shed excess.2)remove existing unpermitted kitchen at 1st floor filed under seperate permit. 3) remove two sheds in the back to comply w/ allowance 100 sq ft of rear yard shed.Details
1)comply w/ enf2024-005956enf: removal of shed excess.2)remove existing unpermitted kitchen at 1st floor filed under seperate permit. 3) remove two sheds in the back to comply w/ allowance 100 sq ft of rear yard shed. | $7,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2025 | 155 Moffitt St | Oudi Construction Dba Audi Construction | total bath remodeling, tile, bathtub, converted to shower. remove existing door and convert to pocket door. no change in size.Details
total bath remodeling, tile, bathtub, converted to shower. remove existing door and convert to pocket door. no change in size. | $10,000 |
| Jul 22, 2024 | Completed final sign-off Nov 2024 | 2810 Diamond St | Oudi Construction Dba Audi Construction | replacing tiles through out the premises. replacing damaged drywall. replacing underground sewer pipes from sink to drain. replacing effected electrical panel. no changes to plumbing fixtures.Details
replacing tiles through out the premises. replacing damaged drywall. replacing underground sewer pipes from sink to drain. replacing effected electrical panel. no changes to plumbing fixtures. | $40,000 |
| Jun 12, 2023 | Never finaled issued Jun 2023, no final | 64 Chenery St | Oudi Construction Dba Audi Construction | repair deteriorated framing @ bathroom including stud ways decayed floor & roof framing &deteriorated concrete flooring.Details
repair deteriorated framing @ bathroom including stud ways decayed floor & roof framing &deteriorated concrete flooring. | $35,000 |
| Apr 3, 2023 | Never finaled issued Apr 2023, no final | 64 Chenery St | Oudi Construction Dba Audi Construction | comply w/nov 202301249 remove damaged drywall at front & rear porton, repair in kind damaged dry wall in front and rear patio, main disconncted to electrical panel, rear portion of home is (e) non conforming only, repair in kindDetails
comply w/nov 202301249 remove damaged drywall at front & rear porton, repair in kind damaged dry wall in front and rear patio, main disconncted to electrical panel, rear portion of home is (e) non conforming only, repair in kind | $12,000 |
| Nov 8, 2022 | Completed final sign-off May 2023 | 2810 Diamond St | Oudi Construction Dba Audi Construction | customer's bathroom remodeling complete update. customer's area flooring(new tile). no exterior work.Details
customer's bathroom remodeling complete update. customer's area flooring(new tile). no exterior work. | $18,000 |
| Dec 30, 2021 | Never finaled issued Dec 2021, no final | 1701 Mckinnon Av | Oudi Construction Dba Audi Construction | revision to bpa 2021.0609.2028 correction to foundation work to document excavation work by lowering slab 1 foot on foundation level, approxiately 1000 sq ft. replace 4 interior post footings; foundation replacement to gridline a omittedDetails
revision to bpa 2021.0609.2028 correction to foundation work to document excavation work by lowering slab 1 foot on foundation level, approxiately 1000 sq ft. replace 4 interior post footings; foundation replacement to gridline a omitted | $10,000 |
| Nov 19, 2021 | Completed final sign-off Dec 2021 | 2040 Ocean Av | Oudi Construction Dba Audi Construction | interior painting of dining area, cleaning 7 grouting of (e) floor tile. repolacing bathroom door (not frame) and rpelacing sinks incooking area. to comply with pid202184560 and bid202184407 complaints. no structural work or layout changes.Details
interior painting of dining area, cleaning 7 grouting of (e) floor tile. repolacing bathroom door (not frame) and rpelacing sinks incooking area. to comply with pid202184560 and bid202184407 complaints. no structural work or layout changes. | $9,000 |
| Nov 5, 2021 | Completed final sign-off Nov 2021 | 1850 Mission St | Oudi Construction Dba Audi Construction | replacing bottom sill on 6 windows on 2nd floor: removing window on 1st floor, water proof it and re-install existing window back.Details
replacing bottom sill on 6 windows on 2nd floor: removing window on 1st floor, water proof it and re-install existing window back. | $9,300 |
| Jun 9, 2021 | Never finaled issued Jun 2021, no final | 1701 Mckinnon Av | Oudi Construction Dba Audi Construction | replace old foundation. pour concrete on garage levelDetails
replace old foundation. pour concrete on garage level | $50,000 |
| Feb 24, 2021 | Expired or cancelled cancelled Jan 2026 | 1701 Mckinnon Av | Oudi Construction Dba Audi Construction | reinforcing old foundation & pouring concrete on garage level floor.Details
reinforcing old foundation & pouring concrete on garage level floor. | $20,000 |
| Feb 28, 2019 | Never finaled issued Jul 2019, no final | 658 06th Av | Oudi Construction Dba Audi Construction | unit a. kitchen and bathroom remodel. updating drywall, electrical and painting.Details
unit a. kitchen and bathroom remodel. updating drywall, electrical and painting. | $55,000 |
| Feb 13, 2019 | Expired or cancelled cancelled Jan 2026 | 3279 Mission St | Oudi Construction Dba Audi Construction | 1st flr bathroom remodel at commercial space. new flooring, updating electrical and plumbing, painting.Details
1st flr bathroom remodel at commercial space. new flooring, updating electrical and plumbing, painting. | $35,000 |
| Jun 7, 2017 | Completed final sign-off Jul 2018 | 658 06th Av | Oudi Construction Dba Audi Construction | unit #a: (front building only) remodel 1 kitchens, 2 bathrooms upgrade ele. patch walls & paintDetails
unit #a: (front building only) remodel 1 kitchens, 2 bathrooms upgrade ele. patch walls & paint | $60,000 |
| Nov 3, 2015 | Completed final sign-off Mar 2016 | 1151 Hollister Av | Oudi Construction Dba Audi Construction | restorage of same framing parts-remodeling 2 bathrooms-re-dry wall in 1st flr & 2 rooms in 2nd flr-back, elevation siding-restoration of flooring in the 2 stories,reroofing,painting interior & exterior-restoring deck in back in-kind.Details
restorage of same framing parts-remodeling 2 bathrooms-re-dry wall in 1st flr & 2 rooms in 2nd flr-back, elevation siding-restoration of flooring in the 2 stories,reroofing,painting interior & exterior-restoring deck in back in-kind. | $80,000 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 25 Kiska Rd | Hercules Builders, Oudi Construction Dba Audi Construction | changing kitchen cabinets, installing new kitchen lights, painting, texture & taping. install closet doorsDetails
changing kitchen cabinets, installing new kitchen lights, painting, texture & taping. install closet doors | $2,000 |
| Oct 29, 2008 | Completed final sign-off Apr 2009 | 4517 03rd St | Oudi Construction Dba Audi Construction | add a deli and pizza corner inside the existing grocery store, and add accessible bathroom.Details
add a deli and pizza corner inside the existing grocery store, and add accessible bathroom. | $50,000 |
| Jun 2, 2008 | Completed final sign-off Jun 2019 | 1703 Mckinnon Av | Oudi Construction Dba Audi Construction | to erect 3 storie, no basement, single family dwelling building.Details
to erect 3 storie, no basement, single family dwelling building. | $125,000 |